Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9184800Invoice Date 7/17/2018 Invoice # 2251 Bill To City of Fort Collins C/O Kari Craven bannerconcrete@gmail.com 1313 Duff Drive Unit 3 Fort Collins, CO 80524 P.O. No. Terms Net 30 Total QuantityDescription Rate Amount Mulberry/Shields EB Bus pad 1.5 Excavation-General less than 50 cu yd 101.37 152.06 10.5 Remove monolithic curb, gutter & sidewalk per sq ft 3.66 38.43 370ft Remove concrete sidewalk per sq 3.66 1,354.20 25 Flatwork--6" per sq ft 3.95 98.75 370 Pedestrian access ramp per sq ft 6.20 2,294.00 12 Truncated dome panel per sq ft 33.79 405.48 10.5 Vertical curb, gutter & 6" sidewalk per lf 30.98 325.29 16 Barrier curb--6" x 18" per lf 25.91 414.56 37 Asphalt pavement preservation per lf 4.51 166.87 17 Expansion and caulking per lf 5.92 100.64 24 Stormwater protection-Rock filled wattle per lf 6.76 162.24 9 Traffic control supervisor per hour 37.03 333.27 7.5 Flagging per hour 25.10 188.25 60 Size A sign with stand per each per day 1.79 107.40 160 Cone with reflective strip per each per day 0.78 124.80 116 Channelizing barrels per each per day 0.95 110.20 2 Advance warning flashing or sequencing arrow panel per each per day 77.37 154.74 $6,531.18