Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7575 CONSULTING ENGINEERING SERVICES WATER TREATMENT FACILITY DESIGN AND CONSTRUCTION SERVICESUtilities Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CH2M HILL ENGINEERING, INC. WORK ORDER NUMBER: CH-2018 WTF – SCP11518 PROJECT TITLE: WTF Engineering Assistance and Service ORIGINAL BID/RFP NUMBER & NAME: 7575, Consulting Engineering Services for Water Treatment Facility Design & Construction Services MASTER AGREEMENT EFFECTIVE DATE: February 24, 2014 ARCHITECT/ENGINEER: CH2M HILL Engineering, INC OWNER’S REPRESENTATIVE: Sue Paquette WORK ORDER COMMENCEMENT DATE: January 15, 2018 WORK ORDER COMPLETION DATE: July 1, 2018 MAXIMUM FEE: (time and reimbursable direct costs): $60,000.00 PROJECT DESCRIPTION/SCOPE OF SERVICES: Professional engineering services to design and repair projects at Fort Collins Water Treatment Facility (WTF). Services shall include design and consulting assistance on repairs, replacement, maintenance, and operational projects located at the WTF. See the Exhibit A – Scope of Services. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of three (3) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: CH2M HILL Engineering, Inc. By: Date: Name: Title: Page 1 of 7 DocuSign Envelope ID: 0D5CE20B-EC40-4783-8D7B-A279719609E5 Vice President January 9, 2018 Kevin Heffernan Utilities Work Order Form Official Purchasing Form Last updated 10/2017 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference. ACCEPTANCE: Date: Sue Paquette, Special Project Manager REVIEWED: Date: Pat Johnson, Senior Buyer APPROVED AS TO FORM: Date: Name,City Attorney's Title (if greater than $1,000,000) ACCEPTANCE: Date: Owen Randall, Water Systems Engineering Division Manager ACCEPTANCE: Date: Mark Kempton, Water Production Division Manager ACCEPTANCE: Date: Carol Webb, Water Resources & Treatment Operations Manager ACCEPTANCE: Date: Kevin Gertig, Utilities Executive Director (if greater than $1,000,000) ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) ACCEPTANCE: Date: Darin Atteberry, City Manager (if greater than $1,000,000) ATTEST: Date: City Clerk (if greater than $1,000,000) Page 2 of 7 DocuSign Envelope ID: 0D5CE20B-EC40-4783-8D7B-A279719609E5 January 9, 2018 January 9, 2018 January 9, 2018 January 11, 2018 January 11, 2018 January 11, 2018 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT A WORK ORDER SCOPE OF SERVICES Page 3 of 7 DocuSign Envelope ID: 0D5CE20B-EC40-4783-8D7B-A279719609E5 Exhibit A - Scope of Services Exhibit B to the AGREEMENT between the City of Fort Collins, Colorado, a Municipal Corporation, hereinafter referred to as the City, and CH2M HILL Engineers, Inc., hereinafter referred to as the Professional, for a project generally described as Professional Services and assistance for the design, replacement, and repair of WTF Projects. The Professional’s services for the project are detailed hereinafter. Project Objective: To provide treatment process consultation and design assistance to the City for various WTF Projects at the Water Treatment Facility (WTF) and related facilities. It is understood the City will designate Ms. Sue Paquette as the City Project Managers (PMs) and primary points of contact with respect to the work performed under this AGREEMENT, with authority to transmit instructions, receive information, and interpret and define City policies and decisions relative to elements pertinent to the work covered by this AGREEMENT. Task 1 – WTF Design, Replacement, and Repair Project’s Engineering Assistance Professional will provide engineering and design assistance for WTF repairs and replacement projects for City staff when requested. Engineering assistance services are anticipated to include the following: Regulatory review, treatment process consultation, and design support for Water Treatment Unit Processes replacement projects; replacement repairs, submittal review of WTF replacement equipment; construction observations; regulatory assistance, cathodic protection and corrosion control design and field measurements, project meeting and scope development, project management, and others as noted per request. Requests for project engineering assistance will be initiated through written or e-mail authorization by the City’s PM. Professional will communicate scope and level of effort for requested assistance, as appropriate. Professional’s Project Manager (PM) shall prepare, implement, monitor, and update the project execution plan throughout the project. Professional’s PM will prepare and submit to the City’s PM, on a monthly basis, a brief cost and schedule status report. The report will include a narrative description of progress to-date, actual costs for each item, estimates of percent complete, and potential cost variances. Deliverables: The following deliverables will be prepared as required for this task: • Design Documents (plans, specifications, calculations), • Engineering Technical Memorandums, • Observation Reports, and • Monthly project cost and schedule status reports and Invoices. Assumptions Used in Developing this Scope of Services The Professional’s estimate of engineering costs for the project is based on the elements included in task descriptions above, and the following assumptions: 1. City will examine information submitted by Professional and render in writing or otherwise provide decisions within two weeks. 2. City will give prompt notice to Professional whenever City observes or becomes aware of any development that affects the scope or timing of Professional’s services, or of any defect in the work of Professional. 3. Professional will provide the City with deliverables as defined respectively in this scope of work. Page 4 of 7 DocuSign Envelope ID: 0D5CE20B-EC40-4783-8D7B-A279719609E5 4. All deliverables will be distributed electronically via email (pdf format). 5. Meetings with the City will be held at the City’s service center office or water treatment facility. 6. APDS Contractor will provide conceptual construction cost estimates to assist with evaluations of alternatives when applicable. Final pricing construction work will be performed by APDS contractor. 7. In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the project, Professional has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by operating personnel or third parties; and other economic and operational factors that may materially affect the ultimate project cost or schedule. Therefore, Professional makes no warranty that City's actual project costs, financial aspects, economic feasibility, or schedules will not vary from Professional’s opinions, analyses, projections, or estimates. If City wishes greater assurance as to any element of project cost, feasibility, or schedule, City will employ an independent cost estimator, contractor, or other appropriate advisor. 8. Professional will manage the health, safety and environmental activities of its staff to achieve compliance with applicable health and safety laws and regulations. Professional will coordinate with responsible parties to correct conditions that do not meet applicable federal, state and local occupational safety and health laws and regulations, when such conditions expose Professional staff, or City staff, to unsafe conditions. Professional is not responsible for health or safety precautions of construction workers. Professional is not responsible for the City’s APDS Contractor’s compliance with the health & safety requirements in the contract for construction, or with federal, state, and local occupational safety and health laws and regulations. 9. Professional’s observation of the work is not an exhaustive observation or inspection of all work performed by the Contractor. Professional does not guarantee the performance of the Contractor. Professional’s observations will not relieve the Contractor from responsibility for performing the work in accordance with the contract for construction, and Professional will not assume liability in any respect for the construction of the project. Should Professional discover or believe that any work by the Contractor is not in accordance with the contract for construction, or is otherwise defective, or not conforming to requirements of the contract or applicable rules and regulations, Professional will bring this to the attention of the Contractor and the City. 10. All intellectual property contained in the elements used to construct the Professional’s Parametric Design and Cost Estimating System (CPES) models will remain property of Professional. No access to the structure and code behind these elements will be provided. Page 5 of 7 DocuSign Envelope ID: 0D5CE20B-EC40-4783-8D7B-A279719609E5 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT B WORK ORDER COST DETAIL Page 6 of 7 DocuSign Envelope ID: 0D5CE20B-EC40-4783-8D7B-A279719609E5 Exhibit C Compensation Schedule Kevin Heffernan Principal In Charge Al Paquet Principal Project Manager Brad Schutt Engineer Specialist Mark Merklein Sr. Structural Engineer Alex Sutherland Project Engineer Janelle Prange Project Engineer Skylor Flaska Technician 3 Craig Van Horn Corrosion Engineer Gretchen Sage Contracts Administration/ Accounting Labor Hours Labor Expense Total Cost Per Diem Code/Classification 02 03 05 04 08 8 13 06 04 19 2018 Labor Rates (1) $250 $238 $188 $205 $130 $130 $125 $162 $205 $94 Task 1 WTF Design and Repair Projects 1.1 Design and Repair Projects 4 50 80 20 20 22 40 16 12 264 $46,220 $630 $46,850 1.2 Project Management 8 20 2 20 50 $9,050 $100 $9,150 1.3 Subconsultant Allowance 0 $0 $4,000 $4,000 Total 12 70 80 20 20 22 40 16 2 32 314 $55,270 $4,730 $60,000 Notes The 2018 rates were used as bases of estimate. Hower 2017 rates will remain in effect until February 25, 2018 per the Professional Service Agreement renewal terms. Exhibit_C_Fee_WTF_Design_Repair_Projects_2017_12_29.xlsx\Fee Estimate 12/29/2017 Page 7 of 7 DocuSign Envelope ID: 0D5CE20B-EC40-4783-8D7B-A279719609E5