HomeMy WebLinkAboutCHANGE ORDER - RFP - 8073 ENGINEERING SERVICES FOR WATER, WASTEWATER & STORMWATER FACILITIES CAPITAL IMPROVEMENTS PROJECTSCHANGE ORDER NO. 1 PROJECT TITLE: Boxelder Creek and Cooper Slough (Boxelder 6) LOMR CONTRACTOR: Ayres Associates, Inc. 3665 JFK Parkway, Building 2, Suite 200 Fort Collins, CO 80525-3152 PURCHASE ORDER: 9166314 PROJECT ACCOUNT NUMBER: 504.5040452306.521210.6 DESCRIPTION: 1. Reason for change: Additional services 2. Description of Change: A bug in the latest EPASWMM model release caused incorrect calculations of detention storage and resulting stormwater discharge totals. As a result, the consultant had to revise input data and re-run both hydrology (EPASWMM) and hydraulics (HEC-RAS) models, update floodplain mapping exhibits, and revise LOMR Report text prior to resubmittal to FEMA for review and approval. Fort Collin’s share of the total cost of $20,125 is 17% ($3,421.25). See attached detailed scope and fee breakdown. 3. Change in Contract Cost: $3,421.25 4. Change in Contract Time: N/A ORIGINAL CONTRACT COST $ 21,907.90 TOTAL APPROVED CHANGE ORDER 0.00 TOTAL PENDING CHANGE ORDER .00 TOTAL THIS CHANGE ORDER $3,421.25 TOTAL % OF THIS CHANGE ORDER 15.6 % TOTAL C.O.% OF ORIGINAL CONTRACT 15.6 % ADJUSTED CONTRACT COST $25,329.15 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Representative REVIEWED BY: DATE: Project Manager / Department Manager APPROVED BY: DATE: Purchasing DocuSign Envelope ID: 25BB3F96-ADEC-4671-AFCC-060F6CF8BC7E    DocuSign Envelope ID: 68F4CEBA-8874-448F-BE28-9EDBD63E05BC   5HT PZ Task Description QA/QC (John Hunt, PE) Sr. Project Manager (Chris Pletcher, PE) Project Engineer II (Matt Simpson, PE, Matthew Hickox, PE) Project Engineer I (Scott Nesbitt, PE) CAD / GIS Word Processor / Editor / ContracAdmin Clerical Total Labor Cost Direct Costs Total by Task $185 $185 $130 $115 $120 $75 Task 1 Re-work due to SWMM 5.1.011 bug 1.1 Diagnose SWMM bug and research with SWMM authors and user group 1 22 $ 3,045 $ - $ 3,045 1.2 Coordinate with FEMA Reviewers on issue and schedule 2 4 $ 890 $ - $ 890 1.3 Re-Run 100-Year hydrology and compare to CLOMR 1 6 $ 965 $ - $ 965 1.4 Re-Run HEC-RAS for 100-Year and assess changes to Floodplain / Floodway 16 $ 2,080 $ - $ 2,080 1.5 Re-Run Hydrology for 2, 5, 10, 25, 50 Year Events, including Larimer-Weld Canal unsteady HEC-RAS 16 $ 2,080 $ - $ 2,080 1.6 Re-Run Hydrdaulics for 10 and 50 Year Events (2, 5 and 25 are not run in HEC-RAS or mapped) 8 $ 1,040 $ - $ 1,040 1.7 Update Hydrology Documentation and Tables (Appendix Materials) 1 4 $ 705 $ - $ 705 1.8 Update Hydraulics Documentation (Appendix Materials) 1 24 $ 3,305 $ - $ 3,305 1.9 Revise Report Text 2 24 $ 3,490 $ - $ 3,490 1.10 Update Mapping Exhibits - check and revise where needed 2 40 $ 5,570 $ - $ 5,570 Subtotal 9 142 $ 20,125 $ - $ 20,125 Total 9 142 $ 20,125 $ - $ 20,125 Budget Breakdown Based On 16.6 Total Miles of Mapped Floodplain: COFC Mapped Floodplain (west side of Prospect) = 2.8 miles (17%) = $3,421.25 Timnath Mapped Floodplain (I-25 boxes to Poudre River) = 5.8 miles (34%) = $6,842.50 Remainder of mapped floodplain update = 8.0 miles (49%) = $9,861.25 Total $20,125.00 Ayres Associates - Professional Services Fee Proposal Boxelder LOMR Design Fee - Additional Services due to SWMM Version Bug Based on Scope of Services dated 2/14/18 LABOR DETAIL AND SUMMARY OF DIRECT AND SUBCONSULTING COSTS BY TASK DocuSign Envelope ID: 25BB3F96-68F4CEBA-ADEC-8874-448F-4671-BE28-AFCC-9EDBD63E05BC 060F6CF8BC7E