Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8371 ARCHITECTURAL & ENGINEERING SERVICES ON-CALL (20)10/31/17 FACILITIES REQUISITION FORM VENDOR AU Workshop DATE 10/17/17 REQ BY: Chad Mapp - Operation Services Work Order # PR-600077 Billable? Y/N Yes CHARGE# 290900064.521110 TOTAL COST: - BUYER: Elliot Dale OTY DESCRIPTION COST 1 $50,477.00 ADDITIONAL INFO COMPUTER INPUT INFORMATION: VENDOR# REQUISITION # DATE ENTERED: $50,477.00 Provide design services for the new construction of a cicycle shelter for the Downtown Transit Center per proposal dated 10/10/2017 Page 1 10 October 2017 Chad Mapp Project Manager, Operation Services City of Fort Collins 300 LaPorte Ave., Building B, Fort Collins, CO 80524 RE: Downtown Transit Center Bicycle Shelter Dear Chad, [au]workshop is pleased to provide you with this proposal for design services for the new construction of a bicycle shelter for the Downtown Transit Center in Fort Collins. PROJECT UNDERSTANDING, SCOPE OF WORK AND DELIVERABLES Per our discussion in the Kick-Off Meeting on April 5th, 2017, the scope of the project is to provide design and construction documents for a fully secured bicycle shelter on the lawn directly to the south of the existing Downtown Transit Center. As discussed with you, we will provide design services as outlined herein on an hourly basis with the intention of working as quickly and efficiently as possible. We will not exceed the dollar amounts noted in the “Fees and Expenses” paragraph below without prior approval from you. Task One: Determine Design Approach During this task we will develop a preliminary concept for a custom-fabricated shelter and have a local shop price the design to determine if the cost of the Custom Shelter would be comparable to a prefabricated shelter. The advantages of a custom shelter would be: a unique design for this prominent civic location, Fort Collins Transit signage incorporated into design, and competitive bidding from local fabrication shops. Our proposal for this would include working closely with the artist selected for the Art In Public Places portion of the project and we would also explore the possibility of working with the DDA for their input or assistance on the project, if needed. City of Fort Collins | Downtown Transit Center Bicycle Shelter Page 2 Pictured below are some preliminary precedents for similar enclosed pavilion- structures: Task Two: Schematic Design After direction-to-proceed from Task One, we will begin Schematic Design. During this task we will generate a site plan, elevation drawings, and make preliminary material and color selections for your review and approval. In this task we will also engage our engineering and landscape teams to begin their design work. At the end of Schematic Design, we will engage our cost-estimating consultant to provide a cost estimate for your review and approval. Task Three: Construction Documents Upon owner approval of the schematic design documents, additional work to complete the construction documents will be required. The construction documents will consist of drawings and on-sheet specifications describing, in detail, the quality levels of materials and systems and other requirements for the construction of the project. City of Fort Collins | Downtown Transit Center Bicycle Shelter Page 3 Task Four: Development Review Submission At the end of task two we will submit drawings to the Development Review Department for Minor Amendment approval. At the end of Task Three we will submit to the Building Services Department for permit of the project. Task Four: Construction Administration We will continue to work on an hourly basis during construction to revise the design, answer inquiries, approve submittals, make site visits, provide additional sketches, etc. We plan to have Owner/Architect/Contractor (OAC) meetings on a once every other week basis with construction duration of approximately 3 months. EXCLUSIONS a. LEED or other green building certification. b. Professional interior renderings c. Presentations to Landmark Preservation Commission. d. Data/Communications design e. Fire sprinkler design f. Building commissioning g. Modifications to overall building services SCHEDULE We will plan to submit for Minor Amendment two months after beginning design and for permit two months following submission for Minor Amendment (pending Minor Amendment approval). Date for beginning of design to be determined based on schedules of [au]workshop, consultants, and applicable City Departments. FEES and EXPENSES For tasks described above, we propose a time and reimbursable direct cost basis under this agreement using our standard Hourly Rate Chart (per the Professional Services Agreement). Fee Schedule Total fee for work described will be $50,477, please see attached fee schedule (Attachment A) for complete breakout of fees by consultant and by task. The design time to ensure this project compliments the prominent site location will be similar to a larger project (i.e. time for minor amendment submittal and submittal for permit are similar regardless of project size) and thus the projected City of Fort Collins | Downtown Transit Center Bicycle Shelter Page 4 construction cost-to-design is a slightly higher percentage in comparison to a larger project. Reimbursable Expenses Expenses for reproductions will be billed to you at cost. Other expenses such as physical models, professional renderings, etc. are not anticipated, but if incurred will be in addition to the fees stated above and will be invoiced at their actual cost. Reimbursable fees will be incurred only with prior approval by you. AGREEMENT By signing below, you agree to the provisions of this proposal. Authorizing services described in this Proposal shall be construed to mean agreement with its provisions. We trust these terms meet your expectations and we are excited to assist you. Should you have any inquiries, please do not hesitate to contact us at your convenience. Sincerely, [au]workshop, llc. Jason Kersley, AIA LEED AP Managing Principal A G R E E D: By: (signature) ________________________________ Date: ______________________ Printed name: ________________________________ Attachments: Attachment A, Fee Breakdown from [au]workshop, JVA Civil Engineering, JVA Structural Engineering, Cumming Cost Estimators, RJMcNutt Electrical Engineering, Logan Simpson Landscape, and Flatirons Surveying. Attachment A Bicycle Shelter 11-May-2017 Area $/SF Total cost by Use Bicycle Shelter 1,200 SF $167 /SF $200,400.00 Total GBA 1,200 SF Total Assumed Const. Cost $200,400 Total Fee $50,477 25% of Construction costs Total Fees (Arch only) $13,972 28% of total for Arch Consultant fees $36,505 72% of Total to other Consulatants Total Fee Concept/ SD CD CA 16% 28% Architectural $13,972 $3,303 $7,376 $3,293 24% Structural $12,040 $2,208 $7,664 $2,168 23% Civil $11,736 $1,400 $9,180 $1,156 6% Survey $3,150 $3,150 11% Landscape $5,494 $594 $3,862 $1,038 5% Electrical $2,675 $455 $1,640 $580 3% Estimating $1,410 $1,410 Totals $50,477 $8,235 auws total hours 30 30 person weeks - - 0.7 $29,722 - - 59% $12,520 25% ATTACHMENT A ARCHITECTURAL Hourly Rate $165 $137 $110 $84 $66 TASK 1: SCHEMATIC DESIGN Kickoff Meeting/ Minutes 1 0 0 2 3 0 5 $472.00 Prepare Concepts/Sketches 1 3 2 3 16 0 24 $2,443.00 Review meeting 2 0 0 1 1 0 4 $388.00 Administration for all of Task One 1 0 2 0 0 0 2 $274.00 Total for Schematic Design Phase 33 $3,303.00 TASK TWO: DETAILED DESIGN AND PERMIT DRAWINGS/CONSTRUCTION DOCUMENTS Plans 1 1 0 1 5 0 7 $695.00 Elevations and Details 1 1 0 2 20 0 23 $2,065.00 Finishes (research/specify) 1 0 0 1 2 0 3 $278.00 Meeting to Present/Finalize Finishes 1 0 0 1 1 0 2 $194.00 Coordinate with Art in Public Places Artist 1 0 0 3 0 0 3 $330.00 Initial meeting 1 0 0 1 0 0 1 $110.00 APP concept review meeting 1 0 0 1 0 0 1 $110.00 APP finalize direction meeting 1 0 0 1 0 0 1 $110.00 Final Design review meeting 1 0 0 2 2 0 4 $388.00 Minor Amendment Submission 1 0 0 2 8 0 10 $892.00 Prepare drawings & application for submittal 1 0 0 0.5 3 0 3.5 $307.00 P&Z review meeting 1 0 0 0 1 0 1 $84.00 Responses to P&Z comments 1 0 0 1 3 0 4 $362.00 Resubmit to P&Z for review 1 0 0 0.5 1 0 1.5 $139.00 Submit to City for Permit 1 0 0 1 5 0 6 $530.00 Coordinate Consultants (Total of Listed Tasks Below) 5 0 0 1 8 0 9 $782.00 General coordination 1 0 0 1 2 0 3 $278.00 Coordinate Civil 1 0 0 0 1 0 1 $84.00 Coordinate Landscape 1 0 0 0 1 0 1 $84.00 Coordinate Structural 1 0 0 0 2 0 2 $168.00 Coordinate Electrical 1 0 0 0 2 0 2 $168.00 Administration for all of Task Two 1 0 8 0 0 0 8 $1,096.00 Total for Construction Document Phase 80 $7,376.00 TASK THREE: BIDDING/CONSTRUCTION PHASE Site visits 1 1 0 4 8 0 13 $1,277.00 Submittal/ RFI/ Other Documentation Review/ Changes 1 0 0 0 24 0 24 $2,016.00 Total for Construction Phase 37 $3,293.00 Total 150 $13,972.00 Staff Position Occurance Total Hours Total Fee Managing Principal Project Manager/ Designer Project Architect Intern Architect Design Principal ATTACHMENT A STRUCTURAL Hourly Rate $148 $0 $128 $104 $0 $0 TASK 1: SCHEMATIC DESIGN Kickoff Meeting/ Minutes 1 2 0 2 0 0 0 4 $552.00 Prepare Concepts/Sketches 1 4 0 4 0 0 0 8 $1,104.00 Review meeting 1 2 0 2 0 0 0 4 $552.00 Total for Schematic Design Phase 16 $2,208.00 TASK TWO: DETAILED DESIGN AND PERMIT DRAWINGS/CONSTRUCTION DOCUMENTS Plans 1 4 0 8 16 0 0 28 $3,280.00 Elevations and Details 1 4 0 8 16 0 0 28 $3,280.00 Finalize Finishes (research/specify) 0 0 0 0 0 0 0 0 $0.00 Coordinate with Art in Public Places Artist 1 2 0 2 0 0 0 4 $552.00 Final Design review meeting 1 2 0 2 0 0 0 4 $552.00 Meet with City for Minor Amendment Approval 0 0 0 0 0 0 0 0 $0.00 Submit to City for Permit 0 0 0 0 0 0 0 0 $0.00 Coordinate Consultants (Total of Listed Tasks Below) 0 0 0 0 0 0 0 0 $0.00 General coordination 0 0 0 0 0 0 0 0 Coordinate Civil 0 0 0 0 0 0 0 0 Coordinate Landscape 0 0 0 0 0 0 0 0 Coordinate Structural 0 0 0 0 0 0 0 0 Coordinate Electrical 0 0 0 0 0 0 0 0 Total for Construction Document Phase 60 $7,664.00 TASK THREE: BIDDING/CONSTRUCTION PHASE Site visits 1 2 0 2 0 0 0 4 $552.00 Submittals 1 4 0 8 0 0 0 12 $1,616.00 Total for Construction Phase 16 $2,168.00 Total 92 $12,040.00 Staff Position Occurance Total Hours Total Fee Project Manager REVIT Modeler Senior Project manager ATTACHMENT A JVA CIVIL ENGINEERING Hourly Rate $164 $140 $120 $104 TASK 1: SCHEMATIC DESIGN Kickoff Meeting 1 0 1 1 0 2 $260.00 Review Existing Information 1 0 1 2 0 3 $380.00 SD Narrative 1 0 1 2 0 3 $380.00 Team Coordination Meeting 1 0 1 2 0 3 $380.00 Total for Schematic Design Phase 11 $1,400.00 TASK 2: DESIGN DEVELOPMENT/CONSTRUCTION DOCUMENTS Grading Plan 1 1 2 16 2 21 $2,572.00 Erosion Control Report and Plan 1 1 1 2 12 16 $1,792.00 Drainage Report and Plan 1 1 1 2 8 12 $1,376.00 Team Coordination Meetings 3 0 2 1 0 9 $1,200.00 City Review Meetings 2 0 2 2 0 8 $1,040.00 Specifications 1 1 1 4 4 10 $1,200.00 Total for Construction Document Phase 57 $9,180.00 TASK THREE: BIDDING/CONSTRUCTION PHASE Site visits 1 0 1 1 0 2 $260.00 Submittals 4 0 0 1 1 2 $896.00 Total for Construction Phase 4 $1,156.00 Total 72 $11,736.00 Staff Position Occurance Total Hours Total Fee Senior Project Manager Project Engineer Design Engineer Principal-in-charge Flatirons, Inc. Surveying, Engineering & Geomatics www.FlatironsInc.com 3825 Iris Avenue, Ste 395 655 Fourth Avenue 3660 Downing Street, Unit E Boulder, CO 80301 Longmont, CO 80501 Denver, CO 80205 Phone: (303) 443-7001 Phone: (303) 776-1733 Phone: (303) 936-6997 Fax: (303) 443-9830 Fax: (303) 776-4355 Fax: (303)443-9830 WORK ORDER AND AUTHORIZATION CLIENT: [au]workshop | architects+urbanists FSI JOB NO.: CONTACT: Stephanie Bedinghaus AIA ADDRESS: 405 Linden Street Fort Collins, CO 80524 DATE: May 3, 2017 PHONE: 970.363.4604 EMAIL: sbedinghaus@auworkshop.co RE: 250 N. Mason Street, Fort Collins, CO 80524 – Downtown Transit Center Project (Lot 1, Downtown Transit Center Subdivision) Qtr: NE Section: 11 Township: 7N Range: 69W County: Larimer Thank you for the opportunity to provide the following work order. We will prepare an Engineering Design Topographic Exhibit with 1' contours of a portion of the above site as indicated in sketch provided by email on 05/03/2017. We will establish a job site benchmark tied to NAVD88 vertical datum, and data collect topographic site features, trees, surface evidence of utilities, curbs, access and design features and the as-built finished floor elevation of the existing building. In addition to the visible location of the utilities, we will show the location of the utilities as they are noted on the maps from local municipalities and utility companies, and any utility flagging or paint markings existing at the time of fieldwork. Boundary determination is not a part of the above described scope of services, and it is understood that this is not a Land Survey Plat in accordance with CRS 38-51-102. Any items, tasks or revisions not outlined in the initial work order will be provided on a time basis at our standard rates. Please sign and return a copy of this work order and a current title commitment if available as authorization to proceed. ESTIMATED COST: $2,700.00 (field and office) $450.00 (utility locate service) (See attached breakdown table – sheet 2 of 2) This estimate is valid for 90 days from the date of this work order. Payment in full is due within 30 days of receipt of invoice. Interest may be assessed at the rate of 1.5% per month on past due invoices. Flatirons, Inc. retains all copyrights. I HEREBY APPROVE THIS AGREEMENT AND HAVE RECEIVED COPY OF THE SAME. By:__________________________________ Date:__________________________ WW Rev.1 Flatirons, Inc - Page 2 of 2 RE: 250 N. Mason Street, Fort Collins, CO 80524 – Downtown Transit Center Project (Lot 1, Downtown Transit Center Subdivision) Breakdown of hourly fees: ATTACHMENT A LANDSCAPE ARCHITECTURE Planting and Irrigation Design 4/17/2017 Hourly Rate $145 $92 $81 TASK 1: SCHEMATIC DESIGN Kickoff Meeting/ Minutes 1 0 1 0 1 $92.00 Prepare Concepts/Sketches 1 1 2 1 4 $410.00 Review meeting 1 0 1 0 1 $92.00 Total for Schematic Design Phase 6 $594.00 TASK TWO: DETAILED DESIGN AND PERMIT DRAWINGS/CONSTRUCTION DOCUMENTS Planting & tree mitigation Plans (with 1 round of minimal revisions) 1 1 2 8 11 $977.00 Irrigation site review meeting of existing system 1 1 0 2 3 $307.00 Irrigation and tree Demolition plan 1 0 1 4 5 $416.00 Irrigation (field review/modification plan) 1 1 0 8 9 $793.00 Coordinate with Art in Public Places Artist 1 0 6 0 6 $552.00 Final Design review meeting 1 0 2 0 2 $184.00 Meet with City for Minor Amendment Approval 1 0 1 0 1 $92.00 Submit to City for Permit 1 0 1 1 2 $173.00 Coordinate Consultants (Total of Listed Tasks Below) 1 0 4 0 4 $368.00 General coordination 0 0 0 0 0 Coordinate Civil 0 0 0 0 0 Coordinate Landscape 0 0 0 0 0 Coordinate Structural 0 0 0 0 0 Coordinate Electrical 0 0 0 0 0 Total for Construction Document Phase 31 $3,862.00 TASK THREE: BIDDING/CONSTRUCTION PHASE Site visits 1 0 3 3 6 $519.00 Submittals 1 0 3 3 6 $519.00 Total for Construction Phase 12 $1,038.00 Total 49 $5,494.00 Staff Position Occurance Total Hours Total Fee Senior PM Project Landscape Architect Project Designer ELECTRICAL ENGINEERING Hourly Rate $115 $95 $80 $60 $45 SD Narrative and Drawings 1 01102 4 $265.00 Review meeting 1 02000 2 $190.00 Total for Schematic Design Phase 6 $455.00 TASK TWO: PERMIT DRAWINGS/CONSTRUCTION DOCUMENTS Plans 1 01341 9 $620.00 Final Design review meeting 1 02000 2 $190.00 Submit to City for Permit 1 10121 5 $360.00 General Coordination 1 02220 6 $470.00 Total for Construction Document Phase 22 $1,640.00 TASK THREE: CONSTRUCTION PHASE Site visits 1 03001 4 $330.00 Submittals 1 00202 4 $250.00 Total for Construction Phase 8 $580.00 Total 36 $2,675.00 TASK ONE: SCHEMATIC DESIGN Occurance Staff Position Total Hours Total Fee Principal Engineer Designer CAD Drafter Clerical Owner: AU Workshop Project: City of Fort Collins Bike Shelter Prepared by: Luke Fenske Scope of Work: Cost Management Services Date/Time: 4/14/17 7:57 AM Phase/Item Subtotal Total Fee FEE PROPOSAL SUMMARY Prepare Statement of Probable Cost a Schematic Design $1,410 TOTAL FEE PROPOSAL - ESTIMATING / ESTIMATING SUPPORT $1,410 Prepared By: Cumming Page 1 Project: AU Workshop Portions: City of Fort Collins Bike Shelter Stage: Schematic Design Date: ITEM HEADING Sitework Building TOTAL QUANTITY TAKEOFF PRICING DATA ENTRY & REPORT MEETING TIME TRAVEL TIME TOTAL HOURLY RATE TOTAL COST HR HR HR HR HR HR HR HR $/HR $ Cost Estimate Preparation Tasks; Structure (Sr. Cost Manager) 2 1 1 2 $ 150.00 $ 300 Sitework (Sr. Cost Manager) 3 2 1 3 $ 150.00 $ 450 Mechanical / Plumbing Systems (Sr Estimator) - - $ 150.00 $ - Electrical Systems (Sr Estimator) 2 2 2 $ 150.00 $ 300 Cost Estimate Preparation Tasks - General all disciplines (site, Arch, Struct and MEP) Quality controls and finalization of the estimate (Managing Director) 1.00 1 $ 180.00 $ 180 Estimate management & supervision (Managing Director) 1.0 1 $ 180.00 $ 180 TOTAL ESTIMATE TOTAL FOR a 9 $ 1,410 b. Meeting with Client / Design Team / Contractor Meetings prior to estimating Meeting (Estimator 1) - $ 160.00 $ - Meeting (Sr Estimator) - $ 175.00 $ - Meeting (Estimating Manager) - $ 195.00 $ - Meetings on completion of estimating Meeting (Estimator 1) - $ 160.00 $ - Meeting (Sr Estimator) - $ 175.00 $ - Meeting (Estimating Manager) - $ 195.00 $ - TOTAL FOR b - $ - c. Reconciliation (Add Services) Reconciliation (Estimator 1) - $ 160.00 $ - Reconciliation (Sr Estimator) - $ 175.00 $ - Reconciliation (Estimating Manager) - $ 195.00 $ - TOTAL FOR c - $ - TOTAL FEE PROPOSAL - Schematic Design SOPC 9 $ 1,410 April 14, 2017 CUMMING FEE PROPOSAL BACKUP ESTIMATED HOURS COST Prepared by: Cumming Page 2