Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 8106 UTILITY INFRASTRUCTURE CONSTRUCTION SERVICES FOR WATER, WASTEWATER, AND STORMWATER FACILITIES CAPITAL IMPROVEMENTS (4)SECTION 00950 CHANGE ORDER NO. 01 PROJECT TITLE: Pine Street Water Main Replacement CONTRACTOR: Connell Resources, Inc. PROJECT NUMBER: 201709 PO NUMBER: 9175452 ORIGINAL BID/RFP NUMBER & NAME: 8106 Utility Infrastructure Construction Services for Water, Wastewater, and Stormwater Facilities Capital Improvements DESCRIPTION: 1. Reason for change: Construction Completed at Reduced Cost due to reduced footage of water main and service connections required. This caused savings across several interrelated bid items. 2. Description of Change: Reduction in Contract Cost 3. Change in Contract Price: ($73,140.65) 4. Change in Contract Time: None ORIGINAL CONTRACT PRICE $228,230.00 TOTAL APPROVED CHANGE ORDER $0.00 TOTAL PENDING CHANGE ORDER $0.00 TOTAL THIS CHANGE ORDER ($73,140.65) TOTAL % OF THIS CHANGE ORDER 32% TOTAL C.O.% OF ORIGINAL CONTRACT 32% ADJUSTED CONTRACT COST $155,062.35 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Representative REVIEWED BY: DATE: Pat Johnson, Senior Buyer SUBMITTED BY: DATE: Owen Randall, Chief Engineer & Project Manager APPROVED BY: DATE: Matt Fater, Water Engineering and Field Services Manager APPROVED BY: DATE: _________________ Gerry Paul, Purchasing Director (over $60,000) DocuSign Envelope ID: 8C389253-5041-4F10-84D1-55D5386DC2FE