HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9184799Invoice
Date
7/17/2018
Invoice #
2253
Bill To
City of Fort Collins
C/O Kari Craven
bannerconcrete@gmail.com
1313 Duff Drive Unit 3
Fort Collins, CO 80524
P.O. No. Terms
Net 30
Total
QuantityDescription Rate Amount
Elizabeth/Constitution Bus Pad
972.ft5 Remove concrete sidewalk per sq 3.66 3,559.35
89.5 Remove concrete curb & gutter per lf 8.45 756.28
127.ft5 Remove concrete driveway/apron/crosspan per sq 3.88 494.70
8.5 Excavation-General less than 50 cu yd 101.37 861.65
330 Pedestrian access ramp per sq ft 6.20 2,046.00
12 Truncated dome panel per sq ft 33.79 405.48
642.5 Flatwork--6" per sq ft 3.95 2,537.88
89.5 Vertical curb & gutter-No sidewalk per lf 23.10 2,067.45
127.5 Apron--8" per sq ft 5.63 717.83
120 Barrier curb--6" x 18" per lf 25.91 3,109.20
5.02 Aggregate base course/Recycled base >5 tons 39.42 197.89
123 Asphalt pavement preservation per lf 4.51 554.73
35 Expansion and caulking per lf 5.92 207.20
24 Stormwater protection-Rock filled wattle per lf 6.76 162.24
17.5 Traffic control supervisor per hour 37.03 648.03
24 Flagging per hour 25.10 602.40
81 Size A sign with stand per each per day 1.79 144.99
200 Cone with reflective strip per each per day 0.78 156.00
75 Channelizing barrels per each per day 0.95 71.25
2 Advance warning flashing or sequencing arrow panel per each per day 77.37 154.74
$19,455.29