HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8254 PARK ARCHITECTURAL SERVICES ON-CALLCity of Fort Collins
Park Planning and Development
Rolland Moore Ballfield Re-lighting
Scope of Work Proposal
May 22, 2017
Revised 8.3.17
AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND ARCHITECTURE WEST LLC.
Project Title: Rolland Moore Ballfields - Site re-lighting renovations
Commencement Date: March, 2017
Architect - Architecture West LLC; Assist with Project Team Coordination for the site re-
lighting for two of the four baseball fields. Coordinate with Musco Lighting, selected lighting
sub-contractor, designer & installer. Provide Schematic design and constructability review
meetings with Staff. Review DD design development and final CD construction documents,
as needed. Building Dept. and Planning amendment processing, is not included.
SCOPE of WORK - Basis of Design (BOD)
Architectural;
CD base CADD files - (20hrs.) = $ 1,620.
Design & drawing coordination - (16hrs.) = $ 1,680.
Meetings/Site visits - (20hrs.) = $ 2,100.
Coord. Design Team - (18hrs.) = $ 1890.
CA – (00hrs.) = $ TBD.
Sub-total_________________________________ $ 7,290.
Additional Provided Consultants
Electrical Engineering; - $ 5,750.
Professional Engineering Consultants
Electrical Engineering; - $9,380.
$ 7,620. reviews + $1,760. meetings
Clanton & Associates
(Additional scope of work)
$ 3,240. (Review lighting specifications and revised lighting plan, add for meetings)
TOTAL___________________________________ $25,660.
EXCLUSIONS -
M&P Engineering, lighting design and installation, landscape & irrigation, Civil, soils or structural Engineering, site
development, Planning/zoning submittals or public meetings, Construction Administration, bidding, shop drawing
reviews, etc., Art in Public Places, ADA Accessibility reviews or others not specifically noted above. Musco Lighting,
under separate contract.
Stephen J. Steinbicker, AIA, NCARB
LEED Accredited Professional BD+C