HomeMy WebLinkAboutWORK ORDER - RFP - 7515 CONSULTING ENGINEERING SERVICES FOR FUTURE WATER WW & SW FACILITIES CAPITAL IMPFOVEMENTSWORK ORDER
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
Ditesco Project & Construction Services
DATED: July 22, 2013
Work Order Number: 201711
Purchase Order Number:
Project Title: Pine Street Utilities – Construction Phase Services
Original Bid/RFP Number & Name: 7515, Consulting Engineering Services for Future W/WW &
Stormwater Facilities Capital Improvements
Commencement Date: October 6, 2017
Completion Date: December 15, 2017
Maximum Fee: (time and reimbursable direct costs):$6,441.00
Project Description: Replacement of 100 year old water main and water services in Pine Street
Scope of Services: See attached supporting documentation
Contractor agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Construction Work
Order Agreement between the parties. In the
event of a conflict between or ambiguity in the
terms of the Construction Work Order Agreement
and this work order (including the attached forms)
the Construction Work Order Agreement shall
control.
The attached forms consisting of five (5) pages
are hereby accepted and incorporated herein, by
this reference, and Notice to Proceed is hereby
given upon full execution of this document.
CONTRACTOR
Signature: _________________________
By:_______________________________
Title: _____________________________
Date:_____________________________
CITY OF FORT COLLINS
Submitted By: _________________________
James Rose, Special Project Manager
Date: _________________________
Reviewed by: _________________________
Pat Johnson, Senior Buyer
Approved by: _________________________
Owen L. Randall, Chief Engineer
Date: _________________________
Approved by: _________________________
Matt Fater, Water Engineering & Field
Services Operations Interim Manager
Date: ________________________
Approved by: _________________________
Kevin Gertig, Utilities Executive Director
Date: ________________________
Approved by: _________________________
Gerry Paul, Purchasing Director (if over
$60,000)
Date: _______________________
DocuSign Envelope ID: 66615113-2C34-484B-8155-AE57195A60B0
Owner/Manager
KEITH MEYER
4/10/2017
October 4, 2017
Page 1 of 5
2133 South Timberline Road, Suite 110
Fort Collins, CO 80525
ditescoservices.com
Delivery by email to:
jrose@fcgov.com
September 30, 2017
Mr. Jay Rose
City of Fort Collins Utilities
700 Wood Street
Fort Collins, CO 80521
RE: Walnut Street Utilities
Construction Phase – Scope of Services
Dear Jay:
This proposal follows on our recent conversations regarding the continued work on the Walnut and Pine Street
waterlines. As the project is moving into the construction phase, this proposal is presented to provide resident
engineering and construction support to Fort Collins Utilities staff.
We look forward to working with you to continue replacement of the aged infrastructure in the downtown area of
Fort Collins. Thank you again for this opportunity!
Please let me know if you have any questions or require further information regarding this proposal, I can be
reached by phone at 970.988.8605 and email keith.meyer@ditescoservices.com.
Sincerely,
Keith Meyer, P.E.
Enc. scope of services
Cc: file
DocuSign Envelope ID: 66615113-2C34-484B-8155-AE57195A60B0
Page 2 of 5
Exhibit A
Walnut Street Utility Rehabilitation – Pine Street Only
Construction Phase
Scope of Services
Project Understanding
The City of Fort Collins Utilities has immediate goals to replace aged infrastructure throughout the Downtown area.
A first look at the infrastructure condition throughout Downtown came through the Old Town Masterplan completed
by Matt Fater in early 2016. Now, due to planned roadway improvements, the City desires to upgrade both water
and sewer pipelines in Walnut and Pine Streets immediately adjacent to Old Town Square.
Based on the current design, waterline is being replaced in Pine Street from valve V25703, where the City recently
installed new pipeline, to Walnut Street. In Walnut, parallel 4” and 6” waterlines from Pine to Linden are planned to
be replaced with a single pipeline to serve both sides of the street.
Overall, our scope of services is to provide resident engineering services during construction for the water line
replacement. The overall schedule is expected to last approximately 1 month for the Pine Street waterline.
Phase: Construction
• Our staff will coordinate, attend and document one pre-construction meeting.
• We will conduct weekly progress meetings with the general contractor. We will provide meeting minutes for
all meetings.
• Our staff will perform daily site inspections (part time) to ensure quality construction and conformity to the
plans and specifications. We will provide field resident engineering support addressing field changes
quickly to avoid construction delays. We will provide the City with weekly reports documenting the
contractors work progress and other pertinent information.
• We will assist in review of all project submittals providing comments directly to the general contractor and
coordinated with the City.
• Ditesco staff will review all material test reports. We will comment on reports not meeting specifications
and recommend remediation measures if necessary. We will ensure the appropriate numbers of tests are
taken and that they are sampled according to industry standards and the project specifications.
• We will maintain a photographic log of the project documenting pre-construction, construction and post
construction conditions. This work is expected to include brief descriptions of each photograph with a
filename, time and date reference.
• We will coordinate work between the City, general contractor and outside agencies (e.g. utility companies,
City) affected by the project.
• We will conduct a final punch list walk through for various stages of the work.
• Ditesco personnel will ensure that an as-built plan set is maintained. This will be a redlined drawing set
maintained by our staff and will be coordinated with plan changes that may be documented by the general
contractor
Deliverables:
• Deliverables will include full project documentation presented as electronic files including: construction
correspondence, schedules, submittals, transmittals, reports, photographs, meeting notes, record
drawings and other relevant information produced throughout the construction phase. All documents
will be provided in an electronic form on external drives for City use.
DocuSign Envelope ID: 66615113-2C34-484B-8155-AE57195A60B0
Page 3 of 5
Schedule
The anticipated schedule for design of the Walnut Utilities project is as follows.
Construction – Pine Street: September – mid October 2017
Fee Estimate
We have based our fee estimate on the following assumptions of the project schedule.
• 3 week construction for Pine Street waterline
Total Estimated Fee: $6,441.00
A detailed task breakdown is included. Please find this on page 5 of this scope of work proposal.
The fee shown above is to be billed on a time and material basis based on the rates shown in the table on page 4 and 5 of this
proposal. All reimbursable expenses will be billed at direct cost.
DocuSign Envelope ID: 66615113-2C34-484B-8155-AE57195A60B0
Page 4 of 5
Ditesco
City of Fort Collins Utilities
Consulting Engineering Services – Water, Wastewater, Stormwater
2014 Wage Rate Schedule
Principal: $115.00 - $125.00 per hour
Project Manager: $95.00 - $100.00 per hour
Engineer: $92.00 - $110.00 per hour
Construction Manager/Resident Engineer: $91.00 - $94.00 per hour
CAD Design $65.00 per hour
Administrative: $55.00 per hour
Mileage Reimbursement: $0.75 per mile
Subconsultant Markup 5% of cost
All other costs at direct expense
Terms 30 days net
DocuSign Envelope ID: 66615113-2C34-484B-8155-AE57195A60B0
City of Fort Collins Utilities
PIne Street Utilities - Construction Phase Services 9/30/2017
Keith Meyer Jill Burrell Rhonda Bunner Aly Corcoran
Principal Project Manager CAD Design Resident Engineer
(hrs) (hrs) (hrs) (hrs)
$125 $100 $65 $95
Construction Phase - Pine Street $6,315
CM 1.6 - Preconstruction Photos W 0 0 0 2 $190
CM 1.7 - Preconstruction Meeting W 2 2 0 2 $640
CM 1.9 - Submittal/Shop Drawing Review W 0 2 0 0 $200
CM 1.10 - Progress Meetings W 3 0 0 3 $710
CM 1.14 - Resident Engineering W 4 0 0 35 $3,870
CM 1.15 - Weekly Reports W 0 0 0 0 $0
CM 3.1 - Punch List Walkthrough W 0 0 0 0 $0
CM 3.2 - Record Drawings W 1 0 6 2 $705
CM 3.4 - Project Close Out W 0 0 0 0 $0
Other direct costs at 2.0% (mileage, reproduction, etc) W $126
Work Effort Subtotal 10 4 6 45 $6,315
ODCs $126
Cost per labor category $1,278.13 $400.00 $390.00 $4,246.50
Effort (days) 1 1 1 6
Effort (weeks) 0 0 0 1
Hours per day 0.2 0.1 0.1 1.1
Total Contract Value: $6,441
Phase/Task Description
Classification
Task Total
Sub Consultants
(none)
Fund
Page 5 of 5
DocuSign Envelope ID: 66615113-2C34-484B-8155-AE57195A60B0
October 4, 2017
October 4, 2017