Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 7658 MISCELLANEOUS CONCRETE ANNUAL (7)Requisition Form Vendor: Today's Date: Requisition No.: Ship To: Date Entered: Date Required: Date Approved: Special Instructions: Date Denied: Item # Quantity Unit Description Total Charge Number Requested By: Authorized By: Authorized By: Name, title typed here under the line Name, title typed here under the line Name, title typed here under the line Unit Price I\ENG\FORMS\Blank Requisition.xls 700 Wood St Paving Entrance $18,343.20 464250.535010.5049.W 700 Wood St Paving East $43,162.24 464250.535010.5049.W Banner Concrete 498349 DocuSign Envelope ID: 0D4A49E6-F932-43DA-A63D-511F5AB1FBD5 10/19/2017 10/26/2017 Estimate Date 10/7/2017 Estimate # 496 Name / Address City of Fort Collins BANNER CONCRETE LLC bannerconcrete@gmail.com 1313 Duff Drive Unit 3 Fort Collins, CO 80524 Project Customer Signature Total Description Qty Cost Total 700 Wood St. Paving to East Concrete pavement 8" (joints sealed) per sq ft 5,088 6.20 31,545.60 Expansion and caulking per lf 442 5.92 2,616.64 Saturday Overtime/Concrete Charge 2 4,500.00 9,000.00 Removals, excavation, Traffic Control, stormwater protection, fine grading, and compaction to be done by City of Fort Collins. City of Fort Collins will provide concrete washout, as it is usually incorporated into excavations spoils, or ABC price. Concrete overages due to depth of subgrade to be paid by City of Fort Collins at rate of $150.00/yd. Concrete cracking due to soft subgrade, or shallow spots in grade will not be covered under Banner Concrete warranty. Paving to be done in 2 phases to accomidate Saturday work, and limit closures. _____________________________________ $43,162.24 DocuSign Envelope ID: 0D4A49E6-F932-43DA-A63D-511F5AB1FBD5 Estimate Date 10/7/2017 Estimate # 497 Name / Address City of Fort Collins BANNER CONCRETE LLC bannerconcrete@gmail.com 1313 Duff Drive Unit 3 Fort Collins, CO 80524 Project Customer Signature Total Description Qty Cost Total 700 Wood St. Paving by entrance Concrete pavement 8" (joints sealed) per sq ft 2,080 6.20 12,896.00 Expansion and caulking per lf 160 5.92 947.20 Saturday Overtime/Concrete Charge 1 4,500.00 4,500.00 Removals, excavation, Traffic Control, stormwater protection, fine grading, and compaction to be done by City of Fort Collins. City of Fort Collins will provide concrete washout, as it is usually incorporated into excavations spoils, or ABC price. Concrete overages due to depth of subgrade to be paid by City of Fort Collins at rate of $150.00/yd. Concrete cracking due to soft subgrade, or shallow spots in grade will not be covered under Banner Concrete warranty. Paving to be done in1 phase to accomidate Saturday work, and limit closures. _____________________________________ $18,343.20 DocuSign Envelope ID: 0D4A49E6-F932-43DA-A63D-511F5AB1FBD5 Estimate Date 11/2/2017 Estimate # 534 Name / Address BANNER CONCRETE LLC bannerconcrete@gmail.com 1313 Duff Drive Unit 3 Fort Collins, CO 80524 Project Customer Signature Total Description Qty Cost Total Administrative per hour 10 37.50 375.00 Superintendant per hour 10 30.00 300.00 Foreman per hour 10 22.52 225.20 Finisher per hour 100 19.71 1,971.00 Laborer per hour 40 16.89 675.60 Concrete Saturday charge 60 10.00 600.00 _____________________________________ $4,146.80