Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8413 GEOTECHNICAL SERVICES ON-CALL (19)6/1/2018 400 North Link Lane | Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441 May 25, 2018 Downtown Development Authority C/O Ditesco Project & Construction Services 2133 S Timberline, Unit 110 Fort Collins, Colorado 80525 Attention: Ms. Jenna Beairsto Subject: Fee Estimate for Construction Observation and Materials Testing Services Downtown Alley Enhancements West Mountain and Old Firehouse Alleys Fort Collins, Colorado Proposal No. FC-18-0246 At your request, CTL|Thompson, Inc. is pleased to provide this fee estimate for Construction Observation and Materials Testing services for the Downtown Alley Enhancements - West Mountain and Old Firehouse Alleys project located in Fort Collins, Colorado. We used the plans provided in preparation of our proposal. We anticipate that our estimate will be used for the basis of establishing a budget for the project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms and conditions of our professional services agreement with the City of Fort Collins and are presented below. Earthwork: Compaction testing will be required for alley subgrade. We estimate that a total of 24 site visits and 3 proctors will be necessary for this project. Engineering Technician 24 days x 2 hrs/day x $70/hr $3,360.00 Standard Proctor 3 tests x $100/ea $300.00 Atterberg Limits 3 tests x $70/ea $210.00 Gradation 3 tests x $50/ea $150.00 Subtotal: $4,020.00 Concrete Testing: Concrete testing will be required for the curb, sidewalk, and alleyways. We estimate that a total of 38 concrete tests consisting of 5 cylinders each will be necessary for this project. Concrete Cylinders 38 tests x $180/test $6,840.00 Subtotal: $6,840.00 DOWNTOWN ALLEY ENHANCEMENTS CTL | T PROPOSAL NO. FC-18-0246 2 Asphalt Testing: Compaction testing may be required for the asphalt patching in the roadways. We estimate 3 site visits will be necessary. Engineering Technician 3 days x 3 hrs/day x $70/hr $630.00 Subtotal: $630.00 TOTAL ESTIMATED FEE: $11,490.00 It should be emphasized that this estimate is based upon assumptions of actual quantities and contractor’s schedule. The fee will be charged only for the actual hours and unit rates presented for tests and observations requested by the owner, contractor or subcontractors who schedule the services. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL | THOMPSON, INC. Heather Grubb Field Department Manager