Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 8475 CIVIL ENGINEERING PROFESSIONAL ON-CALL (10)Official Purchasing Form Last updated 10/2017 Work Order Form WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND INTERWEST CONSULTING GROUP WORK ORDER NUMBER: PROJECT TITLE: Power Trail at Harmony - Surveying ORIGINAL BID/RFP NUMBER & NAME: RFP 8475: Civil Engineering Professional On Call MASTER AGREEMENT EFFECTIVE DATE: June 1, 2017 WORK ORDER COMMENCEMENT DATE: 3-21-2018 WORK ORDER COMPLETION DATE: MAXIMUM FEE: (time and reimbursable direct costs): $92,000 PROJECT DESCRIPTION/SCOPE OF SERVICES: See Attached Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of five (5) page(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: 3-21-18 Michael Oberlander, Sr. PM ACCEPTANCE: Date: Name, Project Manager REVIEWED: Date: Name, Buyer or Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) Caleb Feaver 3/26/2018 400903821-INTERWEST-18-01 3/27/2018 2/1/2019 March 21, 2018 Mr. Caleb Feaver City of Fort Collins – Engineering PO Box 580 Fort Collins, CO 80522-0580 Power Trail at Harmony - Surveying Project Description and Scope of Services Dear Caleb, Description King Surveyors will provide surveying services for the above project in accordance with the attached scope. Their total estimated fee at this time is $89,744. Interwest will coordinate the work between King and the City and process all invoicing. An allowance is $2,256 has been added to the work order for time that may be needed for Interwest coordination and administration. Schedule We can proceed immediately with the field work for the project (but will likely want to meet with you again to discuss coordinating City utility locates). Please call me at 970-460-8471 if you have any questions or need any additional information. Hourly rates will be billed in accordance with the 2017 agreement. Thanks, Michael Oberlander, PE 650 East Garden Drive I Windsor, Colorado 80550 I p. 970.686.5011 I f. 970.686.5821 www.kingsurveyors.com March 26, 2018 City of Fort Collins Attn: Caleb Fever 281 North College Avenue Fort Collins, CO 80522 Re: Harmony Power Trail Caleb: King Surveyors is pleased to provide you with a proposal to perform the following services: Preparation of Topographic Survey and Basemap: ITEM I-Topographic Survey The fee to provide a Topographic Survey of the area shown on the provided KMZ will be $24,690. This survey will be tied to a City of Fort Collins Bench Mark (NAVD 1988) and will be tied to State Plane Coordinates, North Zone 1983/2011. The topo will be delivered in an AutoCAD Civil 3D 2016 dwg or standard PDF file format. ITEM II-Basemap The fee to provide a Basemap of the area shown on your drawing will be $3800. This would show approximate platted and deeded lot lines and easements based on found available evidence. ITEM III-Utility Locates The fee to provide private utility locates from Primo Locating Services, LLC will be $3,890. ITEM IV-Potholes The fee to locate potholes will be $3,720. This assumes 2 full days of field work will be needed. ITEM V-Aerial Imagery The fee to provide current high resolution aerial imagery of the entire site via an Unmanned Aircraft System will be $3,670. 650 East Garden Drive I Windsor, Colorado 80550 I p. 970.686.5011 I f. 970.686.5821 www.kingsurveyors.com ITEM VI-Flagger The fee to provide a ‘Flagger In Charge” from RailPros Field Services, Inc will be $950/day for a standard 8 hour day. $125/hr for overtime after 8 hours. It is estimated that a Flagger will need to be present for 5 days: $4,750. ITEM VII-Misc Survey It is anticipated that additional field work may be required as the project progresses that is not specified in this proposal. A $5,168 allowance would cover approximately 3 days of field work and some additional drafting support. ITEM VIII-Meetings Attendance of two meetings if necessary: $475 Topographic Survey/Basemap Total: $50,163 Preparation of CDOT Right of Way Plans for Harmony Road: ITEM I Review and plot title commitment information for 11 parcels: $2,470-it is assumed that the City of Fort Collins will provide all necessary title commitments for all effected parcels and provide updated commitments if necessary. ITEM II Preliminary Right of Way Plans: $5,990 ITEM III Preliminary Property Descriptions for Right of Way Acquisition, assuming 13 parcels with a total of 13 descriptions: $6,476 (approx. $500 per description) ITEM IV Preliminary Property Descriptions for Temporary Construction Easements (TCE) and Utility Easements (UE), if necessary, assuming 11 parcels with one UE and one TCE for a total of 22 descriptions: $11,069 (approx. $500 per description) ITEM V Finalize Right of Way Plans: $2,956 ITEM VI Finalize Property Descriptions: $3,800 ITEM VII Stake ROW, Easements & Temporary Easements for Property Owners: $3,410 ITEM VIII-Post Construction Set monuments on right of way line for all parcels: Setting CDOT approved monuments (assumed to be #4 rebar with standard plastic cap): $3,410 ROW Plans Total: $39,581 650 East Garden Drive I Windsor, Colorado 80550 I p. 970.686.5011 I f. 970.686.5821 www.kingsurveyors.com Total Cost Topographic Survey/Basemap $50,163 ROW Plans $39,581 Project total: $89,744 This proposal is based on King Surveyors being awarded all items listed. If one or more items is omitted from the scope, the amounts shown may need to be revised. If you have any questions regarding this proposal, please feel free to contact me at my office at (970) 686-5011. Sincerely, Steven Parks, PLS stevep@kingsurveyors.com $ 95.00 $ 83.00 $ 88.00 $ 79.00 $ 74.00 $ 142.00 Topo Survey and Base Map ITEM I-Topographic Survey 10 60 130 $ 24,690 $ - $ 24,690 ITEM II-Basemap 40 $ 3,800 $ - $ 3,800 ITEM III-Utility Locates $ - $ 3,890 $ 3,890 ITEM IV-Potholes 10 20 $ 3,720 $ - $ 3,720 ITEM V-Aerial Imagery 10 20 $ 3,670 $ - $ 3,670 ITEM VI-Flagger $ - $ 4,750 $ 4,750 ITEM VII-Misc Survey 4 6 30 $ 5,168 $ - $ 5,168 ITEM VIII-Meetings 5 $ 475 $ - $ 475 CDOT Right of Way Plans ITEM I - Review Titlework 26 $ 2,470 $ - $ 2,470 ITEM II - Preliminary ROW Plans 26 40 $ 5,990 $ - $ 5,990 ITEM III - Preliminary Descriptions - Right of Way 20 52 $ 6,476 $ - $ 6,476 ITEM IV - Preliminary Descriptions - Easements 35 88 $ 11,069 $ - $ 11,069 ITEM V - Finalize ROW Plans 20 12 $ 2,956 $ - $ 2,956 ITEM VI - Finalize Descriptions 40 $ 3,800 $ - $ 3,800 ITEM VII - Stakeout for Property Owners 6 20 $ 3,410 $ - $ 3,410 ITEM VII - Set Right of Way Monuments 6 20 $ 3,410 $ - $ 3,410 Interwest Administration $ 2,256 $ 2,256 $ - $ 2,256 TOTAL $ 22,610 $ 830 $ 23,584 $ - $ - $ 34,080 $ 2,256 $ 83,360 $ 8,640 $ 92,000 Service King Surveyors Power Trail at Harmony - Survey Interwest Team (King Surveyors) - Fee Estimate - 3/23/18 Draftsman CAD I Survey Crew Project Surveyor Project Manager CAD II Interwest Total Cost Per Task Labor Cost Per Task Reimbursable