FACILITIES REQUISITION FORM
VENDOR AU Workshop DATE 10/17/17
REQ BY: Chad Mapp - Operation Services Work Order # PR-600077 Billable? Y/N Yes
CHARGE# 290900064.521110 TOTAL COST: - BUYER: Elliot Dale
OTY DESCRIPTION COST
1 $50,477.00
ADDITIONAL INFO
COMPUTER INPUT INFORMATION:
VENDOR# REQUISITION # DATE ENTERED:
$50,477.00
Provide design services for the new construction of a cicycle shelter for the Downtown Transit Center per
proposal dated 10/10/2017
Page 1
10 October 2017
Chad Mapp
Project Manager, Operation Services
City of Fort Collins
300 LaPorte Ave., Building B,
Fort Collins, CO 80524
RE: Downtown Transit Center Bicycle Shelter
Dear Chad,
[au]workshop is pleased to provide you with this proposal for design services for the new
construction of a bicycle shelter for the Downtown Transit Center in Fort Collins.
PROJECT UNDERSTANDING, SCOPE OF WORK AND DELIVERABLES
Per our discussion in the Kick-Off Meeting on April 5th, 2017, the scope of the project is to
provide design and construction documents for a fully secured bicycle shelter on the lawn
directly to the south of the existing Downtown Transit Center.
As discussed with you, we will provide design services as outlined herein on an hourly basis
with the intention of working as quickly and efficiently as possible. We will not exceed the
dollar amounts noted in the “Fees and Expenses” paragraph below without prior approval from
you.
Task One: Determine Design Approach
During this task we will develop a preliminary concept for a custom-fabricated shelter
and have a local shop price the design to determine if the cost of the Custom Shelter
would be comparable to a prefabricated shelter. The advantages of a custom shelter
would be: a unique design for this prominent civic location, Fort Collins Transit signage
incorporated into design, and competitive bidding from local fabrication shops. Our
proposal for this would include working closely with the artist selected for the Art In
Public Places portion of the project and we would also explore the possibility of working
with the DDA for their input or assistance on the project, if needed.
City of Fort Collins | Downtown Transit Center Bicycle Shelter Page 2
Pictured below are some preliminary precedents for similar enclosed pavilion-
structures:
Task Two: Schematic Design
After direction-to-proceed from Task One, we will begin Schematic Design. During this
task we will generate a site plan, elevation drawings, and make preliminary material and
color selections for your review and approval. In this task we will also engage our
engineering and landscape teams to begin their design work. At the end of Schematic
Design, we will engage our cost-estimating consultant to provide a cost estimate for
your review and approval.
Task Three: Construction Documents
Upon owner approval of the schematic design documents, additional work to complete
the construction documents will be required. The construction documents will consist of
drawings and on-sheet specifications describing, in detail, the quality levels of materials
and systems and other requirements for the construction of the project.
City of Fort Collins | Downtown Transit Center Bicycle Shelter Page 3
Task Four: Development Review Submission
At the end of task two we will submit drawings to the Development Review Department
for Minor Amendment approval. At the end of Task Three we will submit to the Building
Services Department for permit of the project.
Task Four: Construction Administration
We will continue to work on an hourly basis during construction to revise the design,
answer inquiries, approve submittals, make site visits, provide additional sketches, etc.
We plan to have Owner/Architect/Contractor (OAC) meetings on a once every other
week basis with construction duration of approximately 3 months.
EXCLUSIONS
a. LEED or other green building certification.
b. Professional interior renderings
c. Presentations to Landmark Preservation Commission.
d. Data/Communications design
e. Fire sprinkler design
f. Building commissioning
g. Modifications to overall building services
SCHEDULE
We will plan to submit for Minor Amendment two months after beginning design and for
permit two months following submission for Minor Amendment (pending Minor
Amendment approval). Date for beginning of design to be determined based on
schedules of [au]workshop, consultants, and applicable City Departments.
FEES and EXPENSES
For tasks described above, we propose a time and reimbursable direct cost basis under
this agreement using our standard Hourly Rate Chart (per the Professional Services
Agreement).
Fee Schedule
Total fee for work described will be $50,477, please see attached fee schedule
(Attachment A) for complete breakout of fees by consultant and by task.
The design time to ensure this project compliments the prominent site location
will be similar to a larger project (i.e. time for minor amendment submittal and
submittal for permit are similar regardless of project size) and thus the projected
City of Fort Collins | Downtown Transit Center Bicycle Shelter Page 4
construction cost-to-design is a slightly higher percentage in comparison to a
larger project.
Reimbursable Expenses
Expenses for reproductions will be billed to you at cost. Other expenses such as
physical models, professional renderings, etc. are not anticipated, but if incurred will
be in addition to the fees stated above and will be invoiced at their actual cost.
Reimbursable fees will be incurred only with prior approval by you.
AGREEMENT
By signing below, you agree to the provisions of this proposal. Authorizing services
described in this Proposal shall be construed to mean agreement with its provisions. We
trust these terms meet your expectations and we are excited to assist you. Should you have
any inquiries, please do not hesitate to contact us at your convenience.
Sincerely,
[au]workshop, llc.
Jason Kersley, AIA LEED AP
Managing Principal
A G R E E D:
By: (signature) ________________________________ Date: ______________________
Printed name: ________________________________
Attachments:
Attachment A, Fee Breakdown from [au]workshop, JVA Civil Engineering, JVA Structural
Engineering, Cumming Cost Estimators, RJMcNutt Electrical Engineering, Logan Simpson
Landscape, and Flatirons Surveying.
Attachment A
Bicycle Shelter
11-May-2017
Area $/SF Total cost by Use
Bicycle Shelter 1,200 SF $167 /SF $200,400.00
Total GBA 1,200 SF
Total Assumed Const.
Cost $200,400
Total Fee $50,477 25% of Construction costs
Total Fees (Arch only) $13,972 28% of total for Arch
Consultant fees $36,505 72% of Total to other Consulatants
Total Fee Concept/ SD CD CA
16%
28% Architectural $13,972 $3,303 $7,376 $3,293
24% Structural $12,040 $2,208 $7,664 $2,168
23% Civil $11,736 $1,400 $9,180 $1,156
6% Survey $3,150 $3,150
11% Landscape $5,494 $594 $3,862 $1,038
5% Electrical $2,675 $455 $1,640 $580
3% Estimating $1,410 $1,410
Totals $50,477 $8,235
auws total hours 30 30
person weeks - - 0.7
$29,722
- -
59%
$12,520
25%
ATTACHMENT A
ARCHITECTURAL
Hourly Rate $165 $137 $110 $84 $66
TASK 1: SCHEMATIC DESIGN
Kickoff Meeting/ Minutes 1 0 0 2 3 0 5 $472.00
Prepare Concepts/Sketches 1 3 2 3 16 0 24 $2,443.00
Review meeting 2 0 0 1 1 0 4 $388.00
Administration for all of Task One 1 0 2 0 0 0 2 $274.00
Total for Schematic Design Phase 33 $3,303.00
TASK TWO: DETAILED DESIGN AND PERMIT DRAWINGS/CONSTRUCTION DOCUMENTS
Plans 1 1 0 1 5 0 7 $695.00
Elevations and Details 1 1 0 2 20 0 23 $2,065.00
Finishes (research/specify) 1 0 0 1 2 0 3 $278.00
Meeting to Present/Finalize Finishes 1 0 0 1 1 0 2 $194.00
Coordinate with Art in Public Places Artist 1 0 0 3 0 0 3 $330.00
Initial meeting 1 0 0 1 0 0 1 $110.00
APP concept review meeting 1 0 0 1 0 0 1 $110.00
APP finalize direction meeting 1 0 0 1 0 0 1 $110.00
Final Design review meeting 1 0 0 2 2 0 4 $388.00
Minor Amendment Submission 1 0 0 2 8 0 10 $892.00
Prepare drawings & application for submittal 1 0 0 0.5 3 0 3.5 $307.00
P&Z review meeting 1 0 0 0 1 0 1 $84.00
Responses to P&Z comments 1 0 0 1 3 0 4 $362.00
Resubmit to P&Z for review 1 0 0 0.5 1 0 1.5 $139.00
Submit to City for Permit 1 0 0 1 5 0 6 $530.00
Coordinate Consultants (Total of Listed Tasks Below) 5 0 0 1 8 0 9 $782.00
General coordination 1 0 0 1 2 0 3 $278.00
Coordinate Civil 1 0 0 0 1 0 1 $84.00
Coordinate Landscape 1 0 0 0 1 0 1 $84.00
Coordinate Structural 1 0 0 0 2 0 2 $168.00
Coordinate Electrical 1 0 0 0 2 0 2 $168.00
Administration for all of Task Two 1 0 8 0 0 0 8 $1,096.00
Total for Construction Document Phase 80 $7,376.00
TASK THREE: BIDDING/CONSTRUCTION PHASE
Site visits 1 1 0 4 8 0 13 $1,277.00
Submittal/ RFI/ Other Documentation Review/ Changes 1 0 0 0 24 0 24 $2,016.00
Total for Construction Phase 37 $3,293.00
Total 150 $13,972.00
Staff Position
Occurance
Total Hours
Total Fee
Managing Principal
Project Manager/
Designer
Project Architect
Intern Architect
Design Principal
ATTACHMENT A
STRUCTURAL
Hourly Rate $148 $0 $128 $104 $0 $0
TASK 1: SCHEMATIC DESIGN
Kickoff Meeting/ Minutes 1 2 0 2 0 0 0 4 $552.00
Prepare Concepts/Sketches 1 4 0 4 0 0 0 8 $1,104.00
Review meeting 1 2 0 2 0 0 0 4 $552.00
Total for Schematic Design Phase 16 $2,208.00
TASK TWO: DETAILED DESIGN AND PERMIT DRAWINGS/CONSTRUCTION DOCUMENTS
Plans 1 4 0 8 16 0 0 28 $3,280.00
Elevations and Details 1 4 0 8 16 0 0 28 $3,280.00
Finalize Finishes (research/specify) 0 0 0 0 0 0 0 0 $0.00
Coordinate with Art in Public Places Artist 1 2 0 2 0 0 0 4 $552.00
Final Design review meeting 1 2 0 2 0 0 0 4 $552.00
Meet with City for Minor Amendment Approval 0 0 0 0 0 0 0 0 $0.00
Submit to City for Permit 0 0 0 0 0 0 0 0 $0.00
Coordinate Consultants (Total of Listed Tasks Below) 0 0 0 0 0 0 0 0 $0.00
General coordination 0 0 0 0 0 0 0 0
Coordinate Civil 0 0 0 0 0 0 0 0
Coordinate Landscape 0 0 0 0 0 0 0 0
Coordinate Structural 0 0 0 0 0 0 0 0
Coordinate Electrical 0 0 0 0 0 0 0 0
Total for Construction Document Phase 60 $7,664.00
TASK THREE: BIDDING/CONSTRUCTION PHASE
Site visits 1 2 0 2 0 0 0 4 $552.00
Submittals 1 4 0 8 0 0 0 12 $1,616.00
Total for Construction Phase 16 $2,168.00
Total 92 $12,040.00
Staff Position
Occurance
Total Hours
Total Fee
Project Manager
REVIT Modeler
Senior Project
manager
ATTACHMENT A
JVA CIVIL ENGINEERING
Hourly Rate $164 $140 $120 $104
TASK 1: SCHEMATIC DESIGN
Kickoff Meeting 1 0 1 1 0 2 $260.00
Review Existing Information 1 0 1 2 0 3 $380.00
SD Narrative 1 0 1 2 0 3 $380.00
Team Coordination Meeting 1 0 1 2 0 3 $380.00
Total for Schematic Design Phase 11 $1,400.00
TASK 2: DESIGN DEVELOPMENT/CONSTRUCTION DOCUMENTS
Grading Plan 1 1 2 16 2 21 $2,572.00
Erosion Control Report and Plan 1 1 1 2 12 16 $1,792.00
Drainage Report and Plan 1 1 1 2 8 12 $1,376.00
Team Coordination Meetings 3 0 2 1 0 9 $1,200.00
City Review Meetings 2 0 2 2 0 8 $1,040.00
Specifications 1 1 1 4 4 10 $1,200.00
Total for Construction Document Phase 57 $9,180.00
TASK THREE: BIDDING/CONSTRUCTION PHASE
Site visits 1 0 1 1 0 2 $260.00
Submittals 4 0 0 1 1 2 $896.00
Total for Construction Phase 4 $1,156.00
Total 72 $11,736.00
Staff Position
Occurance
Total Hours
Total Fee
Senior Project Manager
Project Engineer
Design Engineer
Principal-in-charge
Flatirons, Inc.
Surveying, Engineering & Geomatics
www.FlatironsInc.com
3825 Iris Avenue, Ste 395 655 Fourth Avenue 3660 Downing Street, Unit E
Boulder, CO 80301 Longmont, CO 80501 Denver, CO 80205
Phone: (303) 443-7001 Phone: (303) 776-1733 Phone: (303) 936-6997
Fax: (303) 443-9830 Fax: (303) 776-4355 Fax: (303)443-9830
WORK ORDER AND AUTHORIZATION
CLIENT: [au]workshop | architects+urbanists FSI JOB NO.:
CONTACT: Stephanie Bedinghaus AIA
ADDRESS:
405 Linden Street
Fort Collins, CO 80524
DATE: May 3, 2017
PHONE: 970.363.4604 EMAIL: sbedinghaus@auworkshop.co
RE: 250 N. Mason Street, Fort Collins, CO 80524 – Downtown Transit Center Project
(Lot 1, Downtown Transit Center Subdivision)
Qtr: NE Section: 11 Township: 7N Range: 69W County: Larimer
Thank you for the opportunity to provide the following work order. We will prepare an Engineering Design
Topographic Exhibit with 1' contours of a portion of the above site as indicated in sketch provided by email on
05/03/2017. We will establish a job site benchmark tied to NAVD88 vertical datum, and data collect topographic
site features, trees, surface evidence of utilities, curbs, access and design features and the as-built finished floor
elevation of the existing building. In addition to the visible location of the utilities, we will show the location of
the utilities as they are noted on the maps from local municipalities and utility companies, and any utility flagging
or paint markings existing at the time of fieldwork. Boundary determination is not a part of the above described
scope of services, and it is understood that this is not a Land Survey Plat in accordance with CRS 38-51-102.
Any items, tasks or revisions not outlined in the initial work order will be provided on a time basis at our standard
rates. Please sign and return a copy of this work order and a current title commitment if available as authorization
to proceed.
ESTIMATED COST: $2,700.00 (field and office)
$450.00 (utility locate service)
(See attached breakdown table – sheet 2 of 2)
This estimate is valid for 90 days from the date of this work order. Payment in full is due within 30 days of receipt of
invoice. Interest may be assessed at the rate of 1.5% per month on past due invoices. Flatirons, Inc. retains all copyrights.
I HEREBY APPROVE THIS AGREEMENT AND HAVE RECEIVED COPY OF THE SAME.
By:__________________________________ Date:__________________________
WW Rev.1
Flatirons, Inc - Page 2 of 2
RE: 250 N. Mason Street, Fort Collins, CO 80524 – Downtown Transit Center Project
(Lot 1, Downtown Transit Center Subdivision)
Breakdown of hourly fees:
ATTACHMENT A
LANDSCAPE ARCHITECTURE
Planting and Irrigation Design
4/17/2017
Hourly Rate $145 $92 $81
TASK 1: SCHEMATIC DESIGN
Kickoff Meeting/ Minutes 1 0 1 0 1 $92.00
Prepare Concepts/Sketches 1 1 2 1 4 $410.00
Review meeting 1 0 1 0 1 $92.00
Total for Schematic Design Phase 6 $594.00
TASK TWO: DETAILED DESIGN AND PERMIT DRAWINGS/CONSTRUCTION DOCUMENTS
Planting & tree mitigation Plans (with 1 round of
minimal revisions)
1 1 2 8 11 $977.00
Irrigation site review meeting of existing system 1 1 0 2 3 $307.00
Irrigation and tree Demolition plan 1 0 1 4 5 $416.00
Irrigation (field review/modification plan) 1 1 0 8 9 $793.00
Coordinate with Art in Public Places Artist 1 0 6 0 6 $552.00
Final Design review meeting 1 0 2 0 2 $184.00
Meet with City for Minor Amendment Approval 1 0 1 0 1 $92.00
Submit to City for Permit 1 0 1 1 2 $173.00
Coordinate Consultants (Total of Listed Tasks Below) 1 0 4 0 4 $368.00
General coordination 0 0 0 0 0
Coordinate Civil 0 0 0 0 0
Coordinate Landscape 0 0 0 0 0
Coordinate Structural 0 0 0 0 0
Coordinate Electrical 0 0 0 0 0
Total for Construction Document Phase 31 $3,862.00
TASK THREE: BIDDING/CONSTRUCTION PHASE
Site visits 1 0 3 3 6 $519.00
Submittals 1 0 3 3 6 $519.00
Total for Construction Phase 12 $1,038.00
Total 49 $5,494.00
Staff Position
Occurance
Total Hours
Total Fee
Senior PM
Project Landscape
Architect
Project Designer
ELECTRICAL ENGINEERING
Hourly Rate $115 $95 $80 $60 $45
SD Narrative and Drawings 1 01102 4 $265.00
Review meeting 1 02000 2 $190.00
Total for Schematic Design Phase 6 $455.00
TASK TWO: PERMIT DRAWINGS/CONSTRUCTION DOCUMENTS
Plans 1 01341 9 $620.00
Final Design review meeting 1 02000 2 $190.00
Submit to City for Permit 1 10121 5 $360.00
General Coordination 1 02220 6 $470.00
Total for Construction Document Phase 22 $1,640.00
TASK THREE: CONSTRUCTION PHASE
Site visits 1 03001 4 $330.00
Submittals 1 00202 4 $250.00
Total for Construction Phase 8 $580.00
Total 36 $2,675.00
TASK ONE: SCHEMATIC DESIGN
Occurance
Staff Position
Total Hours
Total Fee
Principal
Engineer
Designer
CAD Drafter
Clerical
Owner: AU Workshop
Project: City of Fort Collins Bike Shelter
Prepared by: Luke Fenske
Scope of Work: Cost Management Services
Date/Time: 4/14/17 7:57 AM
Phase/Item Subtotal Total Fee
FEE PROPOSAL SUMMARY
Prepare Statement of Probable Cost
a Schematic Design $1,410
TOTAL FEE PROPOSAL - ESTIMATING / ESTIMATING SUPPORT $1,410
Prepared By: Cumming Page 1
Project: AU Workshop
Portions: City of Fort Collins Bike Shelter
Stage: Schematic Design
Date:
ITEM
HEADING Sitework Building
TOTAL
QUANTITY
TAKEOFF
PRICING
DATA
ENTRY &
REPORT
MEETING
TIME
TRAVEL
TIME TOTAL HOURLY RATE TOTAL COST
HR HR HR HR HR HR HR HR $/HR $
Cost Estimate Preparation Tasks;
Structure (Sr. Cost Manager) 2 1 1 2 $ 150.00 $ 300
Sitework (Sr. Cost Manager) 3 2 1 3 $ 150.00 $ 450
Mechanical / Plumbing Systems (Sr Estimator) - - $ 150.00 $ -
Electrical Systems (Sr Estimator) 2 2 2 $ 150.00 $ 300
Cost Estimate Preparation Tasks - General all disciplines
(site, Arch, Struct and MEP)
Quality controls and finalization of the estimate (Managing
Director) 1.00
1
$ 180.00 $ 180
Estimate management & supervision (Managing Director) 1.0
1
$ 180.00 $ 180
TOTAL ESTIMATE
TOTAL FOR a 9 $ 1,410
b. Meeting with Client / Design Team / Contractor
Meetings prior to estimating
Meeting (Estimator 1) - $ 160.00 $ -
Meeting (Sr Estimator) - $ 175.00 $ -
Meeting (Estimating Manager) - $ 195.00 $ -
Meetings on completion of estimating
Meeting (Estimator 1) - $ 160.00 $ -
Meeting (Sr Estimator) - $ 175.00 $ -
Meeting (Estimating Manager) - $ 195.00 $ -
TOTAL FOR b - $ -
c. Reconciliation (Add Services)
Reconciliation (Estimator 1) - $ 160.00 $ -
Reconciliation (Sr Estimator) - $ 175.00 $ -
Reconciliation (Estimating Manager) - $ 195.00 $ -
TOTAL FOR c - $ -
TOTAL FEE PROPOSAL - Schematic Design SOPC 9 $ 1,410
April 14, 2017
CUMMING FEE PROPOSAL BACKUP
ESTIMATED HOURS COST
Prepared by: Cumming Page 2