Project: 8305 Drake & Shields Intersection Improvements
Time: 2:00 PM
Date: 5/6/16
Location: Conference Room 2A, 215 N Mason St. Fort Collins, CO
NAME
FIRM NAME
ADDRESS
TELEPHONE
E-MAIL ADDRESS
GUA D614
C-10FL
215— !v AA6tso,� �t.
� 0-2Z1 —
e��1�� �(, dv.c,rn,
Jc4;p t4skc--
610 r-(--
aY� �(e(1,e
P4d5•� ��71�"��^E"
�7�o kr�ie L( v.,;�-�
3o3-2
/,Nkc !� e �n.�j�T,'�e.0
`... k FC-
lw
�g
HIGHLIGHTS OF GENERAL CONDITIONS
• Haul Routes
Should maintain Arterial and Collector Streets ONLY.
Contractor will not be allowed to use Residential Streets
to access the site.
■ Site Clean Up
The construction work shall be kept and accomplished in
a neat, clean and orderly fashion
Street sweeping may be required in order to minimize
vehicle tracking and to meet EPA storm water quality
requirements
Fo'r'to,ollins
TRAFFIC CON Ua u. wr v_.......,
Contractor Responsibilities:
Maintain vehicle, bicycle, and pedestrian traffic at all
times. ALL detours for ALL modes of transportation shall
be approved by the City prior to construction.
Maintain / coordinate access to all local businesses.
Review all upcoming lane closure needs and /or changes
in traffic control set up at Weekly Progress Meetings
Traffic Control Plans need to be submitted to the City
seven (7) days prior to setup
s 8M ollins
■ Contractor Responsibilities:
Erosion Control in accordance with Sheets 31-32
The Contractor is responsible for maintaining and
repairing all erosion control devices throughout the
project
Contractor will designate a SWMP Administrator prior to
the start of construction. The SWMP Administrator will
conduct weekly inspections, post storm event reports and
submit a signed, log of activity weekly to the City.
-Ft�. .
19
MATERIAL SUBMITTALS
■ Reviewed by the City
• Process Time — 5-7 days per submittal
WEATHER DAYS
■ See "Summary of Work" Section
Monthly Anticipated Calendar Days Lost to
Adverse Weather Conditions
20
COMPONENTS OF IMPROVMENTS
202 Tree / Stump Removal
AWfAR SMAZr
a.
,LL w� ese
• a�,e nsa �7
Example of tree removal locations
Non — conventional alignment
Fort Colons
Private Utility Relocation
Currently underway
'itoltins
24
Signal relocation / reset, vast amounts of utilities
Fora tbns
Fairly clear, tree protection essential, signal relocation
FortJo(lms
14
NOTE:
1. THE FULL DEPTH PAVEMENT SECTION SMALL CONSIST
OF THE FOLLOWING:
• 3" HMA (GRADING S) (100) (PG 64-28)
MODIFIED BINDER MIX 'MATH MODIFIED OIL
• 5- HMA (GRADING S) (75) (PG 58-28) (2 - 2 1/2-
• 12" ABC (CLASS 5 OR 6)
• EX SUBGRADE
2. THE ASPHALT MAT PLANING SECTION SHALL CONSIST
OF THE FOLLOWING:
• 3" HMA (GRADING S) (100) (PG 64-28)
MODIFIED BINDER MIX WITH IAODIFlED OIL
I�
Thanks for Attending!
Questions and Clarifications can be Directed to via email no
later than 5:00 PM May 11,", 2016:
■ Tracy Dyer — Capital Projects Manager
Office (970) 416.2011
Email td er _fc oc�v.com
And CC:
■ Elliot Dale - Buyer
Office (970) 221.6777
Email edale(a'fccov.coni
May 6th, 2016
2PM @ 215 North Mason — Rm 2A
City of Fort Collins — Engineering Department
Capital Projects Group
INTRODUCTIONS
■ Engineering — Capital Projects
Dean Klingner— Capital Proj. Manager 221-6511
Tracy Dyer — Project Engineer 222-0855
Jeff Usher — Project Inspector 720.270.2653
■ Purchasing
Elliot Dale — Buyer 221-6777
Fort^ gUins
ATTENDANCE
■ Please be sure to register:
■ www.rockymountainbidsystem.com
■ Bid Opening
May 20th, 2016 @ 3:OOpm (Our Clock)
Location - 215 North Mason Street
Submit Bids to Purchasing Department
' ,F�rt Colliins
■ Bid Form
■ Certified / Cashier's Check Bid Bond
■ Acknowledgment of Bid Addenda
• Statement of Bidder's Qualifications
■ Schedule of Subcontractors
■ CDOT Form #606, #1413 and #1414
■ Buy America Certification
■ Certified Regarding Lobbying
CG:y Oi
-FMr of ;ns
■ This is a Federally funded project and subject to
Federal Terms and Conditions.
■ This project has a Disadvantaged Business Enterprise
Goal of 10%.
■ Ensure completion of the Statement of Bidders
Qualifications and completed or under construction
project references.
Fort Collins
IMPORTANT CONTRACT NOTES
■ Pre -Construction Meeting
Mandatory Meeting prior to Commencing Construction
Date and Time to be determined after Contract Award
Davis — Bacon Wage Rates apply
■ Construction Start Date
Mid June mobilization
G:yd
,..Fort Collins
w. m.r
■ Substantial Completion
Sixty Five (65) Calendar Days Substantial Completion
■ Final Acceptance
Ten (10) Calendar Days from Substantial Completion
w port- Cotl�ns
CONTRACT DOCUMENTS BID #8309
■ Plan Sheets
Prepared by: Interwest Consulting Group (ICG), BHA
and Hines Inc.
■ Specification Book
Prepared by: ICG, BHA and City of Fort Collins
■ Subgrade Investigation and Pavement Design Report
Will be made available via Rocky Mountain Purchasing
site with addendum.
PROJECT LIMITS
SUMMARY OF WORK
■ Removals — Clearing and Grubbing, Tree Removal, Soil
Excavation, Asphalt, Concrete
• Storm Utility Installation
■ Install Aggregate Base, Curb, Gutter, Splash Block
■ Roadway Milling, Sidewalk / Curb Ramps
■ HMA Paving and Minor Patching
■ Detailed Landscape Plans / System Restoration
■ Provide Traffic Control Throughout
Approved Traffic Control Plans thru Syl Mireles and
Engineering Department
^F� t�s
■ Construction Staking
Provided by the City of Fort Collins
48 Hours (Minimum) Required for Notification
■ Testing
Provided by the City of Fort Collins thru CTL Thompson
Contractor will coordinate w/ City inspector, testing
frequency according to CDOT form 250
■ Traffic Signals
Provided by the City of Fort Collins — Coordination item
HIGHLIGHTS OF GENERAL CONDITION
■ Lane Rental
— 65 calendar days of single lane closures for Drake and
Shields Street
— 25 single land closures for the Davidson / Raintree Drive
intersection and adjacent ramps.
— A lane rental is defined as any single lane closure and
each individual lane drop is considered one lane closure.
— Note conditions that will NOT be measured as lane rental
days on page 12
C.iYtlF
F`artC�otl'�,ns
HIGHLIGHTS OF GENERAL CONDITIONS
■ Superintendents
The General Contractor SHALL employ a full time
superintendent whose sole responsibility is to monitor and
coordinate all facets of the work.
■ Fugitive Dust -
project will be required to follow all applicable requirements
of COFC dust mitigation policy.
HIGHLIGHTS OF GENERAL. CONDITIONS
■ Substantial Completion - Defined
Substantial Completion is defined as completion and
acceptance of the following items as awarded by
alternative: removals, embankment, sidewalk, curb &
gutter, median improvements, curb ramps and inlet, asphalt
(top mat), topsoil import and slope grading.
• Liquidated Damages — Substantial Completion
If the Contractor goes past the 65 calendar days for
substantial completion, damages in the amount of Fourteen
Hundred Dollars ($1400.00) for each calendar day will be
assessed.
HIGHLIGHTS3 OF GENERAL CONDITIONS
■ Final Acceptance - Defined
• Final Acceptance is defined as landscape wall, final grading,
irrigation system restoration, planting, removal of tree
protection removal of erosion control devices (to the extent
approved), completed punch list items, erosion control items
removed, site clean-up and demobilization.
■ Liquidated Damages — Final Acceptance
If the Contractor goes past the 10 calendar days for final
completion, damages in the amount of Fourteen Hundred
Dollars ($1400.00) for each calendar day will be assessed.
xYw
4r
GENERALHIGHLIGHTS OF
■ Construction Hours
Standard Working Hours are from 7:00am to 3:30pm
Monday through Friday
Weekend Work and / or Extended Hours Work may be
granted. Requests for either must be made in Writing a
minimum of 72 hours in advance. Requests are subject
to approval by the City of Fort Collins.