Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7581 INDEPENDENT COST ESTIMATING (9)WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CAPSTONE INC. DATED: FEBRUARY 1, 2014 Work Order Number: OXL-ICE-082417 Purchase Order Number: Project Title: Oxbow Levee Improvement Project Original Bid/RFP Number & Name: 7581 - INDEPENDENT COST ESTIMATING Commencement Date: September 2017 Completion Date: November 2017 Maximum Fee: (time and reimbursable direct costs): $5,839.00 Project Description: (see attached) Scope of Services: (see attached) Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of two (2) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. PROFESSIONAL By:_______________________________ Date:_____________________________ CITY OF FORT COLLINS Submitted By: _________________________ Jason Stutzman, P.E., Special Project Manager Date: _________________________ Reviewed by: _________________________ Pat Johnson, Senior Buyer Reviewed by: _________________________ Owen L. Randall, Chief Engineer Date: _________________________ Approved by: _________________________ Jon Haukaas, Water Engineering & Field Services Operations Manager Date: ________________________ Approved by: _ N/A_______________________ Kevin Gertig, Utilities Executive Director Date: ________________________ Approved by: __N/A_______________________ Gerry Paul, Purchasing Director (if over $60,000) Date: _______________________ DocuSign Envelope ID: 640AFFD4-5CB5-4CFF-872C-C62DCAB87E32 9/5/2017 9/5/2017 9/6/2017 9/6/2017 9/6/2017 11001 West 120th Avenue, Suite 220 Broomfield, Colorado 80021 tel: 720.887.9191 or 800.788.8544 fax: 720.887.9292 web: www.capstone.com August 22, 2017 Mr. Jason Stutzman Special Projects Manager City of Fort Collins 215 N. Mason St. Box 580 Fort Collins, CO. 80522 jstutzman@fcgov.com Re: Proposal for Cost Estimating Services – Oxbow Levee Improvements Project. Dear Mr. Stutzman, Per your request, our maximum fee for development of the independent cost estimate for the above referenced project based on the information provided by you and the contract documents prepared by Anderson Consulting Engineers, Inc. dated September 29, 2016 is as follows: Pre-Estimate Orientation Meeting(s): Staff Description Estimated Hours Rate Estimated Fee Project Manager 2.0 $119.15 $238 Project Manager Travel Time (Rate x 80%) 2.0 $95.32 $191 Sr. Estimator 2.0 $108.32 $217 Sr. Estimator Travel Time (Rate x 80%) 2.0 $86.66 $173 Travel Mileage 280 $0.58 $162 Subtotal - Pre-Estimate Orientation Meeting = $981 Cost Estimate Preparation: Staff Description Estimated Hours Rate Estimated Fee Project Manager 6.0 $119.15 $715 Sr. Estimator 24.0 $108.32 $2,600 Subtotal - Cost Estimate Preparation = $3,315 DocuSign Envelope ID: 640AFFD4-5CB5-4CFF-872C-C62DCAB87E32 2 11001 West 120th Avenue, Suite 220 Broomfield, Colorado 80021 tel: 720.887.9191 or 800.788.8544 fax: 720.887.9292 web: www.capstone.com Estimate Review & Reconciliation Meeting: Staff Description Estimated Hours Rate Estimated Fee Project Manager 4.0 $119.15 $477 Project Manager Travel Time (Rate x 80%) 2.0 $95.32 $191 Sr. Estimator 5.0 $108.32 $542 Sr. Estimator Travel Time (Rate x 80%) 2.0 $86.66 $173 Travel Mileage 280 $0.58 $161 Subtotal - Estimate Review & Reconciliation Meeting = $1,543 Total Not-to-Exceed Fee = $5,839 Capstone anticipates completing and submitting the estimate for review in early September 2017 with a review and reconciliation meeting to be scheduled at a later date. Please contact me if you have any questions or require any additional information. Thank you for providing us with the opportunity to support your project. Sincerely, Frank Humbert VP / Sr. Project Manager DocuSign Envelope ID: 640AFFD4-5CB5-4CFF-872C-C62DCAB87E32 VENDOR: Capstone DATE ENTERED: REQ #: VENDOR #: FOR: ADDRESS: 11001 West 120th Avenue, Suite 220 BID #: Broomfield, Colorado 80021 INSTRUCTIONS: PHONE #: (970) 223‐3151 FAX #: VENDOR CONTACT: Frank Humbert Today's Date: August 24, 2017 Date Approved: Ship To: Date Denied: Date Required: asap QUANTITY DESCRIPTION TOTAL PRICE 1 $5,839.00 Total $5,839.00 Requested By: Reviewed By: Jason Stutzman, Project Manager Authorized By: Owen L. Randall, Chief Engineer Jon Haukaas, Manager, Water Engineering & Field Operations ICE Services 5040440012.521210.3 P.O. # CHARGE NUMBER CITY OF FORT COLLINS REQUISITION Oxbow Levee Improvement Project 7581 ‐ INDEPENDENT COST ESTIMATING DocuSign Envelope ID: 640AFFD4-5CB5-4CFF-872C-C62DCAB87E32