Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 7546 DIRECTIONAL BORING & TRENCHING SERVICES (15)Requisition Form Today's Date: Requisition No.: Ship To: Date Entered: Date Required: Date Approved: Special Instructions: Date Denied: Description Total Charge Number Authorized By: Authorized By: Name, title typed here under the line under the line Name, title typed here under the line Unit Price extra service needed Change Order #2 PO9172964 $17,695.00 5010082672.535010.3660 ng -- 180828 E-A423-84E0348D52C2   57765 9/26/17 -hh SECTION 00950 CHANGE ORDER NO. 2 PROJECT TITLE: Prospect/Timberline PO NUMBER: 9172964 CONTRACTOR: Colorado Boring PROJECT NUMBER: 1630-2672 DESCRIPTION: 1. Reason for change: Additional services needed. L&P needed Colorado Boring to put together and install 8-5” and 4-2” conduits into a steel casing. 2. Description of Change: Extra services needed 3. Change in Contract Cost: 17,695.00 4. Change in Contract Time: none ORIGINAL CONTRACT COST $ 167,088.00 TOTAL APPROVED CHANGE ORDER 12,906.00 TOTAL PENDING CHANGE ORDER 17,695.00 TOTAL THIS CHANGE ORDER 17,695.00 TOTAL % OF THIS CHANGE ORDER % TOTAL C.O.% OF ORIGINAL CONTRACT % ADJUSTED CONTRACT COST $ 197,689.00 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Representative REVIEWED BY: DATE: Project Manager APPROVED BY: DATE: Janet Mctague APPROVED BY:__________________________________ DATE:__________________ Tim McCollough APPROVED BY: DATE: Purchasing cc: City Clerk Contractor Engineer DocuSign Envelope ID: 011B8499-6341-4FE4-9FB2-5DB91293E4CE      DocuSign Envelope ID: BA6B6C78-6D26-401E-A423-84E0348D52C2 Project File Architect Purchasing DocuSign Envelope ID: 011B8499-BA6B6C78-6341-6D26-4FE4-401E-9FB2-A423-5DB91293E4CE 84E0348D52C2