Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 7658 MISCELLANEOUS CONCRETE ANNUAL (39)Estimate Date 6/13/2018 Estimate # C1524 Bill To: City of Fort Collins Engineering Department P.O. Box 580 Fort Collins, Co. 80522 Project Location Bus Stop Upgrades Priority 3 Locations P.O./ Work order # Priority 3 Terms Net 30 Representat... CH We look forward to working with you! Phone # 9704843880 Fax # 970-416-6230 E-mail smagdaleno@lightfieldenterprises.com Total We propose to furnish material and labor-complete in accordance with the above specifications. All work to be completed in a professional manner and in accordance with industry standards. Any alteration or deviation from above specifications must be done in writing. Estimate is good for 30 days. Acceptance of Proposal: The above prices, specifications and conditions are satisfactory and are hereby accepted. Lightfield Enterprises is authorized to do work as specified. I agree to pay as outlined in the "Terms" stated above. Date of acceptence________________________Signature_____________________________________________ 2600 Midpoint Drive Fort Collins CO 80525 Description QtyUnit Cost Total Priority 3 Locations-1119, 1562, 1310, 1413 - #2 stop type 4 EA 6,000.00 24,000.00 $24,000.00