WORK ORDER
PURSUANT TO A MASTER AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
HYDRO CONSTRUCTION, INC.
WORK ORDER NUMBER: H-WRF-2018-07
PROJECT TITLE: DWRF Design Support for Digester 612 Lid
ORIGINAL BID/RFP NUMBER & NAME: 8286, Construction Contractor for Projects
at the Water and Wastewater Treatment
Facilities
MASTER AGREEMENT EFFECTIVE DATE: June 20, 2016
ARCHITECT/ENGINEER: Carollo Engineering
OWNER’S REPRESENTATIVE: Eileen Dornfest
WORK ORDER COMMENCEMENT DATE: February 10, 2018
WORK ORDER COMPLETION DATE: December 1, 2018
MAXIMUM FEE: (time and reimbursable direct costs): $27,650.00
PROJECT DESCRIPTION/SCOPE OF SERVICES: Design support for digester 612 lid,
including cost estimating, site inspections, participation in design review meetings, and
reviewing design drawings. See the attached supporting documentation.
Service Provider agrees to perform the services identified above and on the attached forms in
accordance with the terms and conditions contained herein and in the Master Agreement
between the parties. In the event of a conflict between or ambiguity in the terms of the Master
Agreement and this Work Order (including the attached forms) the Master Agreement shall
control.
The attached forms consisting of three (3) pages are hereby accepted and incorporated herein,
by this reference, and Notice to Proceed is hereby given after all parties have signed this
document.
SERVICE PROVIDER: Hydro Construction, Inc.
By: Date:
Name: Title:
Page 1 of 7
DocuSign Envelope ID: 11ABDE71-D7C6-41F1-857D-A106CB0A92F9
February 1, 2018
Preston Randall Vice President
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
OWNER’S ACCEPTANCE & EXECUTION:
This Work Order and the attached Contract Documents are hereby accepted and incorporated
herein by this reference.
ACCEPTANCE: Date:
Eileen Dornfest, Special Project Manager
REVIEWED: Date:
Pat Johnson, Senior Buyer
APPROVED AS TO FORM: Date:
Name,City Attorney's Title
(if greater than $1,000,000)
ACCEPTANCE: Date:
Owen Randall, Water Systems Engineering Division Manager
ACCEPTANCE: Date:
Carol Webb, Water Resources & Treatment Operations Manager
ACCEPTANCE: Date:
Jason Graham, Water Reclamation & Biosolids Division Manager
ACCEPTANCE: Date:
Kevin Gertig, Utilities Executive Director
(if greater than $1,000,000)
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
ACCEPTANCE: Date:
Darin Atteberry, City Manager
(if greater than $1,000,000)
ATTEST: Date:
City Clerk
(if greater than $1,000,000)
Page 2 of 7
DocuSign Envelope ID: 11ABDE71-D7C6-41F1-857D-A106CB0A92F9
February 1, 2018
February 1, 2018
February 2, 2018
February 7, 2018
February 7, 2018
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT A
WORK ORDER SCOPE/COST OF SERVICES
Page 3 of 7
DocuSign Envelope ID: 11ABDE71-D7C6-41F1-857D-A106CB0A92F9
Hydro Construction Company, Inc. DWRF - Digester 612 Lid Replacement Design Page 2
1/31/2018 8:05 AM
Item Description Takeoff Qty
Labor
Amount
Material
Amount
Subcontract
Amount Name
Equipment
Amount
Other
Amount
Total
Amount
1100.100 Project Management
12 Coordination Meetings 8.00 ea 2,340 - 1,696 0 - 4,036
14 Design Review Workshops 2.00 ea 1,170 - 848 0 - 2,018
16 Cost Estimating 1.00 ls 4,858 - 2,120 0 - 6,978
Project Management 8,368 4,664 13,032
64.00 Labor hours
64.00 Equipment hours
1370.100 Scheduling
10 Scheduling 1.00 ls 4,388 0 1,760 - - 6,148
Scheduling 4,388 1,760 6,148
1400.100 Misc. Labor Expense
10 Estimate Reconciliation 1.00 day 1,170 848 - 2,018
Misc. Labor Expense 1,170 848 2,018
8.00 Labor hours
8.00 Equipment hours
2531.018 Utility Tie-Ins
10 Site Investigation 1.00 ls 1,546 500 - 859 806 3,710
Utility Tie-Ins 1,546 500 859 806 3,710
28.00 Labor hours
Page 4 of 7
DocuSign Envelope ID: 11ABDE71-D7C6-41F1-857D-A106CB0A92F9
Hydro Construction Company, Inc. DWRF - Digester 612 Lid Replacement Design Page 3
1/31/2018 8:05 AM
Estimate Totals
Description Amount Totals Hours Rate Cost Basis Cost per Unit Percent of Total
Labor 15,473 100.000 hrs 55.96%
Material 500 1.81%
Subcontract 7,272 26.30%
Equipment 859 72.000 hrs 3.11%
Other 806 2.91%
24,910 24,910 90.09 90.09%
Profit & Overhead 2,740 11.000 % T 9.91%
2,740 27,650 9.91 100.00%
Total 27,650
Page 5 of 7
DocuSign Envelope ID: 11ABDE71-D7C6-41F1-857D-A106CB0A92F9
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT B
WORK ORDER SCHEDULE DETAIL
Page 6 of 7
DocuSign Envelope ID: 11ABDE71-D7C6-41F1-857D-A106CB0A92F9
Activity ID Activity Name Original
Duration
Start Finish Total
Float
Predecessors Successors
DWRF- D Digester 611 Lid Replacement 379 25-Jan-18 22-Jul-19 29
Design 113 25-Jan-18 03-Jul-18 296
Project Co Coordination 5 25-Jan-18 31-Jan-18 403
A1000 Kickoff Meeting & Site Walk Through 0 25-Jan-18 29 A1010, A106
A1010 Coordination & Design Review Meetings 5 25-Jan-18 31-Jan-18 403 A1000
Basis of De Design 14 25-Jan-18 13-Feb-18 395
A1020 Digester Survey/Measurements 5 25-Jan-18 31-Jan-18 403
A1040 Existing Documentation Review 5 25-Jan-18 31-Jan-18 403
A1030 Digester Inspection 5 06-Feb-18* 13-Feb-18 395
A1050 Digester Structural Inspection 5 06-Feb-18* 13-Feb-18 395
30% Desig Design/Procurement Doc Prep 50 25-Jan-18 04-Apr-18 29
A1060 Prepare 30% Design Documents 20 25-Jan-18 21-Feb-18 29 A1000 A1070
A1070 Corollo Internal QA/QC of 30% Documents 10 22-Feb-18 07-Mar-18 29 A1060 A1080
A1080 30% Design Documents to City/Hydro for Review 10 08-Mar-18 21-Mar-18 29 A1070 A1090
A1090 Prepare Final Digester Lid Procurement Documents 10 22-Mar-18 04-Apr-18 29 A1080 A1150
Design Dev Development 65 02-Apr-18 03-Jul-18 296
A1100 Prepare 90% Design Documents 30 02-Apr-18* 14-May-18 296 A1110
A1110 Corollo Internal QA/QC of 90% Design Documents 10 14-May-18 29-May-18 296 A1100 A1120
A1120 90% Draft Design Documents to City/Hydro for Review 10 29-May-18 12-Jun-18 296 A1110 A1130
A1130 Prepare Issued for Construction Documents 10 12-Jun-18 26-Jun-18 296 A1120 A1140
A1140 Issue for Construction Documents to City/Hydro 5 26-Jun-18 03-Jul-18 296 A1130
Lid Procu Procurement 248 05-Apr-18 27-Mar-19 29
A1150 Shop Drawings Procurement 30 05-Apr-18 16-May-18 29 A1090 A1160
A1160 Shop Drawing Review 15 17-May-18 07-Jun-18 29 A1150 A1170
A1170 Lid Fabrication 200 08-Jun-18 22-Mar-19 29 A1160 A1180
A1180 Lid Delivery 3 25-Mar-19 27-Mar-19 29 A1170 A1220
Construc Construction 97 06-Mar-19 22-Jul-19 29
A1190 Mobilization 5 06-Mar-19* 13-Mar-19 35 A1200
A1200 Work Area Construction/Grading 5 13-Mar-19 20-Mar-19 35 A1190 A1210, A122
A1210 Cleaning Interior Digester 10 20-Mar-19 03-Apr-19 78 A1200 A1230
A1220 New Lid Fabrication 42 28-Mar-19 24-May-19 29 A1200, A118 A1250
A1230 Skinning Existing Lid 7 03-Apr-19 12-Apr-19 78 A1210 A1240
A1240 Existing Ballast Demolition 5 12-Apr-19 19-Apr-19 78 A1230 A1270
A1250 Coating New Digester 20 28-May-19 24-Jun-19 29 A1220 A1260
A1260 Install New Guiderails 3 25-Jun-19 27-Jun-19 29 A1250 A1270
A1270 Fly Existing Lid Out/Install New Lid 1 28-Jun-19 28-Jun-19 29 A1260, A124 A1280, A129
A1280 Ballast Install 5 01-Jul-19 08-Jul-19 39 A1270
A1290 Gas Pipe/PRV Install 10 01-Jul-19 15-Jul-19 34 A1270
A1300 Fill Digester With Water 12 01-Jul-19 17-Jul-19 29 A1270 A1320
A1320 Commissioning 3 18-Jul-19 22-Jul-19 29 A1300
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019 4, 2019
DWRF- Digester 611 L
Design
Project Coordination
Kickoff Meeting & Site Walk Through
Coordination & Design Review Meetings
Basis of Design
Digester Survey/Measurements
Existing Documentation Review
Digester Inspection
Digester Structural Inspection
30% Design/Procurement Doc Prep
Prepare 30% Design Documents
Corollo Internal QA/QC of 30% Documents
30% Design Documents to City/Hydro for Review
Prepare Final Digester Lid Procurement Documents
Design Development
Prepare 90% Design Documents
Corollo Internal QA/QC of 90% Design Documents
90% Draft Design Documents to City/Hydro for Review
Prepare Issued for Construction Documents
Issue for Construction Documents to City/Hydro
Lid Procurement
Shop Drawings Procurement
Shop Drawing Review
Lid Fabrication
Lid Delivery
Construction
Mobilization
Work Area Construction/Grading
Cleaning Interior Digester
New Lid Fabrication
Skinning Existing Lid
Existing Ballast Demolition
Coating New Digester
Install New Guiderails
Fly Existing Lid Out/Install Ne
Ballast Install
Gas Pipe/PRV Install
Fill Digester With Water
Commissioning
Data Date:25-Jan-18 DWRF- Digester 611 Lid Replacement Current Date:24-Jan-18
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Page 1 of 1 TASK filter: All Activities