Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 8106 UTILITY INFRASTRUCTURE CONSTRUCTION SERVICES FOR WATER, WASTEWATER, AND STORMWATER FACILITIES CAPITAL IMPROVEMENTS (15)Requisition Form Vendor: Today's Date: August 16, 2017 Requisition No.: Ship To: Date Entered: Date Required: ASAP Date Approved: Special Instructions: Date Denied: Item # Quantity Unit Description Total Charge Numbers 1 1 1 $22,200.00 5040440008.535010.6 Requested By: Approved By: Linsey R. Chalfant Date Jon Haukaas Date Authorized By: Kevin Gertig Date NECCO Ponds and Backbone-Phase 2 Design Services Connell Resources Inc. Unit Price $22,200.00 DocuSign Envelope ID: 55D7C6BB-A3E5-4939-81FD-2C1B85C17521 8/25/2017 8/28/2017 WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CONNELL RESOURCES INC. DATED: August 17, 2015 Work Order Number: NECCO-Connell-3 Purchase Order Number: Project Title: Northeast College Corridor Outfall (NECCO)-Phase 2 Design Services Original Bid/RFP Number & Name: 8106 Utility Infrastructure Construction Services for Water, Wastewater and Stormwater Facilities Capital Improvements Commencement Date: September 2017 Completion Date: December 2017 Maximum Fee: $22,200 (See Attached Exhibit B) (time and reimbursable direct costs) Project Description: Design and estimating services related to the Northeast Corridor Outfall Project Phase 2 Scope of Services: (See Attached fee) Contractor agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Construction Work Order Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Construction Work Order Agreement and this work order (including the attached forms) the Construction Work Order Agreement shall control. The attached forms consisting of 1 (one) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given upon full execution of this document. Professional- CONNELL RESOURCES, INC. By:_______________________________ Date:_____________________________ CC: Purchasing CITY OF FORT COLLINS Submitted By: _________________________ Linsey R. Chalfant, PE, Special Project Manager Date: _________________________ Reviewed by: _________________________ Pat Johnson, Senior Buyer Reviewed by: _________________________ Owen L. Randall, Chief Engineer Date: _________________________ Approved by: _________________________ Jon Haukaas, Water Engineering & Field Services Operations Manager Date: ________________________ Approved by: _________________________ Kevin Gertig, Utilities Executive Director Date: ________________________ Approved by: _________________________ Gerry Paul, Purchasing Director (if over $60,000) Date: _______________________ Professional Services Agreement – Work Order Type 8073 Engineering Services for Future Water, Wastewater & Stormwater Facilities CIP DocuSign Envelope ID: 55D7C6BB-A3E5-4939-81FD-2C1B85C17521 8/17/2017 8/25/2017 8/25/2017 8/28/2017 8/28/2017 Connell Resources, Inc. 7785 Highland Meadows Pkwy, #100 Fort Collins, CO 80528 Phone: (970) 223-3151 Fax: (970) 223-3191 Estimator: Dan Giesler QUOTATION Date: 8/16/2017 Submitted To: City Of Fort Collins - Utilities Bid Title NECCO Maintenance Address: 700 Wood St. Bid Number: 2171543 Fort Collins, CO 80522 Project Location: Vine & Lemay Contact: Linsey Chalfant Project City, State: Fort Collins, CO Phone: (970) 221-6700 Fax: (970) 221-6619 Engineer/Architect: Ayres And Associates Item # Item Description Estimated Quantity Unit Unit Price Total Price 00-130 Office Trailer 5.00 MO $560.00 $2,800.00 00-145 Mtgs / Estimates 4.00 WK $3,300.00 $13,200.00 29-500 Maintain Erosion Control Allowance 1.00 WK $2,200.00 $2,200.00 29-502 Erosion Reports / Permits 5.00 DY $800.00 $4,000.00 Total Bid Price: $22,200.00 8/17/2017 11:43:52 AM Page 1 of 1 DocuSign Envelope EXHIBIT ID: 55D7C6BB-B A3E5-4939-81FD-2C1B85C17521