HomeMy WebLinkAboutWORK ORDER - RFP - 8134 VINE LEMAY BNSF IMPROVEMENTS PROJECTWORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
AECOM
DATED: September 29, 2015
Work Order Number: 1
Purchase Order Number:
Project Title: 8134 Vine & Lemay BNSF Improvements
Commencement Date: Upon signing by Purchasing Director
Completion Date: December 31, 2015
Maximum Fee: (time and reimbursable direct costs): $100,000.00 (See Exhibit B – Compensation)
Project Description: See attached Exhibit A – Scope of Work.
Scope of Services: See attached Exhibit A – Scope of Work.
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Professional
Services Agreement between the parties. In
the event of a conflict between or ambiguity in
the terms of the Professional Services
Agreement and this work order (including the
attached forms) the Professional Services
Agreement shall control.
The attached forms consisting of ten (10)
pages are hereby accepted and incorporated
herein, by this reference, and Notice to
Proceed is hereby given.
PROFESSIONAL
By:_______________________________
Date:_____________________________
CITY OF FORT COLLINS
By:_________________________________
Project Manager
Date: ______________________________
By: _______________________________
Gerry Paul
Purchasing Director (over $60,000.00)
Date: ____________________________
DocuSign Envelope ID: F57E9CC9-3C96-4D20-B76C-539ABFFE2EAB
10/7/2015
10/14/2015
10/14/2015
1. GENERAL INFORMATION
A. INTRODUCTION
This Scope of Work (SOW) details Stage 1 which includes preliminary alternatives concept design and
analysis, public outreach and railroad coordination of the Vine/Lemay/BNSF Improvements Project
(Project) for the City of Fort Collins (City) in Colorado.
Stage 1 includes initial data collection, planning, preliminary engineering, right-of-way verification,
public outreach, and analysis to identify community support and concerns, right of way requirements,
and potential environmental impacts.
The tasks for Stage 1 of the Vine/Lemay/BNSF Improvement Project are:
x Project coordination and team meetings
x Coordination with CDOT and Utilities
x Preliminary design and analysis of the three alternatives of a realigned Lemay Avenue at the
BNSF and existing Vine Drive crossings
x Creation of exhibits and presentations for Railroad Meeting #2 and Public Meeting #1
x Coordination with BNSF which includes Railroad Meeting #2
x Public Engagement Plan and Public outreach with neighborhoods and stakeholders which
includes Public Meeting #1
This schedule for this scope of work is estimate to be September 10 to December 31, 2015. The initial
Public Meeting #1 is estimated for early to mid-November.
2. SCOPE OF WORK
The contracted work shall be performed by the AECOM Project Team including subconsultants (referred
to as AECOM).
A. PROJECT MANAGEMENT
Kick-off Work session
AECOM will coordinate a kick-off work session with the City Project Management Team (PMT). With the
input of the PMT, the consultant will prepare a Life-Cycle Strategy Plan for the project. The Strategy Plan
will specify the roles and responsibilities of the consultant and other study participants, identify specific
work tasks, sub tasks, and provide a timeline/schedule of work. Part of the strategy session will be
mapping out scenarios and overlap of technical design, funding, and milestone decision points in the
project development process.
EXHIBIT A - SCOPE OF WORK
DocuSign Envelope ID: F57E9CC9-3C96-4D20-B76C-539ABFFE2EAB
Progress Meetings
The City’s Project Manager and the AECOM Project Manager will be responsible for the day-to-day
management of the Scope of Work. Specifically, the Project Manager’s will meet every two weeks to
cover the following:
a. Activities completed since the last meeting
b. Review of outstanding/late activities
c. Activities to be completed by the next meeting
d. Solutions proposed for unresolved and/or anticipated issues
e. Task order financial status and invoicing
f. A total of seven (7) 1 –hour progress meetings are scoped
Progress meetings will generally be conducted as conference-calls, however occasionally it may be
coordinated that in-person meetings can be achieved. The consultant will provide monthly invoices to
the City Project Manager stating progress on the project tasks and highlighting any issues of concern.
Deliverables:
x (1) Kick-Off Worksession Plan
x (7) Progress Meeting Minutes
x Monthly invoices
B. RAILROAD/PUC/UTILITIES/CDOT COORDINATION
Railraod/PUC
AECOM will assist in coordinating with BNSF/PUC for obtaining initial feedback of the preliminary
alternatives. AECOM will discuss any near-term plans that would potentially impact the project. AECOM
will share preliminary alternatives with BNSF/PUC and will discuss any comments received. One in-
person meeting is assumed (Railroad Meeting #2) to initiate the alternatives discussion with BNSF and
the PUC. Railroad Coordination, LLC, a subcontractor to AECOM, will facilitate Railroad Meeting #2 with
BNSF/PUC staff to present the preliminary alternatives and discuss any other issues. AECOM and
Railroad Coordination LLC will continue after the initial meeting to follow-up with BNSF/PUC and to
define next steps in the process.
Utilities
AECOM will contact utility providers to discuss locations of existing utilities, potential conflicts, possible
rerouting options, and any near-future plans of provider’s that would potentially impact the project.
Given the timing of survey data collection, already available GIS based utility coordination and locations
of existing utilities will be used as the basis of the first public meeting and conceptual design exhibits.
DocuSign Envelope ID: F57E9CC9-3C96-4D20-B76C-539ABFFE2EAB
CDOT
AECOM will assist in coordinating with CDOT to discuss the potential for federal funding and the impact
on the federal NEPA process. One in-person meeting with the CDOT Regional Environmental Program
Manager will be conducted.
Deliverables:
x BNSF/PUC Meeting #2, minutes and follow-up actions
x Utility provider outreach and minutes
x CDOT meeting #1 and minutes
C. FRAMEWORK TO SUPPORT STAGE 1 ALTERNATIVES ANALYSIS
AECOM will gather relevant data with the assistance of the City to define the framework of alternative
analysis in the context of City plans and policies and the site specific characteristics. Initial purpose and
need, criteria, and key issues will be clearly outlined that will define the basis of the alternatives
analysis. Key areas of consideration will include:
x Neighborhood Circulation
x Bike/Ped Connectivity
x Environment
x Safety
x Capacity
x Design Standards
x Railroad and Utility Compatibility
Deliverables:
x Purpose and Need
x Alternatives Analysis Criteria and Key Issues Framework
D. CONCEPT DESIGN EXHIBITS AND PRESENTATION
Concept alternatives drawings on aerial and GIS data backgrounds will be used to quantify and visualize
the alternatives for comparison. The physical layout will include layering of available data, such as
drainage systems, future Suniga Drive alignment, utilities (including overhead power lines), railroad
alignment, and right-of-way boundaries.
In addition to the plan view representation of the alternatives, up to two (2) sketch-level 3D renderings
will be developed to support the communication of the alternatives and features. These visual
renderings will be used to help stakeholders and the public understand the concept of the alternatives
during Public Meeting #1.
DocuSign Envelope ID: F57E9CC9-3C96-4D20-B76C-539ABFFE2EAB
The AECOM team will develop exhibits and presentations needed to portray the alternative concepts
and analysis results for Public Meeting #1. These exhibits will include large-scale printing, presentation
boards, and other visual aids to help the public have a better understanding of the alternative concepts.
The presentation will include a brief Power Point slide briefing that will complement the presentation
boards.
Deliverables:
x Presentation boards – up to 10
x Roll-plots of each alternative
x PowerPoint presentation
E. PUBLIC ENGAGEMENT PLAN AND PUBLIC MEETING #1
Communications Infrastructure Group (CIG), a subcontractor to AECOM, will prepare a Public
Engagement Plan as part of the early project planning effort. This plan will outline the stakeholders,
public process and stages, and planned materials and venues for the public process.
Also as part of this Stage 1 scope of work, CIG and AECOM will conduct a public meeting #1 to provide
information on the alternative concepts with the main goal to gather public, neighborhood and
stakeholder feedback about the alternatives under consideration. Outreach efforts for advertising
Public Meeting #1 will include a postcard mailer, City of Fort Collins webpage announcement, and
newspaper press release. The postcard mailer will include both tenants and owners to ensure
comprehensive outreach to low income and/or minority populations. Language translation is not
assumed in this scope of work. Meeting materials will include sign-in sheets, comment forms, and
project summary handouts.
Deliverables:
x Public Engagement Plan
x Stakeholder list
x Media press release
x Postcard announcements
x Comment forms
x Project summary handout
END OF SCOPE OF WORK
DocuSign Envelope ID: F57E9CC9-3C96-4D20-B76C-539ABFFE2EAB
Line/Lemay/BNSF Improvements Project
Stage 1 Scope of Work, 9/16/2015 CIG
RR
Coordination
LLC Toole Ayres
A. Eckman J. Sabo H. Mathis L. Sousa M. Giardetti T. Tyrrell L. Candelaria M. Sayouth
Principal PM Engineer III Sr. Planner Jr. Planner Sr. Manager Engineer II Admin
$ 250 $ 190 $ 130 $ 190 $ 85 $ 210 $ 95 $ 60
Project Management
Kick-Off Work Session and Strategy Plan 8 8 8 16 8
Progress Meetings 14 14
Subtotal Hours 8 22 0 8 0 0 16 22
Task Labor Costs $ 2,000 $ 4,180 $ - $ 1,520 $ - $ - $ 1,520 $ 1,320 $ - $ - $ - $ -
Total Task Labor Costs $ 10,540
Railroad/PUC/Utilities/CDOT Coordination
Railroad/PUC 8 8 8 8 $ 3,000
Utilities 2 4 12
CDOT 1 2 4
Subtotal Hours 9 12 12 4 0 8 12 0
Task Labor Costs $ 2,250 $ 2,280 $ 1,560 $ 760 $ - $ 1,680 $ 1,140 $ - $ - $ 3,000 $ - $ -
Total Task Labor Costs $ 12,670
Framework to Support Stage 1 Alternatives Analysis
Purpose and Need, Criteria, and Key Issues 2 4 40 40 $ 7,080 $ 2,000
Subtotal Hours 2 4 0 40 0 0 40 0
Task Labor Costs $ 500 $ 760 $ - $ 7,600 $ - $ - $ 3,800 $ - $ - $ - $ 7,080 $ 2,000
Total Task Labor Costs $ 21,740
Concept Design Exhibits and Presentation
Presentation Boards 4 16 4 40
Sketch-level 3D renderings 4 4 60
Roll-plot alternative exhibits 4 40 4 24
Powerpoint Presentation 2 8 8 8
Subtotal Hours 2 20 56 20 60 0 64 8
Task Labor Costs $ 500 $ 3,800 $ 7,280 $ 3,800 $ 5,100 $ - $ 6,080 $ 480 $ - $ - $ - $ -
Total Task Labor Costs $ 27,040
Public Engagement Plan and Public Meeting #1
Public Engagement Plan and Public Meeting #1 8 24 24 8 $ 12,380
Subtotal Hours 8 24 0 24 0 0 8 0
Task Labor Costs $ 2,000 $ 4,560 $ - $ 4,560 $ - $ - $ 760 $ - $ 12,380 $ - $ - $ -
Total Task Labor Costs $ 24,260
Total AECOM Hours 29 82 68 96 60 8 140 30
Sub Total Labor Cost $ 7,250 $ 15,580 $ 8,840 $ 18,240 $ 5,100 $ 1,680 $ 13,300 $ 1,800 $ 12,380 $ 3,100 $ 7,080 $ 2,000
AECOM Labor Cost $ 71,790
Subconsultant Labor Cost $ 24,560
Total Labor Cost $ 96,350
Reimbursable Expenses (AECOM)
Mileage at $0.575 $ 380
Mailing/Courier $ 25
Printing $ 300
subtotal AECOM Expenses $ 705
Reimbursable Expenses (Subconsultants)
CIG $ 2,445
RR Coordination LLC $ 100
Toole Design $ 400
Ayres Assoc. $ -
subtotal Subconsultant Expenses $ 2,945
Grand Total $ 100,000
AECOM Labor Subconsultants Labor
DocuSign Envelope ID: F57E9CC9-3C96-4D20-B76C-539ABFFE2EAB EXHIBIT B - COMPENSATION
PI
Estimate
-‐
Vine
&
Lemay
-‐-‐
2015
Deliverables
9/1/15
-‐-‐
11/30/15
Personnel
costs Estimated
hours Hourly
rate Total
cost
Develop
PI
Plan 32 $ 125.00 $ 4,000.00
Prepare
list
of
stakeholders 8 $ 115.00 $ 920.00
Attend
project
management
meetings 10 $ 125.00 $ 1,250.00
Draft/distribute
public
meeting
media
release 6 $ 115.00 $ 690.00
Coordinate
Stage
1
public
meeting
(logistics/staffing,
promotion,
materials
development,
facilitation,
meeting
summary) 48 $ 115.00 $ 5,520.00
Subtotal
personnel
costs $ 12,380.00
Hard
costs Units Price/unit Total
cost
Mileage 600 0.575 $ 345.00
Print
graphics/boards
for
public
meeting 10 $ 75.00 $ 750.00
Venue
rental
for
Vine and Lemay Intersection- Drainage and Water
Quality
BACKGROUND: The existing Vine and Lemay intersection is close to “failing” and is pushing the limits
of the City’s Adequate Public Facilities (APF) Ordinance. There are 8 to 10 trains per day at this
crossing and 20-30 minutes for traffic queues to clear per train crossing. Improvement of the
intersection has become a safety issue for BNSF, emergency services and the travelling public. The
City has been working in partnership with BNSF, area businesses and local neighborhood groups to
determine the best plan to appropriately serve the project area and increase safety and vitality of the
affected neighborhoods.
This project consists of an alternative analysis of the Lemay and Vine intersection. Ayres Associates is
a sub consultant to AECOM for the drainage, floodplain and water quality aspects of the project.
Ayres Associates’ project manager will be Jaclyn Michaelsen 223-5556 (office); 310-1547 (cell)
Other Ayres Staff: Pat Schoenecker 223-5556 (office)
Task 1 – Drainage and Water Quality Coordination
Ayres Associates will review the three selected alternatives, to be provided to Ayres by AECOM. For
each of the alternatives Ayres will provide conceptual level recommendations on how to address the
drainage and water quality needs. The recommendations will be summarized in a Drainage and Water
Quality Recommendations memo.
Fee
Ayres Associates proposes to complete the work outlined in this proposal, for a fee not to exceed
$2000.00.
DocuSign Envelope ID: F57E9CC9-3C96-4D20-B76C-539ABFFE2EAB
AECOM
Vine/Lemay/BNSFImprovementsProject
DraftScopeofWork
August 26, 2015
As requested, Toole Design Group, LLC (TDG) is pleased to submit the attached Scope of Work and Fee
Proposal to AECOM for planning services for the above referenced project. The Scope of Work reflects
our understanding of the project. The following tasks describe TDG’s scope of work for this project:
Task 1 – Project Management
TDG will participate in a kickoff meeting with the project team to coordinate a project schedule, goals of
project, identify key stakeholders, and identify data needs. On-going coordination will include calls
between the TDG project manager and AECOM, as needed. TDG will prepare monthly invoices and
progress reports including task accomplishments, status of deliverables, and expected upcoming
activities.
Task 1 Deliverables/Meetings:
x Kickoff Meeting with project team
x Monthly progress reports
x One (1) conference call with team
Task 2 – Public Involvement
TDG will participate in a public meeting and stakeholder meeting, and provide input on the Public
Participation Plan.
Task 2 Deliverables/Meetings:
x Public Meeting (1)
x Stakeholder Meeting (1)
Task 3 –Design Review
TDG will perform a review of the previously-developed designs for the project, and will note issues,
opportunities, operational considerations, and potential concept revisions. The review will not include
the development of detailed drawings.
Task 3 Deliverables:
x Narrative summarizing multimodal design review
DocuSign Envelope ID: F57E9CC9-3C96-4D20-B76C-539ABFFE2EAB
Budget
The project will be completed for a fee of seven thousand four hundred eighty dollars and nineteen
cents ($7,480.19). The budget assumes a three-month project schedule.
Principal Project
Manager
Landscape
Architect Planner
171.76 145.62 83.24 71.37
Task 1 Project Management
Kick-off Meeting 1 5 1 1
Monthly Reporting 4
Task 2 Public Involvement
Review Public Involvement Plan 2
Attend Public Meeting (1) 6
Attend Stakeholder Meeting (1) 6
Task 3 Design Review
Review Design and
Opportunities 4 8 12 14
Total Hours 5 25 13 21
Total Labor
$
858.80
$
3,640.50
$
1,082.12
$
1,498.77
$
7,080.19
Expenses
$
400.00
Total
TDG Fee
$
7,480.19
DocuSign Envelope ID: F57E9CC9-3C96-4D20-B76C-539ABFFE2EAB
RRC
Project
Manager
RRC
Project
Assistant
Estimated
Mileage
Costs
Grabler Kevwitch
$185.00 $75.00
A. TEAM CONFERENCE CALLS $
Two Team Progress conference calls with AECOM 3 3 $ 555.00 $ 555.00
B. OCT 2015 MEETING PREP & NOV 2015 PUBLIC MEETING $
Prep and coordination for one Oct 2015 meeting 3 3 $ 555.00 $ 555.00
Attend Public Meeting #1 on November 4, 2015. 4 4 $ 740.00 $ 740.00
C REVIEW PLANING DOCUMENTS $
Review scenario planning documents 3 3 $ 555.00 $ 555.00
D. PRELIMINARY REVIEW ALTERNATIVES $
Preliminary review alternatives for RR concepts 3 3 $ 555.00 $ 555.00
E MISC TASKS $
Actual Expenses for travel expenses (Parking, Hotel), if required $ $
Actual Federal Mileage rate at $0.575 per mile, estimated at 160 miles, will charge
actual mileage only. $92.00 $ 92.00
Accounting and Billing 2 2 $ 150.00 $ 150.00
TOTAL HOURS 16 2 18 $ 3110.00 $ 3202.00
FT. COLLINS VINE/LEMAY PROJECT
TASK DESCRIPTION - AECOM
Total Task
Hours
Labor Total Total Cost
DocuSign Envelope ID: F57E9CC9-3C96-4D20-B76C-539ABFFE2EAB
public
meeting 1 $ 250.00 $ 250.00
Refreshments
for
public
meeting 1 $ 50.00 $ 50.00
Printing/distribution
costs
for
1,000
postcards 3,000 $ 0.35 $ 1,050.00
Subtotal
hard
costs $ 2,445.00
Total
PI
costs $ 14,825.00
DocuSign Envelope ID: F57E9CC9-3C96-4D20-B76C-539ABFFE2EAB