HomeMy WebLinkAboutCHANGE ORDER - AGREEMENT MISC - APP DESIGN CONSULTANT (2)CHANGE ORDER NO 2.
PROJECT TITLE: McMurry Bridge Project
CONTRACTOR: Mario Miguel Echevarria
PROJECT NUMBER:
PURCHASE ORDER NO.: 9157068
DESCRIPTION: APP Project
1. Reason for change: The Artist will continue his work on the McMurry Bridge Railing
Project.
2. Description of Change: The artist will continue to work with the Project Team to develop the
final design, fabricate, and install the bridge railing on the McMurry Bridge Project.
The artist will work with a Structural Engineer to get signed/stamped
drawings for the bridge railing design. Artist will contact this Engineer to
review the first fabricated panel.
If requested, the artist will illustrate the design and depict the full length of
the bridge railing, for both sides of the bridge.
Artist will oversee all aspects of the bridge railing project.
Artist will oversee fabricators and fabrication and installation of the bridge
railing project.
Artist will work with the APP Coordinator and Project Team and keep them
informed on the progress of the project.
3. Change in Contract Cost: This will add an additional $4,349 to the design contract.
4. Change in Contract Time: The new design contract deadline is October 6, 2017
ORIGINAL CONTRACT COST $2,262___
TOTAL APPROVED CHANGE ORDERS $1,500___
TOTAL PENDING CHANGE ORDERS ________
TOTAL THIS CHANGE ORDER $4,349___
TOTAL % OF ORIGINAL CONTRACT, THIS C.O.: ____%
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S: ____%
ADJUSTED CONTRACT COST $8,111___
(Assuming all change orders approved)
ACCEPTED BY:__________________________________________ DATE:______________
Contractor's Representative
ACCEPTED BY:__________________________________________ DATE:______________
Project Manager
APPROVED BY:__________________________________________ DATE:______________
Purchasing Agent over $15,000
cc: Purchasing