Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8106 UTILITY INFRASTRUCTURE CONSTRUCTION SERVICES FOR WATER, WASTEWATER, AND STORMWATER FACILITIES CAPITAL IMPROVEMENTS (32)Utilities Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CONNELL RESOURCES, INC WORK ORDER NUMBER: 5026410131 PROJECT TITLE: Zone 3 - Old Town Library Water and Wastewater ORIGINAL BID/RFP NUMBER & NAME: 8106, Utility Infrastructure Construction Services for Water, Wastewater and Stormwater Facilities Capital Improvements MASTER AGREEMENT EFFECTIVE DATE: August 17, 2015 ARCHITECT/ENGINEER: HDR Engineering, Inc. OWNER’S REPRESENTATIVE: Brian Mulligan WORK ORDER COMMENCEMENT DATE: October 23, 2017 WORK ORDER COMPLETION DATE: February 23, 2018 MAXIMUM FEE: (time and reimbursable direct costs): $35,975.00 PROJECT DESCRIPTION/SCOPE OF SERVICES: Work includes field investigation services, cost estimation, best construction methods for the current utility layouts, utility locates, potholing, and geotech bore testing. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of one (1) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Connell Resources, Inc. By: Date: Name: Title: DocuSign Envelope ID: 1E5F22C9-4E2B-42EA-A553-95F80EF62640 John Martin Warren October 16, 2017 Vice President Utilities Work Order Form Official Purchasing Form Last updated 10/2017 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference. ACCEPTANCE: Date: Brian Mulligan, Special Project Manager REVIEWED: Date: Pat Johnson, Senior Buyer APPROVED AS TO FORM: Date: Name,City Attorney's Title (if greater than $1,000,000) ACCEPTANCE: Date: Owen Randall, Water Systems Engineering Division Manager ACCEPTANCE: Date: Matt Fater, Water Engineering & Field Services Operations Manager ACCEPTANCE: Date: Kevin Gertig, Utilities Executive Director (if greater than $1,000,000) ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) ACCEPTANCE: Date: Darin Atteberry, City Manager (if greater than $1,000,000) ATTEST: Date: City Clerk (if greater than $1,000,000) DocuSign Envelope ID: 1E5F22C9-4E2B-42EA-A553-95F80EF62640 October 16, 2017 October 17, 2017 October 18, 2017 October 18, 2017 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT A WORK ORDER SCOPE OF SERVICES/COST DETAILS/SCHEDULE DocuSign Envelope ID: 1E5F22C9-4E2B-42EA-A553-95F80EF62640 Page 1 EXHIBIT B ZONE 3 UTILITIES DESIGN - CONNELL RESOURCES, INC. WORK PLAN Labor Category or Sub-consultant Proj Mgr Construction Super Construction Manager EH&S / CAD TECH Pothole Crew Expenses TASK TOTAL TOTAL Individual Dan G. Clint F. / Shawn O John W. Connell Rate / hour $100 $100 $125 $75 $275 INVESTIGATION AND DESIGN PHASE SERVICES Task 1 Preliminary Final Design Meetings 1.1 Design Meetings 80 15 8 $10,500 1.2 Final Design Meetings 4 2 2 $850 1.3 Public Outreach Meeting / Schedule 4 2 $650 1.4 Site Meetings 10 10 2 $2,250 Subtotal: 98 27 14 0 0 0 Task 1 subtotal: $14,250 Task 2 Field Investigation 2.1 Utility Locates 2 2 2 $950 2.2 Potholing 8 8 24 1,000 $9,200 2.3 Geotech Bore Test holes $0 Subtotal: 10 10 0 0 26 1,000 Task 2 subtotal: $10,150 Task 3 Cost Estimates for Alternatives 3.1 HDD 8 2 1 $1,125 3.2 PIPE BURST 8 2 1 $1,125 3.3 Open Cut 8 2 1 $1,125 $0 Subtotal: 24 6 3 0 0 0 Task 3 subtotal: $3,375 Task 4 Cost Estimating / Contract Negotiation 5.1 Kick-off meeting with Independent Estimators 5 2 $700 5.2 Estimate Preparation 40 4 4 1 $4,975 5.3 Estimate Reconcilliation 5 $500 Subtotal: 50 6 4 1 0 0 Task 5 subtotal: $6,175 Task 5 Administration 6.1 Administration 4 1 4 $825 6.2 Permits (SWMP/ Construction Dewatering/ APEN) 1 8 500 $1,200 Subtotal: 5 0 1 12 0 500 Task 6 subtotal: $2,025 level of effort per labor category (hours): 187 49 22 13 26 297 <<Total Manhours total costs per labor category, sub-consult. & expenses: $ 18,700 $ 4,900 $ 2,750 $ 975 $ 7,150 $ 1,500 Total Costs>> $ 35,975 staff-weeks: 4.68 1.23 0.55 0.33 0.65 Total Man-weeks: 7.43 DocuSign Envelope ID: 1E5F22C9-4E2B-42EA-A553-95F80EF62640