HomeMy WebLinkAboutCHANGE ORDER - RFP - 8286 CONSTRUCTION CONTRACTOR FOR PROJECTS AT THE WATER & WASTEWATER TREATMENT FACILITIES (3)CHANGE ORDER NO. 1 PROJECT TITLE: DWRF Digester Lid Coating CONTRACTOR: Hydro Construction Company, Inc. PO NUMBER: 9172227 VENDOR NUMBER: 109420 CHARGE NUMBER: 5036311015.563040.6 DESCRIPTION In preparing change orders show inorder as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time 1. Work completed within project budget 2. Savings realized due to decreased time of construction and materials used 3. ($16,864.73) 4. 0 days (Attach additional sheets as required) ORIGINAL CONTRACT COST $231,298.00 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER ($16,864.73) TOTAL % OF ORIGINAL CONTRACT, THIS CO: -7.86% TOTAL % OF ORIGINAL CONTRACT, ALL CO'S: -7.86% ADJUSTED CONTRACT COST $214,433.27 (Assuming all change orders approved) ACCEPTED BY: ___________________________________________ DATE: ________________ Stan Javernick, Hydro Construction REVIEWED BY: ___________________________________________ DATE: ________________ Lincoln Mueller, Project Manager APPROVED BY: ___________________________________________ DATE: ________________ Jason Graham, Water Reclamation and Biosolids Manager APPROVED BY: ___________________________________________ DATE: ________________ Owen Randall, Chief Engineer APPROVED BY: ___________________________________________ DATE: ________________ Carol Webb, Water Resources & Treatment Operations Manager CC: Purchasing NOTE: Signature of Contractor indicates Contractor Project File agreement herewithin, including any adjustment in contract sum or contract time. DocuSign Envelope ID: EDAF02AE-A66B-44EF-A9D6-0E3C67A87DA6 8/10/2017 8/10/2017 8/14/2017 8/14/2017 for Owen Randall 8/14/2017 Ph : (970) 225-2211 301 East Lincoln Avenue Fort Collins, CO 80524 Change Order Date: Project: Hydro Construction Co., Inc. 301 East Lincoln Avenue Fort Collins, CO 80524 17-01-439 DWRF - DIGESTER 614 LID COATIN Change Order: 1 07/10/17 To Contractor: FORT COLLINS, CO 80525 Architect's Project: 3036 ENVIRONMENTAL DRIVE The Contract is changed as follows: Project Savings 2 Project Savings $-16,864.73 NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACT AND OWNER. ENGINEER CONTRACTOR OWNER Hydro Construction Co., Inc. The date of Substantial Completion as of the date of this Change Order therefore is $231,298.00 $214,433.27 The original Contract Amount was Net change by previously authorized Change Orders The Contract Amount prior to this Change Order was The Contract will be increased by this Change Order in the amount of The new Contract Amount including this Change Order will be $0.00 $231,298.00 $-16,864.73 301 East Lincoln Avenue Fort Collins, CO 80524 (Signature) (Signature) Date Date Date By By By (Signature) Stan Javernick 7/10/2017 DocuSign Envelope ID: EDAF02AE-A66B-44EF-A9D6-0E3C67A87DA6