HomeMy WebLinkAboutBID - 8157 MCCLELLAND DRIVE RIGHT TURN LANE (2)Addendum 1 - Page 1 of 2 ADDENDUM NO. 2 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 8157/8159: McClellan Drive Right Turn Lane OPENING DATE: 3:00 PM (Our Clock) September 4, 2015 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Additional questions and answers Please contact Elliot Dale, Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum 1 - Page 2 of 2 EXHIBIT 1 – QUESTIONS AND ANSWERS 1. Question: Are there any OJT (On the Job Training) hours? If so, how many? Answer: There are 0 (zero) On-the-Job Training hours. 2. Question: Who pays for testing? Answer: The City of Fort Collins pays for testing. Asphalt, concrete, and soil compaction are typical test that could be required per on-site conditions. 3. Question: What are the working hours? Answer: See question #1 in Addendum #1 for response. 4. Question: What is the cost of the hydrant meter and water? Answer: For use and cost information of City of Fort Collins water from the water hydrant, call the Water Meter Shop at (970) 221-6759 to coordinate use and applicable costs. 5. Question: What are the costs of the permits? Answer: No permitting cost are expected on this project. There is a $35 processing fee for each Traffic Control Plan submitted to the City of Fort Collins. 6. Question: The excel bid schedule provided – the extension for the item 601-03000 Concrete Class D doesn’t appear to be calculating correctly. For example, the quantity is 14 CY, but when I plug in a unit price of $1000.00, the total is $14,145.00 instead of $14,000.00. Answer: In Excel Spreadsheet titled “Bid Schedule_McClelland Dr Right Turn Lane.xlsx” the quantity for item 601-03000 should read 14.000 CY, not 14.145 CY. 7. Question: When is the city expecting to award and issue the NTP for this project. Answer: The City of Fort Collins’ aim is to have NTP by October 1st, 2015, pending contract signatures and supporting documentation. 8. Question: Electrical items – by others. These include reset of a light pole and vault and reset traffic signal and vault. Who is performing this work? When is it expected to happen? If during the project, how long will the contractor need to perform this work? Answer: The City of Fort Collins will be responsible for the electrical work and will schedule resets for both the light pole and signal pole, and associated vaults, on a Sunday. The City of Fort Collins will coordinate exact dates with the Contractor after award. This work should have minimal impact to the Contractor schedule.