Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9180381ICONENGINEERING, 7000 S. Yosemite Street, Suite 120, Centennial, INC. CO 80112 303.221.0802 | www.iconeng.com Planning | Design | Management Exhibit A Scope of Work West Vine Basin Floodplain Update City of Fort Collins 12/5/2017 ICON Engineering, Inc. is pleased to provide this proposal for engineering services to complete the floodplain update for the West Vine basin. Goals for this project are to update the floodplain mapping to reflect the changes in hydrology identified for the West Vine Basin in 2015. This work will also incorporate recent improvements made to the West Vine Central Flow Path, north of Vine Drive, in addition to current LiDAR topography. Our scope of work is outlined below. A fee spreadsheet has been provided for your review. Base Services – Phase 1: Task 1: Correspondence: Up to four (4) project meetings and up to four (4) periodic conference calls have been assumed for project correspondence. All other correspondence items will be made via phone calls and emails. Task 2: Data Collection & Topography: ICON will assemble current LiDAR topographic data and aerial base mapping as provided by the USGS/FEMA and the City. ICON will also incorporate as-constructed topography, as provided by the City, for the West Vine Central Flow Path, located north of Vine Drive. Finally, ICON will coordinate any new survey needs with City staff. Surveying will be completed by the City. Task 3: Hydraulic Analyses: New hydraulic analyses will be performed for the Central, Cherry/Sunrise, Eastern, Southern, Southeastern, Northeastern, Northern, and Laporte Avenue Flow Paths. ICONENGINEERING, INC. Page 2 of 3 I:\Proposal\misc2016\16-PRO-061_West Vine Hydraulics\ICON Scope of Service West Vine Hydraulics2.docx These flow paths were originally defined by the February 2013, Baseline Hydraulics Report Chapter for the West Vine Basin Master Plan. ICON will review previous cross- section locations, stream centerlines, and roughness assumptions. ICON will attempt to maintain past modeling features; however adjustments will be made, as needed, for the update. Similar to the past modeling effort, time has been included to address minor split flow variations between flow paths and to evaluate “with” and “without” berm conditions that exist along the Southern Flow Path, west of Poudre High School and along the Central Flow Path downstream of the Hollywood/Irish Pond. Hydraulics will be evaluated for the 2-, 10-, and 100-year flood events using flows identified in the recent hydrologic update. 0.5-foot rise floodways will be developed for each flow path, unless the additional floodway surcharge can be conveyed by adjacent flow paths. Base Services – Phase 2: Task 4: Floodway Delineation and Flood Profiles: Floodplains will be delineated for the 100-year flood event only. Floodplain and floodway delineations will be presented along with profile baselines, hydraulic cross- sections, base flood elevations (BFEs), and base map references on project workmaps. Flood profiles will be generated for the flood frequencies identified above. Task 5: Submittals and Reports: ICON will assemble an updated version of Appendix C for the West Vine Basin Master Plan. This appendix will summarize the hydraulics background, data, methodology, and results from the study. Tables will be prepared documenting flood elevations and floodway data information. Technical backup information will be assembled in project appendices. Task 6: Review and Revisions: Time has been included to address comments from the City. ICONENGINEERING, INC. Page 3 of 3 I:\Proposal\misc2016\16-PRO-061_West Vine Hydraulics\ICON Scope of Service West Vine Hydraulics2.docx Optional Service 1: Project Webmap Upon approval from the City, ICON can prepare a project webmap to display the results of the hydraulic analysis. Optional fees for this task are estimated at $4,770. Project Fees and Schedule: A fee spreadsheet has also been provided for review. We estimate that Phase 1 of the project can be completed for $63,019, Phase 2 of the project for $27,706, and the optional webmap for $4,770. The total for all three phases is estimated at $95,495. We anticipate that the first phase of the project will be completed within an 8-month time frame. Other phases will be completed as funding allows. ICON ENGINEERING, INC. PROJECT ESTIMATING SHEET PROJECT NAME: West Vine Basin Floodplain Analysis CLIENT: CITY OF FORT COLLINS - Beck Anderson PREPARED BY: CDJ Principal Professional Professional Engineer GIS Admin GIS Survey Misc. CHECKED BY: CDJ Engineer III Engineer I IV Specialist Programmer Crew Direct DATE: 9/27/16 $169 $153 $135 $127 $91 $65 $115 $165 Costs Description Hours Hours Hours Hours Hours Hours Hours Hours TOTALS PHASE 1: HYDRAULIC MODELING Correspondence a. Project Meetings (4) 10 16 $300 $4,150 b. Conference Calls & Correspondence 612 $2,634 Data Collection & Topography a. Assemble Base Mapping & Topography 4 10 $1,450 b. Incorporate West Vine Central Flow Path north of Vine Drive 4 6 $1,086 c. Coordinate Survey Information with City 2 4 $100 $978 Hydraulic Analyses a. Floodplain Analyses - Central Flow Path 4.0 32 40 8 $10 $10,814 - Cherry Sunrise 1.0 8 10 2 $10 $2,711 - Eastern Flow Path 2.0 16 20 4 $10 $5,412 - Southeastern Flow Path 1.5 12 15 3 $10 $4,062 - Southern Flow Path 3.5 28 35 7 $10 $9,464 - Northern Flow Path 1.5 12 15 3 $10 $4,062 - Northeastern Flow Path 0.5 4 5 1 $10 $1,361 - Laporte Ave Split Flow 0.5 4 5 1 $10 $1,361 - Misc Split Flows 1.0 4 10 2 $10 $2,171 - "Without Berm" Evaluations 1.0 10 4 2 $10 $2,219 b. Floodway Analyses - Central Flow Path 2.0 12 4 $2,466 - Eastern Flow Path 1.0 8 2 $1,503 - Southeastern Flow Path 0.5 4 1 $752 - Southern Flow Path 2.0 12 4 $2,466 - Northern Flow Path 0.5 6 2 $1,149 - Northeastern Flow Path 0.5 4 1 $752 PHASE 2: WORKMAPS AND REPORTING Project Workmaps and Profiles a. Project Workmaps 4 16 40 $15 $6,491 b. Flood Profiles 2 12 40 $15 $7,053 Submittals and Report Items a. Appendix C - Baseline Hydraulics Report 8 32 16 4 4 $52 $8,380 b. Floodplain and Floodway Data Tables c. Technical Appendix Review and Revisions 12 16 20 4 $50 $5,782 TOTAL BASE SERVICES - PHASE 1 41 0 216 173 49 0 0 0 $500 $63,019 $6,929 $0 $29,160 $21,971 $4,459 $0 $0 $0 $500 $63,019 TOTAL BASE SERVICES - PHASE 2 14 0 72 72 64 8 0 0 $132 $27,706 $2,366 $0 $9,720 $9,144 $5,824 $520 $0 $0 $132 $27,706 Optional Service Project Webmap 8 40 $50 $4,770 TOTAL WITH OPTIONAL SERIVICE $95,495