Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9184799Invoice Date 7/17/2018 Invoice # 2253 Bill To City of Fort Collins C/O Kari Craven bannerconcrete@gmail.com 1313 Duff Drive Unit 3 Fort Collins, CO 80524 P.O. No. Terms Net 30 Total QuantityDescription Rate Amount Elizabeth/Constitution Bus Pad 972.ft5 Remove concrete sidewalk per sq 3.66 3,559.35 89.5 Remove concrete curb & gutter per lf 8.45 756.28 127.ft5 Remove concrete driveway/apron/crosspan per sq 3.88 494.70 8.5 Excavation-General less than 50 cu yd 101.37 861.65 330 Pedestrian access ramp per sq ft 6.20 2,046.00 12 Truncated dome panel per sq ft 33.79 405.48 642.5 Flatwork--6" per sq ft 3.95 2,537.88 89.5 Vertical curb & gutter-No sidewalk per lf 23.10 2,067.45 127.5 Apron--8" per sq ft 5.63 717.83 120 Barrier curb--6" x 18" per lf 25.91 3,109.20 5.02 Aggregate base course/Recycled base >5 tons 39.42 197.89 123 Asphalt pavement preservation per lf 4.51 554.73 35 Expansion and caulking per lf 5.92 207.20 24 Stormwater protection-Rock filled wattle per lf 6.76 162.24 17.5 Traffic control supervisor per hour 37.03 648.03 24 Flagging per hour 25.10 602.40 81 Size A sign with stand per each per day 1.79 144.99 200 Cone with reflective strip per each per day 0.78 156.00 75 Channelizing barrels per each per day 0.95 71.25 2 Advance warning flashing or sequencing arrow panel per each per day 77.37 154.74 $19,455.29