Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7575 CONSULTING SERVICES FOR WATER TREATMENT FACILITY DESIGN & CONSTRUCTION SERVICESWORK ORDER NUMBER CH-2017-05 Change Order No. 1 WORK ORDER NUMBER CH-2017-05 CHANGE ORDER NO. 1 PROJECT TITLE: Water Quality (WQ) and Pollution Control (PC) Labs Master Plan Study (7575 Consulting Engineering Services Water Treatment Facility Design and Construction Services for Capital Improvements) CONSULTANT: CH2M HILL Engineers, Inc. PROJECT NUMBER: PO 9172224 DESCRIPTION: Professional engineering services for providing services for the Water Quality (WQ) and Pollution Control (PC) Labs Master Plan Study. 1. Reason for change: Contract completion date change. Meeting date limitations amongst various departments and management, and engineer led to extended time. 2. Description of Change: The current contract completion date of October 30, 2017, will be exceeded; thus a contract completion date revision. 3. Change in Contract Cost: No change in contract cost. 4. Change in Contract Time: Change contract completion date to March 31, 2018. ORIGINAL CONTRACT COST $199,990.00 TOTAL APPROVED CHANGE ORDERS 0.00 TOTAL PENDING CHANGE ORDERS 0.00 TOTAL THIS CHANGE ORDER 0.00 TOTAL % OF THIS CHANGE ORDER 0% TOTAL C.O.% OF ORIGINAL CONTRACT 0% ADJUSTED CONTRACT COST $199,990.00 (Assuming all change orders approved) ACCEPTED BY: DATE: Consultant’s Representative ACCEPTED BY: DATE: Special Projects Manager REVIEWED BY: DATE: Chief Engineer APPROVED BY: DATE: Water Production Manager APPROVED BY: DATE: WRT Ops Manager APPROVED BY: DATE: Purchasing Agent over $60,000 DocuSign Envelope ID: CFFD6279-BA75-46C5-93DD-F5B8F84CD4CE 1/18/2018 1/22/2018 1/22/2018 1/26/2018