CORRESPONDENCE - BID - 7658 MISCELLANEOUS CONCRETE ANNUAL (42)
202.01 Sawcut Concrete/Asphalt (0" < 4") Lineal Foot $3.47 $ - $ 3.47 $ - 202.02 Sawcut Concrete/Asphalt (4" < 6") Lineal Foot $3.68 $ - $ 3.68 $ - 202.03 Sawcut Concrete/Asphalt (6" < 8") Lineal Foot $3.99 $ - $ 3.99 $ - 202.04 Sawcut Concrete/Asphalt (8" ≤ 10") Lineal Foot $5.78 $ - $ 5.78 $ - 202.05 Sawcut - Additional 1" Depth Lineal Foot $1.26 $ - $ 1.26 $ - 202.06 Remove Concrete Sidewalk Square Foot 3588 $3.57 $ 12,809.16 $ 3.57 $ - 202.07 Remove Concrete Curb & Gutter Lineal Foot $6.09 $ - $ 6.90 $ - 202.08 Remove Monolithic Curb, Gutter & Sidewalk Square Foot $3.89 $ - $ 3.89 $ - 202.09 Remove Concrete Driveway/Apron/Crosspan Square Foot 1190 $4.15 $ 4,938.50 $ 4.15 $ - 202.10 Remove Concrete Pavement - 10" Square Foot 400 $4.94 $ 1,976.00 $ 4.94 $ - 202.11 Remove Concrete Pavement - Additional 1" Depth Square Foot $1.05 $ - $ 1.05 $ - 202.12 Remove Asphalt - 6" Square Foot $2.73 $ - $ 2.73 $ - 202.13 Remove Asphalt - Additional 1" Depth Square Foot $1.05 $ - $ 1.05 $ - 202.14 Remove Inlet Each $540.75 $ - $ 540.75 $ - 202.15 Remove and Haul Driveway Fillet Each $52.50 $ - $ 52.50 $ - 202.16 Remove Flagstone Square Foot $3.15 $ - $ 3.15 $ - 203.01 Excavation - General Less Than 50 CY Cubic Yard $49.35 $ - $ 49.35 $ - 203.02 Excavation - General Over 50 CY Cubic Yard $44.10 $ - $ 44.10 $ - 203.03 Excavation - Walls Only Cubic Yard $12.08 $ - $ 12.08 $ - 203.04 Excavation - New Inlet Each $425.25 $ - $ 425.25 $ - 203.05 Borrow - Less than 100 Ton Ton $26.25 $ - $ 26.25 $ - 203.06 Borrow - Over 100 Ton Ton $23.10 $ - $ 23.10 $ - 207.01 Imported Topsoil Cubic Yard $32.81 $ - $ 32.81 $ - 208.01 Stormwater Protection - Rock Filled Wattle Lineal Foot $12.08 $ - $ 12.08 $ - 208.02 Stormwater Protection - Recycled Rubber Filled Wattle Lineal Foot $16.80 $ - $ 16.80 $ - 208.03 Stormwater Protection - Straw Bales Each $21.00 $ - $ 21.00 $ - 210.01 Reset Flagstone Square Foot $4.20 $ - $ 4.20 $ - 210.02 Reset Brick Pavers Square Foot $8.40 $ - $ 8.40 $ - 210.03 Adjust Manhole Each $105.00 $ - $ 105.00 $ - 210.04 Adjust Valve Box Each $105.00 $ - $ 105.00 $ - 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons Ton $40.95 $ - $ 40.95 $ - 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons Ton $38.85 $ - $ 38.85 $ - 304.03 Recycled Asphalt Base Ton $26.25 $ - $ 26.25 $ - 403.01 Temporary Asphalt Patching Ton $215.25 $ - $ 215.25 $ - 601.01 Exposed Sand Finish - Additional Charge Square Foot $3.68 $ - $ 3.68 $ - 602.01 Reinforcing Steel Pound $2.30 $ - $ 2.30 $ - 602.02 Reinforcing Steel - Epoxy Coated Pound $3.45 $ - $ 3.45 $ - 604.01 Install New Area Inlet Each $1,485.00 $ - $ 1,485.00 $ - 604.08 Curb Inlet – Additional Foot Depth Lineal Foot $115.50 $ - $ 115.50 $ - 604.09 Reconstruct Curb Inlet Deck – Remove and Replace Each $761.25 $ - $ 761.25 $ - 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot $136.50 $ - $ 136.50 $ - 604.11 Install New Type R Inlet - 5' Opening Each $3,680.00 $ - $ 3,680.00 $ - 604.12 Type R Inlet – Additional Foot Depth Lineal Foot $173.25 $ - $ 173.25 $ - 604.13 Reconstruct Type R Inlet Deck – Remove and Replace Each $1,286.25 $ - $ 1,286.25 $ - 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot $131.25 $ - $ 131.25 $ - 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) Each $2,645.00 $ - $ 2,645.00 $ - 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth Lineal Foot $168.00 $ - $ 168.00 $ - 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace Each $1,737.25 $ - $ 1,737.25 $ - 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot $252.00 $ - $ 252.00 $ - 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Iron Works 7030 or Equivalent Material) Each $760.00 $ - $ 760.00 $ - 604.20 Concrete Sidewalk Culvert – 4’ opening Each $624.75 $ - $ 624.75 $ - 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace Each $625.00 $ - $ 625.00 $ - 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only Each $2,130.00 $ - $ 2,130.00 $ - 604.23 Additional Square Foot 5/8" Plate Square Foot $215.00 $ - $ 215.00 $ - 608.01 Driveover Curb, Gutter & 6" Sidewalk Lineal Foot $44.10 $ - $ 44.10 $ - 608.02 Driveover Curb and Gutter - No Sidewalk Lineal Foot $24.68 $ - $ 24.68 $ - 608.03 Vertical Curb, Gutter and 6" Sidewalk Lineal Foot $45.57 $ - $ 45.57 $ - 608.04 Vertical Curb and Gutter - No Sidewalk Lineal Foot $28.35 $ - $ 28.35 $ - 608.05 Out Fall Curb & Gutter Lineal Foot $22.68 $ - $ 22.68 $ - 608.06 Hollywood Curb, Gutter and 6" Sidewalk Lineal Foot $32.18 $ - $ 32.18 $ - 608.07 Hollywood Curb and Gutter - No Sidewalk Lineal Foot $20.06 $ - $ 20.06 $ - 608.08 Highback Curb and Gutter - No Sidewalk Lineal Foot 495 $38.90 $ 19,255.50 $ 38.90 $ - 608.09 Barrier Curb - 6" x 18" Lineal Foot $25.36 $ - $ 25.36 $ - 608.10 Barrier Curb - Key Way Style Lineal Foot $25.36 $ - $ 25.36 $ - 608.11 Barrier Curb - Epoxy Lineal Foot $20.21 $ - $ 20.21 $ - 608.12 Mountable Curb - 12" x 18" Lineal Foot $25.99 $ - $ 25.99 $ - 608.13 Mountable Curb - Keyway Style Lineal Foot $25.36 $ - $ 25.36 $ - 608.14 Mountable Curb – Epoxy Lineal Foot $24.68 $ - $ 24.68 $ - 608.15 Pedestrian Access Ramp Square Foot $8.03 $ - $ 8.03 $ - 608.16 Pedestrian Access Ramp, Highback Curb Square Foot 400 $9.08 $ 3,632.00 $ 9.08 $ - 608.17 Truncated Dome Panel Square Foot $52.75 $ - $ 52.75 $ - 608.18 Apron - 8" Square Foot $8.56 $ - $ 8.56 $ - 608.19 Crosspan - 8" Square Foot $8.56 $ - $ 8.56 $ - 608.20 Valley Pan - 6" Square Foot $7.61 $ - $ 7.61 $ - 608.21 Flatwork - 4" Square Foot $5.25 $ - $ 5.25 $ - 608.22 Flatwork - 6" Square Foot 3,588 $6.09 $ 21,850.92 $ 6.09 $ - 608.34 Fibermesh - Added to Any Item - Additional Charge Pounds / Cubic Yard $10.76 $ - $ 10.76 $ - 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge Cubic Yard $21.00 $ - $ 21.00 $ - 608.36 Stamp Pattern - Added to Any Item, Additional Charge Square Foot $2.89 $ - $ 2.89 $ - 608.37 6" Concrete Bollard Each $464.00 $ - $ 464.00 $ - 608.38 8" Concrete Bollard Each $580.00 $ - $ 580.00 $ - 608.39 Flowable Fill Cubic Yard $120.75 $ - $ 120.75 $ - 608.40 Non-reinforced Concrete Wall - 8" Square Face Foot $17.33 $ - $ 17.33 $ - 608.41 Non-reinforced Concrete Footer - 8" Square Foot $17.33 $ - $ 17.33 $ - 608.42 Concrete Staining/Sealing Square Foot $4.20 $ - $ 4.20 $ - 608.43 Expansion and Caulking Lineal Foot $4.15 $ - $ 4.15 $ - 608.44 Joint Sealant (Pavement) Lineal Foot $4.46 $ - $ 4.46 $ - 608.45 Irrigation Sleeve Lineal Foot $4.46 $ - $ 4.46 $ - 608.46 Dump Fee Ton $58.80 $ - $ 58.80 $ - 608.47 Asphalt Pavement Preservation Lineal Foot $5.78 $ - $ 5.78 $ - 626.01 Mobilization - Invoices Under $1000 $ - 630.01 "NO PARKING" Sign With Stand Per Each Per Day $2.10 $ - $ 2.10 $ - 630.02 Vertical Panel Without Light Per Each Per Day $1.31 $ - $ 1.31 $ - 630.03 Channelizing Barrels Per Each Per Day $1.58 $ - $ 1.58 $ - 630.04 Type I/II Barricade Without Light Per Each Per Day $0.68 $ - $ 0.68 $ - 630.05 Type III Barricade Without Light Per Each Per Day $3.94 $ - $ 3.94 $ - 630.06 Size A Sign With Stand Per Each Per Day $1.89 $ - $ 1.89 $ - 630.07 Size B Sign With Stand Per Each Per Day $2.10 $ - $ 2.10 $ - 630.08 Size A Specialty Sign - Cost of Manufacturing Each $73.50 $ - $ 73.50 $ - 630.09 Size B Specialty Sign - Cost of Manufacturing Each $78.75 $ - $ 78.75 $ - 630.10 Cone With Reflective Strip Per Each Per Day $0.84 $ - $ 0.84 $ - 630.11 Safety Fence Per Roll Per Day $4.46 $ - $ 4.46 $ - 630.12 Light Per Each Per Day $0.53 $ - $ 0.53 $ - 630.13 Advance Warning Flashing or Sequencing Arrow Panel Per Each Per Day $78.75 $ - $ 78.75 $ - 630.14 Variable Message Board Per Each Per Day $183.75 $ - $ 183.75 $ - 630.15 Traffic Control Supervisor Per Day $434.70 $ - $ 434.70 $ - 630.16 Traffic Control Supervisor Hour $45.15 $ - $ 45.15 $ - 630.17 Flagging Hour $29.93 $ - $ 29.93 $ - $ - FA1 Laborer Hour $30.98 $ - $ 30.98 $ - FA2 Foreman Hour $44.10 $ - $ 44.10 $ - FA3 Finisher Hour $39.90 $ - $ 39.90 $ - FA4 Form Setter Hour $38.33 $ - $ 38.33 $ - FA5 Skid Steer Hour $94.50 $ - $ 94.50 $ - FA6 Mini Trackhoe Hour $99.75 $ - $ 99.75 $ - FA7 Dump Truck Hour $84.00 $ - $ 84.00 $ - FA8 Backhoe Hour $99.75 $ - $ 99.75 $ - TOTAL COST $ 74,588.98 $ - ADDITIONAL SERVICES 608.23 Replace Flatwork - 1" Additional Depth Square Foot $1.10 $ - $ 1.10 $ - 608.24 Concrete Pavement 8" (Joints Sealed) Square Foot $8.56 $ - $ 8.56 $ - 608.25 Alley Approach - 8" Square Foot 1190 $8.51 $ 10,126.90 $ 8.51 $ - 608.26 Enhanced Crosswalk - 10" Tile Red Square Foot $13.13 $ - $ 13.13 $ - 608.27 Enhanced Crosswalk - 10" San Diego Buff Square Foot $11.87 $ - $ 11.87 $ - 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped Square Foot $14.07 $ - $ 14.07 $ - 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown Square Foot $7.46 $ - $ 7.46 $ - 608.30 Mow Strip - 4" x 12" Lineal Foot $9.71 $ - $ 9.71 $ - 608.31 Splashblock - 4" Exposed Aggregate Square Foot $7.46 $ - $ 7.46 $ - 608.32 Splashblock - 4" San Diego Buff Square Foot $7.82 $ - $ 7.82 $ - 608.33 Median Cover - 4" San Diego Buff Square Foot $7.82 $ - $ 7.82 $ - 604.02 Area Inlet – Additional Foot Depth Lineal Foot $136.50 $ - $ 136.50 $ - 604.03 Reconstruct Area Inlet Deck – Remove & Replace Each $1,575.00 $ - $ 1,575.00 $ - 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace Lineal Foot $136.50 $ - $ 136.50 $ - 604.05 Reconstruct Catch Basin Deck - Remove & Replace Each $780.00 $ - $ 780.00 $ - 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace Lineal Foot $151.20 $ - $ 151.20 $ - 604.07 Install New Curb Inlet – 4’ Opening Each $2,003.00 $ - $ 2,003.00 $ - UNITS TOTAL Laporte 1 7/15/18 Revised Unit Price ADDENDUM 2 BID SCHEDULE 1 - BASE BID (Non-Federal) Item No. Description Unit Contract Quantity - Estimate Unit Price Total - Estimate PROJECT ESTMATE