HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8115 ENGINEERING SERVICES FOR WATER RECLAMATION & BIOSOLIDS FACILITY DESIGN & CONSTRUCTION (18)Change Order Form (for Work Orders) Official Purchasing Form Last updated 10/2017 CHANGE ORDER NO. 1 PROJECT TITLE: DWRF Digester Circulation Pumps CONTRACTOR: Carollo Engineers, Inc. WORK ORDER NUMBER: C-WRF-2017-14 PO NUMBER: 9175097 DESCRIPTION: 1. Reason for Change: During design of the replacement Digester Circulation Pumps (DCPs) the project team realized investigation was needed into operations and maintenance of the sludge heat exchangers. 2. Description of Change: This change order covers the cost of the investigation into buildup on the heat exchangers, groundwater evaluation, and data analysis to support the DCP replacement project. 3. Change in Work Order Price: $26,319.00 4. Change in Work Order Time: June 30, 2018 ORIGINAL WORK ORDER PRICE $ 41,720.00 TOTAL APPROVED CHANGE ORDER 00.00 TOTAL PENDING CHANGE ORDER 00.00 TOTAL THIS CHANGE ORDER $ 26,319.00 TOTAL % OF THIS CHANGE ORDER 63.1% TOTAL C.O. % OF ORIGINAL WORK ORDER 63.1% ADJUSTED WORK ORDER COST $ 68,039.00 CONTRACTOR: Carollo Engineers, Inc. By: Date: Name: Title: ACCEPTANCE: Date: Eileen Dornfest, Special Project Manager REVIEWED: Date: Pat Johnson, Senior Buyer ACCEPTANCE: Date: Owen L. Randall, Water Systems Engineering Division Manager Page 1 of 5 DocuSign Envelope ID: 39F4A7B9-282F-4D7F-AAA9-25BD155002CB November 28, 2017 November 29, 2017 Jason Garside Vice President November 28, 2017 November 30, 2017 Change Order Form (for Work Orders) Official Purchasing Form Last updated 10/2017 ACCEPTANCE: Date: Jason Graham, Water Reclamation & Biosolids Division Manager ACCEPTANCE: Date: Carol Webb, Water Resources & Treatment Operations Manager ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) Page 2 of 5 DocuSign Envelope ID: 39F4A7B9-282F-4D7F-AAA9-25BD155002CB November 29, 2017 November 30, 2017 FINAL (11-23-17) pg. 1 Scope of Work - Digester Recirculation Pump Replacement Design Amendment No. 1 11-23-17 The City of Fort Collins (City) intends to implement the following replacement project at the Drake Water Reclamation Facility (DWRF): DWRF Digester Recirculation Pumps - replacement of digester recirculation pumps, and pump intake and discharge piping improvements to allow for off-gassing and for reduction of clogging. Currently, gas build-up and solids clogging decreases flow capacity of the pumps from approximately 250 gpm to 80 gpm. The existing pumps are centrifugal-type and will be replaced with chopper-type pumps. The purpose of this Amendment No. 1 is to provide technical analysis and engineering to support the operations and maintenance issues observed at the plant in association with the digester heating system and recirculation pumps. The analysis is required as a result of observations of scaling within the heat exchangers; and the recognition by plant staff that further investigation of sludge pumping and heat exchange is required to confirm the required size of the digester recirculation pumps and to improve heat exchange efficiency. Construction-related services are not included in the cost estimate attached. The scope of work is divided into the following major tasks, summarized below: Addendum No. 1, Task A - Data Analysis, Operations/Maintenance Protocol Development, and Recommendations Task A.1 - Data Analysis Review chemical analysis of heat exchanger piping scale and identify potential cause(s) of precipitate formation. Prepare for and participate in workshop with plant staff to review results of chemical analysis, identify potential causes, and determine path forward. Prepare meeting agenda and minutes. Review digester and heat exchanger plant data to assess causes of inefficiencies. Task A.2 - Operations/Maintenance Protocol Development Identify operations and maintenance protocols to improve heat exchange. Prepare draft and final of digester heat exchange operation/maintenance log. Prepare draft and of digester heat exchange protocol memorandum. Coordination conference call and emails regarding operations/maintenance protocol development. Task A.3 - Recommendations Based upon information and data collected by plant staff, interpret results and provide recommendation regarding the operation of the heat exchangers and digester sludge recirculation pumps. Confirm flow capacity of proposed digester sludge recirculation pumps. Prepare for and facilitate meeting with plant staff - prepare agenda and meeting minutes. Page 3 of 5 DocuSign Envelope ID: 39F4A7B9-282F-4D7F-AAA9-25BD155002CB FINAL - 11/23/17 DIGESTER RECIRC PUMP REPLACEMENT PROJECT LABOR HOURS AND ENGINEERING FEE Senior Professional (PIC) Lead Project Professional (PM) Project Professional (SME) Professional (PE) Disciplines (HVAC/Mech) Disciplines (EIC) Disciplines (Civil, HVAC, Mech) Senior Technician Technician Document Processing/Clerical Billing Rate $238 $219 $238 $206 $171 $171 $147 $162 $110 $96 Task A - AMENDMENT NO.1 0 10 40 0 64 0 0 0 0 4 118 $23,038 $0 $0 $0 $1,900 $1,381 $26,319 Task A.1 - Data Analysis 0 4 16 0 24 0 0 0 0 0 44 $8,788 $0 $0 $0 $1,700 $515 $11,003 Task A.2 - Operations/Maintenance Protocols 0 4 16 0 24 0 0 0 0 4 48 $9,172 $0 $0 $0 $0 $562 $9,734 Task A.3 - Recommendations 0 2 8 0 16 0 0 0 0 0 26 $5,078 $0 $0 $0 $200 $304 $5,582 PROJECT TOTALS - TASK A 0 10 40 0 64 0 0 0 0 4 118 $23,038 $0 $0 $0 $1,900 $1,381 $26,319 LABOR HOURS PROJECT COSTS Total Direct Labor Hours Total Labor Cost Ditesco Lithos King Surveying Other Direct Costs (ODCs) PECE Page 4 of 5 DocuSign Envelope ID: 39F4A7B9-282F-4D7F-AAA9-25BD155002CB Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Design Equipment Procurement Construction TENTATIVE SCHEDULE Digester Circulation Pumps SCHEDULE Page 5 of 5 DocuSign Envelope ID: 39F4A7B9-282F-4D7F-AAA9-25BD155002CB