Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 7546 DIRECTIONAL BORING & TRENCHING SERVICES (18)Invoice
Invoice # 14977
3813 Canal Dr. Ft.Collins, CO. 80524
970-494-1996 FAX 970-494-4449
Company City of Ft. Collins Traffic Date 3/26/2018
Address 626 Linden St. PO #
City, State Ft. Collins, CO. 80524 Rep
Phone 221-6816 Contact Britney
Qty Description Unit Price Total
0 Trenching $ 7.00 $ -
0 1-2" Directional Bore $ 8.00 $ -
0 1-3" Directional Bore $ 8.00 $ -
0 2-2" Directional Bore $ 9.00 $ -
0 2-3" Directional Bore $ 10.50 $ -
0 3-2" Directional Bore $ 11.50 $ -
0 1-4" Directional Bore $ 9.00 $ -
0 1-4" and 1-2" Directional Bore $ 10.50 $ -
0 1-4" and 2-2" Directional Bore $ 12.00 $ -
0 1-4" and 3-2" Directional Bore $ 14.50 $ -
217 2-2" and 2-3" Directional Bore $ 16.00 $ 3,472.00
0 1-5" Directional Bore $ 10.00 $ -
0 2-5" Directional Bore $ 15.00 $ -
0 3-5" Directional Bore $ 17.00 $ -
0 1-6" Directional Bore $ 11.00 $ -
0 2-6" Directional Bore $ 16.00 $ -
0 3-6" Directional Bore $ 18.00 $ -
0 Hole Hog Tunneling $ 8.00 $ -
8 Mud Control Vacuum Machine per hour $ 125.00 $ 1,000.00
0 Pothole in Paved Surfaces each $ 145.00 $ -
0 Pothole in Unpaved Surfaces each $ 75.00 $ -
4 Pothole Crew per day $ 950.00 $ 3,800.00
11 Pavement Pothole Restoration per sq. ft. $ 12.00 $ 132.00
0 Concrete Pothole Restoration per sq. ft. $ 14.50 $ -
26 Dirt Pothole Restoration per sq. ft. $ 12.00 $ 312.00
26 Replace Sod per sq. ft. $ 1.00 $ 26.00
11 Replace Paved Asphalt Surface per cubic ft. $ 10.00 $ 110.00
0 Replace Paved Concrete Surface per cu.ft. $ 24.00 $ -
0 Sawcut Asphalt less than 4" per ft. $ 2.10 $ -
0 Sawcut Concrete less than 4" per ft. $ 3.91 $ -
11 Core Drill Asphalt less than 4" each $ 45.00 $ 495.00
0 Core Drill Concrete less than 4" each $ 45.00 $ -
0 Install Vault 12"-18"-18" $ 45.00 $ -
0 Install Vault 14"-24"-18" $ 55.00 $ -
0 Install Vault 24"-36"-18" $ 65.00 $ -
0 Install Vault 36"-48"-30" $ 140.00 $ -
0 Install Vault 48"-96"-48" $ 25.00 $ -
180828
TRAFFIC
Page 2
Qty Description Unit Price Total
0 Locate Private Sewer Lateral $ 210.00 $ -
0 Locate Private Water Lateral $ 65.00 $ -
0 3 Man Labor Crew per hour $ 135.00 $ -
477 2" HDPE pipe $ 0.80 $ 381.60
477 3" HDPE pipe $ 1.45 $ 691.65
5 Traffic Management Day Standard $ 485.00 $ 2,425.00
0 Traffic Management Day 4 Hour Notice $ 685.00 $ -
0 Traffic Management Day Emergency $ 785.00 $ -
0 LS Additional 7pm - 7am . Weekend $ 210.00 $ -
6 Arrow Board Rental per day $ 65.00 $ 390.00
0 Flagger per hour $ 38.00 $ -
25 Cones each per day $ 4.00 $ 100.00
3 Sign Panel B per day $ 28.00 $ 84.00
2 Sign Panel A per day $ 28.00 $ 56.00
0 Sign Panel Special per day $ 31.00 $ -
0 Overnight Closure per day (no monitoring) $ 55.00 $ -
2 Mechanical/Bore Pits $ 300.00 $ 600.00
0 Mud control (Super Vacuum) per hr. $ 375.00 $ -
0 Hydro Excavation per hr. $ 450.00 $ -
0 Pipe Spacers (material only) $ 135.00 $ -
0 Steel Banding (material only) per ft. $ 1.22 $ -
0 Assemble spacer and banding per ft. $ 5.50 $ -
$ -
0 Perfromance and Payment Bonds $ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
Subtotal $ 14,075.25
Job Location Taxes
JFK and Horsetooth Total $ 14,075.25
Ft. Collins, CO.
Thank You