HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8553 WATER VULNERABILITY STUDY (4)Change Order Form (for Work Orders) Official Purchasing Form Last updated 10/2017 CHANGE ORDER NO. 01 PROJECT TITLE: Water Supply Vulnerability Study Work Order 01 SERVICE PROVIDER: Stantec Consulting Services, Inc. WORK ORDER NUMBER:01 PO NUMBER: 9175434 DESCRIPTION: 1. Reason for Change: Task 3 There was an additional cost for purchasing 2016 imagery with adequate coverage of the GMA extent which was not included in the other direct costs of the original budget. Task 5 Decision was made to perform similar modeling for tributaries in the C-BT system as for the Poudre Basin. This will produce a better, more consistent final product. 2. Description of Change: See attached Scope of Work 3. Change in Work Order Price: $16,469 4. Change in Work Order Time: None ORIGINAL WORK ORDER PRICE $ 250,000.00 TOTAL APPROVED CHANGE ORDER .00 TOTAL PENDING CHANGE ORDER .00 TOTAL THIS CHANGE ORDER 16,469.00 TOTAL % OF THIS CHANGE ORDER % TOTAL C.O.% OF ORIGINAL WORK ORDER % ADJUSTED WORK ORDER COST $ $266,469.00 SERVICE PROVIDER: Date: Chip Paulson, Technical Lead ACCEPTANCE: Date: Meagan Smith, Project Manager ACCEPTANCE: Date: Donnie Dustin, Water Resources Manager REVIEWED: Date: Pat Johnson, Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director DocuSign Envelope ID: 3CF36368-2D5F-415F-A287-C5CA927D8C86 3/8/2018 3/12/2018 3/14/2018 3/15/2018 Change Order Form (for Work Orders) Official Purchasing Form Last updated 10/2017 (if greater than $60,000) DocuSign Envelope ID: 3CF36368-2D5F-415F-A287-C5CA927D8C86 Memo fl c:\users\lfardal.corp\documents\1data drive\ftc util\change order.docx To: Meagan Smith From: Lisa Fardal City of Fort Collins – Utilities Fort Collins CO Office File: Change Order Date: February 2, 2018 Reference: Fort Collins Utilities Vulnerability Study Introduction Recommendations from the Literature Review and Hydrologic Approach Workshop included hydrologic simulation of flows under future conditions for the basins that serve as input to Northern Water’s CBT model. The simulation of flows in those basins would use the same approach and tools as the ones proposed for the Poudre River Basin, for consistency and to improve the accuracy on the water availability estimate for the CBT system under future conditions. Using hydrologic models to simulate flows for the CBT model was not included in base-proposed approach, so the scope of work and estimated additional effort to include the explicit hydrologic modeling in these basins in Fort Collins Utilities Vulnerability Study (FCUVS) is presented herein. Also, included in this document are the additional cost for purchasing the 2016 imagery for the area covering the general management area (GMA) extent that was not included in the other direct costs of the original budget. Changes from Original Scope of Work Task 3 - FUTURE WATER DEMAND CONSIDERATIONS RTI has acquired a 2016 satellite image for the entire GMA. This change order covers the difference between the cost of this image and original budget for the purchase. Task 5 – DEVELOP POTENTIAL YIELD CHANGES RTI will use the Joint Front Range Climate Change Vulnerability Study (JFRCCVS) calibrated models to simulate the rainfall-runoff processes in the basins used by the CBT model, which include the upper Colorado River, Fraser River, Willow Creek and Big Thompson River. RTI will use the same procedures and underlying assumptions selected to simulate future conditions in the Poudre River basin for the FCUVS, including variability from the tree-ring reconstructions and several trends of changes in precipitation and temperature, to generate a set of ensembles to represent variability and climate. The hydrology modeling approach selected uses transition probabilities from tree-ring paleo reconstructions in the South Platte basin as the base for the future weather generation, to capture potential future hydrologic conditions. RTI will use the existing models and tools developed for the base analysis, and will apply the same method proposed for the Poudre Basin to generate hydrology sets for the additional basins. RTI will run the rainfall-runoff models to estimate the resulting flows of the generated hydrology sets. RTI will process and organize the results to be used by the yield and CBT models. Budget Table 1 shows the additional required hours and the budget for the additional tasks. Additional project management time to process the change order and the subconsultant markup are included in the budget. The total of the requested change order is $16,469. DocuSign Envelope ID: 3CF36368-2D5F-415F-A287-C5CA927D8C86 February 2, 2018 Meagan Smith Page 2 of 2 Reference: Fort Collins Utilities Vulnerability Study fl c:\users\lfardal.corp\documents\1data drive\ftc util\change order.docx Table 1- Budget for the Additional Tasks Task Description Labor Hours Totals Stantec Senior Administrator RTI Senior Engineer 1 Environ. Engineer 1 Environ. Engineer 2 Stantec FRD RTI ODC Total Hours US DOLLARS $100 $155.39 $132.01 $107.25 $11/hr Task 1 Project Management 2 2 4 $ 222 Task 3 2016 Satellite Image (GMA) - Additional $1,591 $ 1,830 Task 5 Additional Hydrologic Analysis 21 54 20 95 $ 14,417 TOTALS 2 21 54 20 $22 $1,591 99 $ 16,469 Schedule The proposed tasks in this change order will be performed within the current schedule. Thank you for your consideration. Please reach out to me or Chip Paulson (303-291-2132) with any questions or concerns. Lisa Fardal 3325 S. Timberline Rd. Suite 150 Ft Collins, CO 80525 Phone: (970) 212-2773 DocuSign Envelope ID: 3CF36368-2D5F-415F-A287-C5CA927D8C86