HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9183247Change Order Form (for Work Orders) Official Purchasing Form Last updated 10/2017 CHANGE ORDER NO. 2 PROJECT TITLE: UAquifer Storage and Recovery (ASR) Assistance – Phase II Fatal Flaw SERVICE PROVIDER: CH2M HILL Engineers, Inc. WORK ORDER NUMBER: CH-2017-ASR-II PO NUMBER: 9177482 DESCRIPTION: 1. Reason for Change: Findings from CH2M study incur follow-up requirements that exceed original scope of work. Additional information in attached memo. 2. Description of Change: See attached memo. 3. Change in Work Order Price: $9,407.51 4. Change in Work Order Time: None ORIGINAL WORK ORDER PRICE $ 45,778.00 TOTAL APPROVED CHANGE ORDER 0.00 TOTAL PENDING CHANGE ORDER 0.00 TOTAL THIS CHANGE ORDER 9,407.51 TOTAL % OF THIS CHANGE ORDER 21% TOTAL C.O.% OF ORIGINAL WORK ORDER 21% ADJUSTED WORK ORDER COST $55,185.51 SERVICE PROVIDER: Date: Albert Paquet, Principal Project Manager ACCEPTANCE: Date: Adam Jokerst, Project Manager REVIEWED: Date: Pat Johnson, Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) DocuSign Envelope ID: 9EDE5324-BBC5-4C41-9E8D-1D3FE17C4E25 5/16/2018 5/29/2018 5/29/2018 PO_9177482 486493_WO_CH-2017_ASR_STUDY_2018.03 1 MEMORANDUM Project Status Report 2014 Water Treatment Facility Consulting Engineering Services PO Number 9177482 Work Order – Task 28 CH-2017-ASR II Aquifer Storage and Recovery (ASR) Assessment Report Review February 24, 2018 through March 30, 2018 PREPARED FOR: Adam Jokerst/FCU, Eileen Dornfest/FCU COPY TO: Kevin Heffernan/CH2M PREPARED BY: Al Paquet/CH2M DATE: April 26, 2018 PROJECT NUMBER: 486493.28 The following report summarizes CH2M’s activities during the above period. Task 1 ASR Phase II Assistance CH2M issued the revised final report titled Fort Collins Aquifer Storage and Recovery Assistance – Phase II Fatal Flaw Analysis on March 12, 2018. The revised report addressed Additional comments were received subsequent to the February 16, 2018 version. Task 2 Project Management CH2M addressed the City’s and CSU’s comments to the draft report and issued the final report on February 16. The CSU invoice is included with this invoice. A change order request in the amount of $ 9,407.51 is requested with this invoice. The additional charges are due to the following efforts that exceed the original scope level of effort. • Preparation of detailed responses to the City’s and CSU’s comments following the workshop and final report. • Questions regarding the Typical ASR well injection pressures required additional investigation and contact with Highland Ranch to confirm injection pressures. • Modification of figure 5-1 and 5-2. • Reformatting of the Report from Print version with page left blank to PDF versions, including table of Content updates. • Revisions to the recommendations and conclusions. • Refinement of induced seismicity concerns. • Estimates for ASR well testing program. These efforts were required to adequately address issues raised and complete the final report. We respectfully request that a Change Order be issued for this budget overrun. DocuSign Envelope ID: 9EDE5324-BBC5-4C41-9E8D-1D3FE17C4E25