Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9177774 (3)QUOTE
Quote # 7185
3813 Canal Dr. Ft.Collins, CO. 80524
970-494-1996 FAX 970-494-4449
Company City of Ft. Collins IT Date 10/26/2017
Address 700 Wood St. PO #
City, State Ft. Collins, CO. 80522 Rep
Phone Contact Hillary Koontz
Qty Description Unit Price Total
0 Trenching $ 7.00 $ -
340 1-2" Directional Bore $ 8.00 $ 2,720.00
0 1-3" Directional Bore $ 8.00 $ -
0 2-2" Directional Bore $ 9.00 $ -
0 2-3" Directional Bore $ 10.50 $ -
0 3-2" Directional Bore $ 11.50 $ -
0 1-4" Directional Bore $ 9.00 $ -
0 1-4" and 1-2" Directional Bore $ 10.50 $ -
0 1-4" and 2-2" Directional Bore $ 12.00 $ -
0 1-4" and 3-2" Directional Bore $ 14.50 $ -
0 2-2" and 2-3" Directional Bore $ 16.00 $ -
0 1-5" Directional Bore $ 10.00 $ -
0 2-5" Directional Bore $ 15.00 $ -
0 3-5" Directional Bore $ 17.00 $ -
0 1-6" Directional Bore $ 11.00 $ -
0 2-6" Directional Bore $ 16.00 $ -
0 3-6" Directional Bore $ 18.00 $ -
0 8-5" & 2-2" Directional Bore $ 96.00 $ -
0 Mud Control Vacuum Machine per hour $ 125.00 $ -
0 Pothole in Paved Surfaces each $ 145.00 $ -
0 Pothole in Unpaved Surfaces each $ 75.00 $ -
2 Pothole Crew per day $ 950.00 $ 1,900.00
2 Pavement Pothole Restoration per sq. ft. $ 12.00 $ 24.00
0 Concrete Pothole Restoration per sq. ft. $ 14.50 $ -
18 Dirt Pothole Restoration per sq. ft. $ 12.00 $ 216.00
18 Replace Sod per sq. ft. $ 1.00 $ 18.00
2 Replace Paved Asphalt Surface per cubic ft. $ 10.00 $ 20.00
0 Replace Paved Concrete Surface per cu.ft. $ 24.00 $ -
0 Sawcut Asphalt less than 4" per ft. $ 2.10 $ -
0 Sawcut Concrete less than 4" per ft. $ 3.91 $ -
2 Core Drill Asphalt less than 4" each $ 45.00 $ 90.00
0 Core Drill Concrete less than 4" each $ 45.00 $ -
0 Install Vault 12"-18"-18" $ 45.00 $ -
0 Install Vault 14"-24"-18" $ 55.00 $ -
1 Install Vault 24"-36"-18" $ 65.00 $ 65.00
0 Install Vault 36"-48"-30" $ 140.00 $ -
0 Install Vault 48"-96"-48" $ 25.00 $ -
Page 2
Qty Description Unit Price Total
0 Locate Private Sewer Lateral $ 210.00 $ -
0 Locate Private Water Lateral $ 65.00 $ -
3 3 Man Labor Crew per hour $ 135.00 $ 405.00
360 2" HDPE pipe $ 0.80 $ 288.00
0 3" HDPE pipe $ 1.45 $ -
3 Traffic Management Day Standard $ 485.00 $ 1,455.00
0 Traffic Management Day 4 Hour Notice $ 685.00 $ -
0 Traffic Management Day Emergency $ 785.00 $ -
0 LS Additional 7pm - 7am . Weekend $ 210.00 $ -
0 Arrow Board Rental per day $ 65.00 $ -
0 Flagger per hour $ 38.00 $ -
20 Cones each per day $ 4.00 $ 80.00
3 Sign Panel B per day $ 28.00 $ 84.00
2 Sign Panel A per day $ 28.00 $ 56.00
0 Sign Panel Special per day $ 31.00 $ -
0 Overnight Closure per day (no monitoring) $ 55.00 $ -
2 Mechanical/Bore Pits $ 300.00 $ 600.00
0 Mud control (Super Vacuum) per hr. $ 375.00 $ -
0 Hydro Excavation per hr. $ 450.00 $ -
0 Pipe Spacers (material only) $ 135.00 $ -
0 Steel Banding (material only) per ft. $ 1.22 $ -
0 Assemble spacer and banding per ft. $ 5.50 $ -
1 ROW permit $ 210.00 $ 210.00
0 Perfromance and Payment Bonds $ -
$ -
1 24"-36"-18" vault $ 664.00 $ 664.00
3 Sewer lateral locates $ 185.00 $ 555.00
1 Private locates $ 210.00 $ 210.00
$ -
1 Furnish and install J box $ 445.00 $ 445.00
1 Bldg. entry $ 845.00 $ 845.00
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
Subtotal $ 10,950.00
Job Location Taxes
1400 Riverside Total $ 10,950.00
Ft. Collins, CO.
Thank You