HomeMy WebLinkAboutCORRESPONDENCE - BID - 8519 MAPLE HILL NEIGHBORHOOD PARK (4)301 Centennial Drive CHANGE ORDER REQUEST Milliken, CO 80534 Owner Office: (970)587-7200 Contractor Fax: (970)352-6284 Architect Other PROJECT: Maple Hill Park CHANGE ORDER REQUEST #: 03 OWNER NAME: City of Fort Collins Parks & Development Attn: Matt Day 215 N. Mason 3rd Floor Fort Collins, CO 80522 DATE: 12/6/2017 THE CONTRACT IS CHANGED AS FOLLOWS: Item Description Quantity Units Unit Price Extension CI 01 1 LS $ 33,425.77 $ 33,425.77 CI 02 1 LS $ 2,110.25 $ 2,110.25 CI 03 1 LS $ 3,975.00 $ 3,975.00 CI 04 1 LS 5 Days Add 5 Schedule Days to Project Schedule TOTAL $ 39,511.02 Not Valid Until Signed by the Owner and Contractor The original Contract Sum was . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,393,499.11 Net Change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ($17,964.00) The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,375,535.11 The Contract Sum will be increased by this Change Order in the amount of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $39,511.02 The new Contract Sum including this Change Order will be. . . . . . . . . . . . . . . . . . . . . . . . . . $2,415,046.13 The Contract Time will be increased by 5 days The date of Substantial Completion 1/13/2018 All change orders will be reviewed in an accumulated manner for both time and cost impact as they relate to the ongoing impacts on the project. Accumulated time and cost impacts will then be forwarded under a separate change order. City of Fort Collins Parks & Development Alms2S Hall-Irwin Corporation 215 N. Mason 3rd Floor 712 Whalers Way 301 Centennial Drive Suite B-100 Fort Collins, CO 80522 Fort Collins, CO 80525 Milliken, CO 80543 By: ______________________________ By: __________________________ By: ________________________ Date: ____________________________ Date _________________________ Date: _______________________ Install 18" Boulder Edge Along Pond Add power through the time clock for three bench lights with in-ground boxes. Two boxes in the dirt/gravel, and 1 to be poured in concrete. Liquid tight flex whips to feed benches. Install a second circuit to the outlet on the shelter, with a split outlet. Also add a dedicated circuit to power a controller for the door lonks, this includes the wiring for the sensor touch push bar and locks. as of the date of this Change Order therefore is: Additional schedule days added to complete electrical and boulder work above