Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8286 CONSTRUCTION CONTRACTOR FOR PROJECTS AT THE WATER & WASTEWATER TREATMENT FACILITIES (50)WTF Contract Change Order November 2017 00950-1 SECTION 00950 CHANGE ORDER NO. 1 PROJECT TITLE: WTF Reservoir Drainage System Construction Project CONTRACTOR: Hydro Construction Purchase Order and Business Unit Numbers: PO9175096 and BU 5026310067 DESCRIPTION: 1. Reason for change: additional site work items to complete the construction the Reservoir Drainage System project 2. Description of Change: additional site work identified during construction of the WTF reservoir drainage system, the existing inlet wall was found to be damaged – leaning precariously away from the existing soil backfill into the pond, requiring repair and replacement; also, a pipe in the existing inlet wall requires re- routing and removal from the inlet wall and re-routed downstream. 3. Change in Contract Cost: original contract cost $163,358, with this change order amount of $22,137.43, the total cost of the project will become $185,495.43. 4. Change in Contract Time: With this new work item, the master schedule for the substantial completion of the CCB construction will change the substantial completion date to March 31, 2018. ORIGINAL CONTRACT COST $163,358.00 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $22,137.43 TOTAL % OF THIS CHANGE ORDER 13.6% TOTAL C.O.% OF ORIGINAL CONTRACT 13.6% ADJUSTED CONTRACT COST $185,495.43.00 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Representative ACCEPTED BY: DATE: Special Projects Manager REVIEWED BY: DATE: Chief Engineer APPROVED BY: DATE: Water Production Manager APPROVED BY: DATE: Water Resources and Treatment Operations Manager APPROVED BY: DATE: Purchasing Agent APPROVED BY: DATE: Gerry Paul, Director of Purchasing (over $60,000) DocuSign Envelope ID: 58B9566E-96A0-46E6-A018-B35491BF5D7D 11/30/2017 11/30/2017 11/30/2017 11/30/2017 11/30/2017 12/4/2017