Loading...
HomeMy WebLinkAbout261519 CAROLLO ENGINEERING - PURCHASE ORDER - 9175097 (3)WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CAROLLO ENGINEERS, INC. DATED: September 15, 2015 Work Order Number: C-WRF-2017-14 Purchase Order Number: Project Title: DWRF Digester Circulation Pumps Replacement Original Bid/RFP Number & Name: 8115 Engineering Services for Water Reclamation and Biosolids Facility Design and Construction Services Commencement Date: August 1, 2017 Completion Date: March 31, 2017 Maximum Fee: (time and reimbursable direct costs): $41,729 Project Description: Engineering Design Services for DWRF Digester Circulation Pumps Replacement Scope of Services: See Attached. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of seven (7) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. CAROLLO ENGINEERS, INC By:_______________________________ Jason Garside, Vice President Date:_____________________________ CITY OF FORT COLLINS Submitted By: _____________________________ Eileen Dornfest, Project Manager Date: _____________________________ Reviewed by: _____________________________ Pat Johnson, Senior Buyer Date: _____________________________ Reviewed by: _____________________________ Jason Graham, Water Reclamation & Biosolids Manager Date: _____________________________ Reviewed by: _____________________________ Owen L. Randall, Chief Engineer Date: _____________________________ Approved by: _____________________________ Carol Webb, Water Resources & Treatment Operations Manager Date: ____________________________ Approved by: _____________________________ Gerry Paul, Purchasing Director (if over $60,000) Date: _____________________________ DocuSign Envelope ID: 6AD54AE5-A82B-498B-81C1-AA4A595EDA8D     Exhibit A Scope of Work DocuSign Envelope ID: 6AD54AE5-A82B-498B-81C1-AA4A595EDA8D FINAL (7-14-17) pg. 1 Scope of Work - Digester Recirculation Pump Replacement Design FINAL 7-14-17 The City of Fort Collins (City) intends to implement the following replacement project at the Drake Water Reclamation Facility (DWRF): DWRF Digester Recirculation Pumps - replacement of digester recirculation pumps, and pump intake and discharge piping improvements to allow for off-gassing and for reduction of clogging. Currently, gas build-up and solids clogging decreases flow capacity of the pumps from approximately 250 gpm to 80 gpm. The existing pumps are centrifugal-type and will be replaced with chopper-type pumps. The purpose of this Work Order is to provide the technical analysis and engineering, and preparation of drawings and specifications for the proposed replacement project. The level of detail for drawings and specifications will be similar to past replacement projects. It is anticipated that this design work will proceed beginning July 15, 2017 and construction will be completed by the end of 2017. Construction-related services are not included in the cost estimate attached. The scope of work is divided into the following major tasks, summarized below: Task 1 - Project Administration and Coordination Task 1.1 - Coordination Meetings Prepare for and participate in three (2), two (2) hour meetings with the Project Team to coordinate the pre-design and design activities. Appropriate Consultant staff and subconsultants will be in attendance based on the topics of discussion. Meeting agendas will be provided and a Decision Log will be kept up to date over the course of the Project. Coordination meetings will be conducted as needed during design. Task 1.2 - Quality Assurance/Quality Control (QA/QC) Perform quality assurance and quality control of all deliverables prepared by Consultant in accordance with Consultant's standard QA/QC policies and procedures. Task 1.3 - Progress Reporting Invoices will be submitted monthly in accordance with City payment protocols. Each invoice will be submitted with a progress report detailing the work executed during the invoice period and work remaining. Task 2 - Facility Investigations and Existing Documentation Review Task 2.1 - Facility Investigations Conduct walkthrough of facilities with plant staff to develop understanding of existing conditions and preferences for implementation of proposed improvements. Assume one (1), four (4) hour walkthrough. Consultant's Mechanical Engineer and Mechanical Technical Advisor will attend walkthrough. Consultant will prepare a written summary of information gathered and findings of walkthrough. Task 2.2 - Existing Documentation Review DocuSign Envelope ID: 6AD54AE5-A82B-498B-81C1-AA4A595EDA8D FINAL (7-14-17) pg. 2 Consultant will review existing documentation available for replacement project. City will provide existing documentation. Task 3 - Design Development Task 3.1 - Engineering Analyses Consultant will perform engineering analyses necessary for determining the appropriate solution for replacement project. Task 3.2 - Design Drawings and Specifications Prepare design drawings and specifications to progress the design of Project to 30 and 90 percent completion levels. The 90 percent drawings and specifications will be reviewed by City and revised by Consultant to produce the Issued for Construction documents. Prepare individual equipment specifications, if required. The drawings and specifications required for replacement project are assumed as the following: DWRF Digester Recirculation Pumps - 1 mechanical (plan view) drawing; 1 mechanical (section view) drawing; 1 electrical one-line drawing; 1 P&ID drawing; and 1 specification for pumps. DocuSign Envelope ID: 6AD54AE5-A82B-498B-81C1-AA4A595EDA8D Exhibit B Cost Estimate DocuSign Envelope ID: 6AD54AE5-A82B-498B-81C1-AA4A595EDA8D PROJECT Senior Professional (PIC) Lead Project Professional (PM) Project Professional (SME) Professional (PE) Disciplines (Structural+Arch) Disciplines (EIC) Disciplines (Civil, HVAC, Mech) Senior Technician Technician Document Processing/Clerical Billing Rate $238 $219 $238 $206 $171 $171 $147 $162 $110 $96 ation 2 14 4 12 0 8 0 0 0 1 41 $8,430 $0 $0 $0 $400 $480 $9,310 0 8 0 8 0 8 0 0 0 0 24 $4,768 $0 $0 $0 $400 $281 $5,449 rol 2 2 4 4 0 0 0 0 0 0 12 $2,690 $0 $0 $0 $0 $140 $2,830 0 4 0 0 0 0 0 0 0 1 5 $972 $0 $0 $0 $0 $59 $1,031 c Review 0 0 8 8 0 8 0 0 0 0 24 $4,920 $0 $0 $0 $1,000 $281 $6,201 0 0 4 4 0 4 0 0 0 0 12 $2,460 $0 $0 $0 $1,000 $140 $3,600 0 0 4 4 0 4 0 0 0 0 12 $2,460 $0 $0 $0 $0 $140 $2,600 0 10 10 34 8 34 0 20 20 4 140 $24,580 $0 $0 $0 $0 $1,638 $26,218 0 5 8 14 4 14 0 0 0 0 45 $8,961 $0 $0 $0 $0 $527 $9,488 ions 0 5 2 20 4 20 0 20 20 4 95 $15,619 $0 $0 $0 $0 $1,112 $16,731 2 24 22 54 8 50 0 20 20 5 205 $37,930 $0 $0 $0 $1,400 $2,399 $41,729 LABOR HOURS PROJECT COSTS Total Direct Labor Hours Total Labor Cost Ditesco Lithos King Surveying Other Direct Costs (ODCs) PECE B-81C1-AA4A595EDA8D Exhibit C Schedule DocuSign Envelope ID: 6AD54AE5-A82B-498B-81C1-AA4A595EDA8D 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 0 4 DWRF Digester Recirculation Pump Replacment Project July August September October November December January February March April B-81C1-AA4A595EDA8D