Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9177774 (3)QUOTE Quote # 7185 3813 Canal Dr. Ft.Collins, CO. 80524 970-494-1996 FAX 970-494-4449 Company City of Ft. Collins IT Date 10/26/2017 Address 700 Wood St. PO # City, State Ft. Collins, CO. 80522 Rep Phone Contact Hillary Koontz Qty Description Unit Price Total 0 Trenching $ 7.00 $ - 340 1-2" Directional Bore $ 8.00 $ 2,720.00 0 1-3" Directional Bore $ 8.00 $ - 0 2-2" Directional Bore $ 9.00 $ - 0 2-3" Directional Bore $ 10.50 $ - 0 3-2" Directional Bore $ 11.50 $ - 0 1-4" Directional Bore $ 9.00 $ - 0 1-4" and 1-2" Directional Bore $ 10.50 $ - 0 1-4" and 2-2" Directional Bore $ 12.00 $ - 0 1-4" and 3-2" Directional Bore $ 14.50 $ - 0 2-2" and 2-3" Directional Bore $ 16.00 $ - 0 1-5" Directional Bore $ 10.00 $ - 0 2-5" Directional Bore $ 15.00 $ - 0 3-5" Directional Bore $ 17.00 $ - 0 1-6" Directional Bore $ 11.00 $ - 0 2-6" Directional Bore $ 16.00 $ - 0 3-6" Directional Bore $ 18.00 $ - 0 8-5" & 2-2" Directional Bore $ 96.00 $ - 0 Mud Control Vacuum Machine per hour $ 125.00 $ - 0 Pothole in Paved Surfaces each $ 145.00 $ - 0 Pothole in Unpaved Surfaces each $ 75.00 $ - 2 Pothole Crew per day $ 950.00 $ 1,900.00 2 Pavement Pothole Restoration per sq. ft. $ 12.00 $ 24.00 0 Concrete Pothole Restoration per sq. ft. $ 14.50 $ - 18 Dirt Pothole Restoration per sq. ft. $ 12.00 $ 216.00 18 Replace Sod per sq. ft. $ 1.00 $ 18.00 2 Replace Paved Asphalt Surface per cubic ft. $ 10.00 $ 20.00 0 Replace Paved Concrete Surface per cu.ft. $ 24.00 $ - 0 Sawcut Asphalt less than 4" per ft. $ 2.10 $ - 0 Sawcut Concrete less than 4" per ft. $ 3.91 $ - 2 Core Drill Asphalt less than 4" each $ 45.00 $ 90.00 0 Core Drill Concrete less than 4" each $ 45.00 $ - 0 Install Vault 12"-18"-18" $ 45.00 $ - 0 Install Vault 14"-24"-18" $ 55.00 $ - 1 Install Vault 24"-36"-18" $ 65.00 $ 65.00 0 Install Vault 36"-48"-30" $ 140.00 $ - 0 Install Vault 48"-96"-48" $ 25.00 $ - Page 2 Qty Description Unit Price Total 0 Locate Private Sewer Lateral $ 210.00 $ - 0 Locate Private Water Lateral $ 65.00 $ - 3 3 Man Labor Crew per hour $ 135.00 $ 405.00 360 2" HDPE pipe $ 0.80 $ 288.00 0 3" HDPE pipe $ 1.45 $ - 3 Traffic Management Day Standard $ 485.00 $ 1,455.00 0 Traffic Management Day 4 Hour Notice $ 685.00 $ - 0 Traffic Management Day Emergency $ 785.00 $ - 0 LS Additional 7pm - 7am . Weekend $ 210.00 $ - 0 Arrow Board Rental per day $ 65.00 $ - 0 Flagger per hour $ 38.00 $ - 20 Cones each per day $ 4.00 $ 80.00 3 Sign Panel B per day $ 28.00 $ 84.00 2 Sign Panel A per day $ 28.00 $ 56.00 0 Sign Panel Special per day $ 31.00 $ - 0 Overnight Closure per day (no monitoring) $ 55.00 $ - 2 Mechanical/Bore Pits $ 300.00 $ 600.00 0 Mud control (Super Vacuum) per hr. $ 375.00 $ - 0 Hydro Excavation per hr. $ 450.00 $ - 0 Pipe Spacers (material only) $ 135.00 $ - 0 Steel Banding (material only) per ft. $ 1.22 $ - 0 Assemble spacer and banding per ft. $ 5.50 $ - 1 ROW permit $ 210.00 $ 210.00 0 Perfromance and Payment Bonds $ - $ - 1 24"-36"-18" vault $ 664.00 $ 664.00 3 Sewer lateral locates $ 185.00 $ 555.00 1 Private locates $ 210.00 $ 210.00 $ - 1 Furnish and install J box $ 445.00 $ 445.00 1 Bldg. entry $ 845.00 $ 845.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - Subtotal $ 10,950.00 Job Location Taxes 1400 Riverside Total $ 10,950.00 Ft. Collins, CO. Thank You