Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutWORK ORDER - RFP - 8106 UTILITY INFRASTRUCTURE CONSTRUCTION SERVICES FOR WATER, WASTEWATER AND STORMWATER FACILITIES CAPITAL IMPROVEMENTSWORK ORDER
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
Hydro Construction
DATED: 08/17/2015
Work Order Number: SCP-WTF-HydroGateLoops-1
Purchase Order Number:
Project Title: WTF Replacement – Gate Loops Replacement
Original Bid/RFP Number & Name: 8106, Utility Infrastructure Construction Services for Water,
Wastewater and Stormwater Facilities Capital Improvements
Commencement Date: 09/25/2017
Completion Date: 12/31/2017
Maximum Fee: (time and reimbursable direct costs):$20,591.33
Project Description: Utility Infrastructure Construction Services for Water, Wastewater and Stormwater
Facilities Capital Improvements
Scope of Services: Services shall include gate loop investigation, removal, installation, and electrical
work in association with the access gates located at the Fort Collins Water
Treatment Facility
Contractor agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Construction Work
Order Agreement between the parties. In the
event of a conflict between or ambiguity in the
terms of the Construction Work Order Agreement
and this work order (including the attached forms)
the Construction Work Order Agreement shall
control.
The attached forms consisting of ( )
pages are hereby accepted and incorporated
herein, by this reference, and Notice to Proceed is
hereby given upon full execution of this document.
CONTRACTOR
Signature: _________________________
By:_______________________________
Title: _____________________________
Date:_____________________________
CITY OF FORT COLLINS
Submitted By: _________________________
Sue Paquette, Special Project Manager
Date: _________________________
Reviewed by: _________________________
Pat Johnson, Senior Buyer
Reviewed by: _________________________
Mark Kempton, Water Production Manger
Date: _________________________
Approved by: _________________________
Carol Webb, Water Resources & Treatment
Operations Manager
Date: ________________________
Approved by: _________________________
Kevin Gertig, Utilities Executive Director
(if over $1,000,000)
Date: ________________________
Approved by: _________________________
Gerry Paul, Purchasing Director (if over
$60,000)
Date: _______________________
three 3
NO: 1
PROJECT: FCWTF
LOCATION: Fort Collins Water Treatment Plant
ITEM: Traffic Detection Loops
LABOR
$ Subsist Total
Employee Hr. Fringe Hours Sub-Total Burden Labor
Project Manager $35.00 $0.00 2 $70.00 38% $96.60
Field Engineer $29.00 $0.00 16 $464.00 38% $640.32
Superintendent $35.00 $0.00 8 $280.00 38% $386.40
Operator $31.00 $0.00 0 $0.00 38% $0.00
Craftsmen $28.00 $0.00 12 $336.00 38% $463.68
Laborer $20.00 $0.00 12 $240.00 38% $331.20
Project Coordinator $24.00 $0.00 0 $0.00 38% $0.00
Total This Item $1,918.20
EQUIPMENT (INTERNAL)
$
Wk Weeks Sub-Total Repairs Fuel
Pick-up $250.00 1 $250.00 $62.50 $137.50 $450.00
Mini - Excavator $621.00 0 $0.00 $0.00 $0.00 $0.00
Bobcat $927.00 0 $0.00 $0.00 $0.00 $0.00
Track Hoe $3,020.00 0 $0.00 $0.00 $0.00 $0.00
Backhoe $1,621.00 0 $0.00 $0.00 $0.00 $0.00
Concrete Saw $375.00 1 $375.00 $0.00 $0.00 $375.00
Confined Space Equip $250.00 0 $0.00 $0.00 $0.00 $0.00
Crane $3,060.00 0 $0.00 $0.00 $0.00 $0.00
Loader $1,800.00 0 $0.00 $0.00 $0.00 $0.00
Small Tools (saw blades, etc.) $57.55
Total This Item $882.55
CONSUMABLE SUPPLIES
Misc. $100.00
Total This Item $100.00
PERMANENT MATERIALS
Total This Item $0.00
SUBCONTRACTORS & SERVICES
Advanced Caulking $650.00
Interstates $15,000.00
Total This Item $15,650.00
INDIRECTS
Labor $1,918.20
Equipment $882.55
Consumable Materials $100.00
Permanent Materials $0.00
Subcontractors & Services $15,650.00
Indirects $0.00
Sub-Total Cost $18,550.75
Profit & Overhead $2,040.58 11.0% Profit & Overhead
Total of Above: $20,591.33
2 of 4
DocuSign Envelope ID: 86AD5E95-B80F-431E-83B7-BC5F5E575C41
Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18
Project Start
Construction
Completion Date
Substantial Completion
Project Schedule
3 of 4
DocuSign Envelope ID: 86AD5E95-B80F-431E-83B7-BC5F5E575C41
The ACORD name and logo are registered marks of ACORD
CERTIFICATE HOLDER
© 1988-2014 ACORD CORPORATION. All rights reserved.
ACORD 25 (2014/01)
AUTHORIZED REPRESENTATIVE
CANCELLATION
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
JECT LOC
POLICY PRO-
GEN'L AGGREGATE LIMIT APPLIES PER:
CLAIMS-MADE OCCUR
COMMERCIAL GENERAL LIABILITY
PREMISES (Ea occurrence) $
DAMAGE TO RENTED
EACH OCCURRENCE $
MED EXP (Any one person) $
PERSONAL & ADV INJURY $
GENERAL AGGREGATE $
PRODUCTS - COMP/OP AGG $
DED RETENTION $
CLAIMS-MADE
OCCUR
$
AGGREGATE $
UMBRELLA LIAB EACH OCCURRENCE $
EXCESS LIAB
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
INSR
LTR TYPE OF INSURANCE POLICY NUMBER
POLICY EFF
(MM/DD/YYYY)
POLICY EXP
(MM/DD/YYYY) LIMITS
PER
STATUTE
OTH-
ER
E.L. EACH ACCIDENT
E.L. DISEASE - EA EMPLOYEE
E.L. DISEASE - POLICY LIMIT
$
$
$
ANY PROPRIETOR/PARTNER/EXECUTIVE
If yes, describe under
DESCRIPTION OF OPERATIONS below
(Mandatory in NH)
OFFICER/MEMBER EXCLUDED?
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY Y / N
AUTOMOBILE LIABILITY
ANY AUTO
ALL OWNED SCHEDULED
HIRED AUTOS
NON-OWNED
AUTOS AUTOS
AUTOS
COMBINED SINGLE LIMIT
BODILY INJURY (Per person)
BODILY INJURY (Per accident)
PROPERTY DAMAGE $
$
$
$
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSD
ADDL
WVD
SUBR
N / A
$
$
(Ea accident)
(Per accident)
OTHER:
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
INSURED
PHONE
(A/C, No, Ext):
PRODUCER
ADDRESS:
E-MAIL
FAX
(A/C, No):
CONTACT
NAME:
NAIC #
INSURER A :
INSURER B :
INSURER C :
INSURER D :
INSURER E :
INSURER F :
INSURER(S) AFFORDING COVERAGE
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
INS025 (201401)
9/6/2017
Flood and Peterson
PO Box 578
Greeley CO 80632
Dana Stewart, CLCS, CIC, CISR
(970)266-7149 (970)330-1867
DStewart@floodpeterson.com
Hydro Construction Company Inc.
301 E Lincoln Ave
Fort Collins CO 80524
Phoenix Insurance Company 25623
Travelers Indemnity Company 25658
Travelers Property Casualty Company 25674
Pinnacol Assurance 41190
Zurich American Insurance Company 16535
CL1733116969
A
X
X
X
DTCO8G990899PHX16 4/1/2017 4/1/2018
1,000,000
300,000
10,000
1,000,000
2,000,000
2,000,000
B X
X X
DT8108G990899IND17 4/1/2017 4/1/2018
1,000,000
C
X X
X 10,000 DTSMCUP8G990899TIL17 4/1/2017 4/1/2018
5,000,000
5,000,000
D N
2091550 4/1/2017 4/1/2018
X
1,000,000
1,000,000
1,000,000
E Builders Risk PR04012017 4/1/2017 4/1/2018 $15,000,000 Limit
E Installation Floater PR04012017 4/1/2017 4/1/2018 $1,000,000 Limit
RE: 17-01-475 WTF Replacement-Gate Loops Replacement - Owner's Project #SCP-WTF-HydroGateLoops-1
City of Fort Collins is included as Additional Insured on the General, Automobile, and Umbrella Liability
Policies if required by written contract or agreement and with respect to work performed by Insured
subject to the policy terms and conditions.
N Mosbrucker CIC,CISR
City of Fort Collins
700 Wood Street
Fort Collins, CO 80521-1945
4 of 4
DocuSign Envelope ID: 86AD5E95-B80F-431E-83B7-BC5F5E575C41
1 of 4
DocuSign Envelope ID: 86AD5E95-B80F-431E-83B7-BC5F5E575C41
Jim Eurich
COO
9/6/2017
9/6/2017
9/7/2017
9/7/2017