Loading...
HomeMy WebLinkAbout150670 STANTEC CONSULTING SERVICES INC - CONTRACT - SOLE SOURCE - STANTEC CONSULTING SERVICES INC (3)Page 1 of 3 AMENDMENT #01 FIRST AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT FOR THE WATER MODELING SYSTEM UPGRADE This First Amendment to the Professional Service Agreement between the CITY OF FORT COLLINS and STANTEC CONSULTING SERVICES INC., is entered into by and between Stantec Consulting Services Inc., (the “Professional”) and the City of Fort Collins, Colorado (the “City”). WHEREAS, the Professional and the City have mutually entered into a Professional Services Agreement to upgrade the City’s raw water modeling system with a commencement date of March 29, 2017(the “Agreement”); and WHEREAS, Professional and the City desire to amend the Agreement to continue to work together. NOW, THEREFORE, in consideration of the foregoing recitals and the mutual promises herein contained, the parties agree as follows: 1. Contract Period. In accordance with the terms of the Agreement, the parties agree to extend the Agreement for an additional three (3) month period ending November 30, 2017. 2. Exhibit A, Statement of Work and Timeline. The work to be performed by the Professional shall be amended as follows: A. The following tasks were either not accounted for in the original budgeting, or required considerably more effort than anticipated. 1. Reservoir operation logic debug to match simulation of accruals in version a. Development of a custom build of MODSIM to test results 2. Streamlining of SSD calculations, e.g., monthly factor return flow construct 3. Run-time calculation of the return flow obligations was not budgeted in the SSD implementation 4. Implementation of the database and DMS compatible with Cloud-base DB services 5. DMS implementation able to simulate in parallel in multiple computers 6. Enhanced GUI with graphics and full compatibility to store user preferences in the database to run and post-processing 7. Complexity of some of the GUI variables (e.g., WSSC and PVLC), with of ramifications and dependencies with other variables that require significant preprocessing and runtime adjustments to be setup in MODSIM Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707- fax fcgov.com/purchasing DocuSign Envelope ID: 0FC19AFA-77D1-4B87-93A8-DD154A3CA86B Page 2 of 3 8. Automate the use of Excel for pre-processing complex variables and leverage current interaction with the PBN model B. Activities in the current scope that are still to be performed include: 1. Perform tests on the FCU version 8 model to use the standard MODSIM build instead of the custom build, simulating the reservoirs without the limitation of a single source (i.e., storage right) 2. Complete processing of the GUI variables into the MODSIM model, i.e., implement WSSD and PVLC interdependencies with runtime variables, including integrated logic to simulate the use of exchange potential 3. Develop a basic user documentation of the new features of the modeling system 4. Implement the interface to export Fort Collins model results and import them into the PBN model 5. Write code to complete optimization module and update database 6. Test/debug optimization C. Time & Budget 1. Professional has estimated the time and budget required to complete these remaining tasks at 96 hours and $13,224. 2. In addition, the City has requested a supplementary task to the original contract of a detailed demonstration and training workshop of the upgraded model and associated tools. This supplementary task is estimated at 46 hours and $6,490. IN WITNESS WHEREOF, the parties have executed this First Amendment the day and year shown. CITY OF FORT COLLINS: By: Gerry Paul Purchasing Director DATE: STANTEC CONSULTING SERVICES INC. By: Printed: Title: CORPORATE PRESIDENT OR VICE PRESIDENT Date: DocuSign Envelope ID: 0FC19AFA-77D1-4B87-93A8-DD154A3CA86B Chip Paulson 9/14/2017 Vice President 9/14/2017 Page 3 of 3 EXHIBIT A Budget Timeline Task Fardal Triana Mauzy Stewart Admin Mileage Cost $ 170.00 $ 163.00 $ 100.00 $ 120.00 $ 100.00 Complete DMS Development and Integration (Tasks 1-3) 48 $ 7,824 Complete Model Conversion (Tasks 4-6) 4 24 16 4 40 $ 5,440 Final Model Presentation Workshop (4 hr) 30 16 $ 6,490 Total 4 48 24 16 4 40 $ 19,754 Estimated Hours Task Complete DMS Development and Integration (Tasks 1-3) Complete Model Conversion (Tasks 4-6) Final Model Presentation Workshop (4 hr) Sep17 Oct17 Nov17 DocuSign Envelope ID: 0FC19AFA-77D1-4B87-93A8-DD154A3CA86B