Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 7658 MISCELLANEOUS CONCRETE ANNUAL (38)Estimate Date 6/13/2018 Estimate # C1523 Bill To: City of Fort Collins Engineering Department P.O. Box 580 Fort Collins, Co. 80522 Project Location Bus Stop Upgrades Priority 2 Locations P.O./ Work order # Priority 2 Terms Net 30 Representat... CH We look forward to working with you! Phone # 9704843880 Fax # 970-416-6230 E-mail smagdaleno@lightfieldenterprises.com Total We propose to furnish material and labor-complete in accordance with the above specifications. All work to be completed in a professional manner and in accordance with industry standards. Any alteration or deviation from above specifications must be done in writing. Estimate is good for 30 days. Acceptance of Proposal: The above prices, specifications and conditions are satisfactory and are hereby accepted. Lightfield Enterprises is authorized to do work as specified. I agree to pay as outlined in the "Terms" stated above. Date of acceptence________________________Signature_____________________________________________ 2600 Midpoint Drive Fort Collins CO 80525 Description QtyUnit Cost Total Priority 2 Locations - 326, 1407, 1414, 1649 - #2 stop type 5 EA 6,000.00 30,000.00 $30,000.00