Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7515 CONSULTING ENGINEERING SERVICES FOR FUTURE WATER WW & SW FACILITIES CAPITAL IMPROVEMENTSRequisition Form Today's Date: August 4, 2017 Requisition No.: Ship To: Date Entered: Date Required: ASAP Date Approved: Special Instructions: Date Denied: Description Total Charge Number $30,690.00 5026410125.521210.3 -$30,690.00 5036410130.521210.3 Authorized By: ater & Wastewater Master Plan - Phase 2 Change rder #1 Unit Price $30,690.00 -$30,690.00 ater & Wastewater Master Plan - Phase 2 Change rder #1 -8D50-AF602F31E86F   To PO 9168396 0506 57425 8/15/17 mw Water & Wastewater Master Plan Phase 2 Contract Change Order 00950-1 SECTION 00950 CHANGE ORDER NO. PROJECT TITLE: Water and Wastewater Master Plan – Phase 2 CONTRACTOR: Ditesco, LLC PROJECT NUMBER: DESCRIPTION: 1. Reason for change: The manhole inspections were completed for less than original budget. Fire hydrant testing was decided to be completed by City crews saving the project $45,160. Given the savings, additional work items originally planned for Phase 3 were added to this scope. 2. Description of Change: Additional work items for Water Modeling, Decision Tool, Risk Assessment, GIS Mapping and Technical Memorand #2 were added to this scope. 3. Change in Contract Cost: $0 4. Change in Contract Time: March 31, 2018 Water Wastewater Total ORIGINAL CONTRACT COST $103,250 $564,854 $668,104 TOTAL APPROVED CHANGE ORDERS 0 0 0 TOTAL PENDING CHANGE ORDERS 0 0 0 TOTAL THIS CHANGE ORDER $30,690 -$30,690 0 THIS C.O. % OF ORIGINAL CONTRACT 29.7% -5.4% 0% TOTAL C.O.’S % OF ORIGINAL CONTRACT 29.7% -5.4% 0% ADJUSTED CONTRACT COST $133,940 $534,164 $668,104 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Representative ACCEPTED BY: DATE: Matt Fater, Project Manager REVIEWED BY: APPROVED BY: DATE: /LQVH\&KDOIDQW for Owen Randall, Chief Engineer DATE: Jon Haukaas, Water Eng. & Field Ops Manager APPROVED BY: NA DATE: Gerry S Paul, Director of Purchasing and Risk Management If over $60,000 cc: Project File Contractor Purchasing DocuSign Envelope ID: 93411894-1904-4982-8D50-AF602F31E86F                    %      "$)         ! " # $ ! WaterPlans Inc Proposed Scope for Waste Master Plan Support – Scope and Fee City of Fort Collins, CO Background The list of services presented in this document are proposed with the goal of supporting the current Water System Master Plan on evaluations, analysis and updates to the recently updated hydraulic model. The updated hydraulic model will be calibrated for fire flow conditions and used to evaluate the system for existing and future conditions, and assess the benefits of proposed improvements. Task 1. Existing System with Existing Demands WaterPlans’ staff will use field data collected a several hydrants to calibrate the hydraulic model. The water model was updated using the latest GIS database information. The model demands are representative of Maximum Day consumption. As part of an on-going effort, the model is being updated to include a Winter Day demand scenario. Both scenarios will be used to evaluate the capacity of the system to meet the required fire flow in all areas. Subtasks 1.1 Project Management/communications (4hr) 1.2 Hydraulic Model Calibration to Fire Flow - Hydraulic model calibration (current and Spring 2017 fire flow results) (40hr) - Calibration Documentation (fire flow and EPS) (16hr) 1.3 Existing System Hydraulic Analysis - Fire Flow Availability Evaluation – City Wide (8hr) - Water age evaluation (Winter and Summer) – City Wide (8hr) 1.4 Meetings (4hrs) Deliverables Technical memorandum summarizing assumptions, methodology and results, fire flow availability map, and a list of existing system deficiencies. Assumptions - Demands in model will not be updated as part of this task. - Model C factors will be revised as part of this task. - At least one (1) meeting in person are assumed for this task. Exhibit A DocuSign Envelope ID: 93411894-1904-4982-8D50-AF602F31E86F Task 2. Proposed Improvements (Replacements, Upsizing, Looping) with Existing Demands The hydraulic model will be updated to represent short-term improvements, to test their impact during fire flow and peak hour conditions. 2.1 Project Management and communications (4hr) 2.2 Hydraulic Model Update - Update evaluation model with proposed improvements (8hr) 2.3 System with Improvements - Hydraulic Analysis - Fire Flow Availability Evaluation – City Wide (8hr) - Peak hour hydraulic evaluation – City Wide (8hr) - Water age evaluation(Winter and Summer) – City Wide (8hr) - Specialty Scenarios: certain buildings, multi-fire scenario, tanks draw down (16hr) 2.4 Meetings (4hr) Deliverables Fire flow availability map after improvements. Assumptions - Demands in model will not be updated as part of this task. - At least one (1) meeting in person are assumed for this task. Task 3. Existing System with Redevelopment Demands Redevelopment analysis will be performed on the updated model (after Task 2), assuming the proposed short-term projects were implemented. The demands in the model will be modified to represent the consumption characteristics of the new customers. 3.1 Project Management and communications (4hr) 3.2 Redevelopment Analysis - Redevelopment project analysis (locations to be provided by Ditesco), update demand in model, check fire flow availability and adequacy of the connecting pipes for up to 20 locations – (30hr) 3.2 Meetings (4hr) Deliverables Technical memorandum summarizing assumptions, methodology and results, fire flow availability map, and a list of existing system deficiencies. Assumptions - Location and expected demand for redevelopment projects will be provided by Ditesco. Up to 20 locations were assumed for this task. - At least one (1) meeting in person are assumed for this task. Exhibit A DocuSign Envelope ID: 93411894-1904-4982-8D50-AF602F31E86F Task 4. Additional Proposed Improvements for System with Redevelopment Demands As part of the Water Master Plan, future projects will be developed and recommended. The impact of these projects will be evaluated in the hydraulic model. 4.1 Project Management (4hr) 4.2 CIP Modeling - Future scenarios in hydraulic model (scenario set up and add proposed projects) (16hr) - CIP adequacy run and analysis (16hr) - Water Age evaluation after improvements – City Wide (8hr) - Fire Flow Availability Evaluation after improvements – City Wide (8hr) 4.3 Meetings (4hr) 4.3 Support for final Master Plan Documentation (16hr) Deliverables Updated model with evaluation scenarios. Support for Ditesco’s documentation, short technical memorandum, tables and figures (16hr) Assumptions - Demands in model will not be modified as part of this task. - Location and size of proposed projects will be provided by Ditesco. - At least one (1) meeting in person are assumed for this task. Task 5. General On-call An on-call task is being set up allowing the City to request work products and support on an as-needed basis. On-call support may include but is not limited to; support for general modeling procedures, operations questions, what-if scenarios, and model maintenance. 5.1 General hydraulic modeling support – up to 40hr Total Fee WaterPlans’ staff (Kedric Szana, Marcela Durán) will perform this work on a time and labor basis with a total not to exceed amount of $40,600. Traveling time and expenses will be assumed by WaterPlans. Exhibit A DocuSign Envelope ID: 93411894-1904-4982-8D50-AF602F31E86F WaterPlans Inc Proposed Scope for Wastewater Modeling Support – Scope and Fee City of Fort Collins, CO Task Description Kedric Szana Marcela Du $140/hr $140/h Task 1 Existing System with Existing Demands 42 42 1.1 Project Management and communications 4 1.2 Hydraulic Model Calibration to Fire Flow 30 26 1.3 Existing System Hydraulic Analysis 8 8 1.4 Meetings 4 4 Task 2 Proposed Improvements (Replacements, Upsizing, Looping) with Existing Demands 30 26 2.1 Project Management and communications 4 2.2 Hydraulic Model Update 8 2.3 System with Improvements 20 20 2.4 Meetings 2 2 Task 3 Existing System with Redevelopment Demands 32 6 3.1 Project Management and communications 4 3.2 Redevelopment Analysis 30 0 3.3 Meetings 2 2 Task 4 Additional Proposed Improvements for System with Redevelopment Demands 20 52 4.1 Project Management and communications 4 4.2 CIP Modeling 18 30 4.3 Meetings 2 2 4.4 Support for final Master Plan Documentation 16 Task 5 General On-call 20 20 5.1 General hydraulic modeling support 20 20 Total 144 146 DocuSign Envelope ID: 93411894-1904-4982-8D50-AF602F31E86F                           !  "  " # $% & ’"(    !  &$   ""  &)  * +, +, "--  $).  "" "" +/,/ %  **0/ - - ""   !  !  -8D50-AF602F31E86F  " !   % &  ’ & (’  )   *++  *,   - . / . / . / . / . / 0 0 0 012 022               !   %           &           )! + %      !    ,   )           , . !         ,! .           # .   !       ,     . !  !       , .  !     ,   0   67 *   *  . ) , ) !   ,   ,  -     ! + ’    ’ 4 34 56’  ’ 7 -  875  &  -8D50-AF602F31E86F *) ’  - $ ) % 1*  **$  $) .<2"2 + 0)    ** D )*D   * 0-*1+ E  F) )<%$1 $ 1   *  %+1)*1 %  0$ % 1     1  1 0++)$)$ +)1 *      $)  ) 1+)1 *    ’ 0% $ %  - $ + ) 0  * *  $ +   $ -1*  * +) - $    $ 1 $+ - $ + $$)$)1 **  %  + 1*  ’0  ’*   $ ’+  +   %       $ *     )) -     () 1 $1($1 )  %   1*) ’  *$  $11 % ) 11 $1) $ +1 1 $ ’    %   $    1  1   () (   $)** 1$!  1 1  +1  $**    ** 0%) 1 *    @9..$**@9. $** $)$))  ) -  $1*- $** )0)1 **   0 $*  $) *)    $0  $0+1     $** $)$))  5*)  $1*1 +)*$0+1 *  $ $**<%  ++  5** * 0  11  )$ )1 )$)$) *)         G "- 0  $ 1(  (=+$1 )1*) 3    4’1 *  + 3@9. )4      () )$+)1 * *1  $)      ()++  !1  $)    DocuSign Envelope ID: 93411894-1904-4982-8D50-AF602F31E86F  % *) ’’+          )  *) ’$ 1   %?   )  1*  5  + $$’01  %    % 1 * % +)1 **  %  *) %*)  )$))@9. % 1      ))<%A  1 $ $* 0))    1 )  $) ()  $$1  1  %  +- $  1  +    ()1 1 %       5*) $ ) -  1-  +$)   1 %0 %     >B5 .% 1 )B5 "1      $ +   )%   0 ))% $1() 1  *-$ %$* $ )  @9.  0 +1 ()11   *  - + 51$1" % $1*2 * + !++’)1 0$* $  " %1   C)    0$ - $ ) * %+) % 1 1)6$++      o  0 ) 1$ .*++ 3)% 4   o 15  % 1)% $ +1)  0  o * +  ) 11 $1 o $* 1   >* 91*-1     11**  % 11*-1   )% $ $  -$ ( () 1 * ++  * )$    $ * %   $+  ’    *+1    - $   >B- $  )-*1   -*1  %   0*+1)$* 13 +( 4’ $1) **  )!1*  1*1()1  )1 01+ * ) $1*)    +) $ 1 +  6$ % 0-+  o * +  ) 11 $1 )  1 *    >* 91*-10 -*1"1    $$1*-1  0*-0 -*11    ()  0 *+1 +$$ 1   ++  -  0% 0- $   o * +  0+) 11 $1   1)1  %  ’  ) - $  +)*   +)     % 1   )  1$!  1 1  - $  +- $    +  *%+) 0  * ** + 0) % 1 () 1 $ $!!- 1394 $  $)   $1  +*  0  0 !- $+1$   DocuSign Envelope ID: 93411894-1904-4982-8D50-AF602F31E86F                               !  "    #$%&’    ()*$* +) )  )  ) ,    ))-       .*+.- / $   - ) -0*+11++% ++% $ ) $$0$2  $)’) )   ) ,   ) )   3   )4() )   5 ) 1  +) ) , 0* )    * )1 $ +)1 * )$) )+ 6$ +7    () )  - $()   1$+8 7’&1  $)   !"!  #   $#%     )9 **  87:’, 8,’&, 8 ’:&  - ;< $   "   8& ’  8’,: 8&’  , (  3!&4 8 8&’  38&’ 4 , "   8 8’: 38’:4 ,  2  1 8 8’ 38’4 ,  **2 %   8 8,’7 38,’74 , () 11 $1= 8 8’ 38’4 <)  8  "&  () 1 1+ *-0   "&’&&(    )%%  <1*" ) >   !  %’  ),’7    DocuSign Envelope ID: 93411894-1904-4982-8D50-AF602F31E86F