HomeMy WebLinkAboutRFP - 8730 ENGINEERING DESIGN AND SUPPORT SERVICES FOR THE POWER TRAIL GRADE SEPARATED CROSSING AT HARMONY ROAD (4)Addendum 3 Page 1 of 2
ADDENDUM NO. 3
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of BID 8730: Engineering Design and Support Services – Power Trail Grade
Separated Crossing at Harmony Road
OPENING DATE: 3:00 PM (Our Clock) May 8, 2018
To all prospective bidders under the specifications and contract documents described above,
the following changes/additions are hereby made and detailed in the following sections of this
addendum:
Exhibit 1 – Additional Questions & Answers
Please contact Elliot Dale, Senior Buyer at (970) 221-6777 with any questions regarding this
addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE PROPOSAL STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
Addendum 3 Page 2 of 2
EXHIBIT 1 – ADDITIONAL QUESTIONS & ANSWERS
1. If the City intends on performing potholing services through an existing on-call, should
the proposer exclude the cost of potholing from their fee estimate?
Utilities potholing costs do not need to be included in the Professional’s fee
estimate. All other subsurface exploration deemed necessary by the Professional
should be included (i.e. geotechnical investigation).
2. If potholing is to be included in the fee estimate, can the City provide available existing
utility information in order to determine the estimated number of potholes needed and/or
provide an “assumed” number of potholes required?
N/A.