Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8073 ENGINEERING SERVICES FOR WATER, WASTEWATER & STORMWATER FACILITIES CAPITAL IMPROVEMENTS PROJECTS (9)SECTION 00950 CHANGE ORDER NO. 1 PROJECT TITLE: 2016 Copper Slough Master Plan Update CONTRACTOR: ICON Engineering, Iinc. PROJECT NUMBER: 5040452820 DESCRIPTION: 1. Reason for change: Pay for out of scope items requested by the City and move the study from an Alternative Analyis study to a Selected Plan. (see attached scope and fee) 2. Description of Change: Additional funding is necessary to move this study to a selected plan by updating costs for all master plan improvements. This additional funding also includes paying for out of scope items from the previous study as discussed in the attached change orde 3. Change in Contract Cost: $23,045 4. Change in Contract Time: 8/1/2017 to 12/31/2017 ORIGINAL CONTRACT COST $ 42,020.00 TOTAL APPROVED CHANGE ORDER $ 23,045.00 TOTAL PENDING CHANGE ORDER 0.00 TOTAL THIS CHANGE ORDER $ 23,045.00 TOTAL % OF THIS CHANGE ORDER 51% TOTAL C.O.% OF ORIGINAL CONTRACT 51% ADJUSTED CONTRACT COST $ 65,065.00 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Representative REVIEWED BY: DATE: Project Manager APPROVED BY: DATE: Director of Purchasing & Risk Management (over $60,000) cc: City Clerk Contractor Engineer Project File Architect Purchasing DocuSign Envelope ID: F1C12436-5E13-4A66-BEC2-A98FA1B44899 7/28/2017 7/31/2017 October 16, 2017