Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8254 PARK ARCHITECTURAL SERVICES ON-CALLCity of Fort Collins Park Planning and Development Rolland Moore Ballfield Re-lighting Scope of Work Proposal May 22, 2017 Revised 8.3.17 AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND ARCHITECTURE WEST LLC. Project Title: Rolland Moore Ballfields - Site re-lighting renovations Commencement Date: March, 2017 Architect - Architecture West LLC; Assist with Project Team Coordination for the site re- lighting for two of the four baseball fields. Coordinate with Musco Lighting, selected lighting sub-contractor, designer & installer. Provide Schematic design and constructability review meetings with Staff. Review DD design development and final CD construction documents, as needed. Building Dept. and Planning amendment processing, is not included. SCOPE of WORK - Basis of Design (BOD) Architectural; CD base CADD files - (20hrs.) = $ 1,620. Design & drawing coordination - (16hrs.) = $ 1,680. Meetings/Site visits - (20hrs.) = $ 2,100. Coord. Design Team - (18hrs.) = $ 1890. CA – (00hrs.) = $ TBD. Sub-total_________________________________ $ 7,290. Additional Provided Consultants Electrical Engineering; - $ 5,750. Professional Engineering Consultants Electrical Engineering; - $9,380. $ 7,620. reviews + $1,760. meetings Clanton & Associates (Additional scope of work) $ 3,240. (Review lighting specifications and revised lighting plan, add for meetings) TOTAL___________________________________ $25,660. EXCLUSIONS - M&P Engineering, lighting design and installation, landscape & irrigation, Civil, soils or structural Engineering, site development, Planning/zoning submittals or public meetings, Construction Administration, bidding, shop drawing reviews, etc., Art in Public Places, ADA Accessibility reviews or others not specifically noted above. Musco Lighting, under separate contract. Stephen J. Steinbicker, AIA, NCARB LEED Accredited Professional BD+C