Loading...
HomeMy WebLinkAbout109420 HYDRO CONSTRUCTION CO INC - CONTRACT - RFP - 8286 CONSTRUCTION CONTRACTOR FOR PROJECTS AT THE W (17)CONTRACT DOCUMENTS FOR WTF Replacement Project – High Priority Horsetooth Dissipator Building Electrical The work is located at the City of Fort Collins Water Treatment Facility (WTF), Fort Collins, Colorado. The project involves design assistance and work with plant staff on investigation to determine final configuration of electrical equipment associated with the replacement of the existing panels in the Horsetooth Dissipator Building, particularly MCC 154, motor control center. Based on final design procure identified materials and equipment, including long lead, critical path materials. Once materials and equipment are received, provide labor and miscellaneous electrical materials associated with the replacement of the existing panels (including patch and repainting of areas) in the Horsetooth Dissipator Building. Work is estimated to begin September 2017. The substantial completion date of the project is May 1, 2018. August 2017 ch2m 200 East 7th Street, Suite 314, Loveland CO 80537 ch2m Fort Collins Utilities 700 Wood Street Fort Collins CO 80521 Hydro Construction Company, Inc. 301 East Lincoln Avenue Fort Collins CO 80524 DocuSign Envelope ID: 1802119D-615F-4E22-B875-0FFB3EC389BC WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Hydro Construction Company, Inc. DATED: June 20, 2016 Work Order Number: SCP-WTF-HTDB-080517 Purchase Order Number: Project Title: WTF Replacement Project – High Priority Horsetooth Dissipator Electrical Original Bid/RFP Number & Name: RFP # 8286, Construction Contractor for Projects at the Water & Wastewater Treatment Facilities (BU 5026310064.535010.6) Commencement Date: August 21, 2017 Completion Date: May 1, 2018 Maximum Fee: (time and reimbursable direct costs): $97,688 Project Description: Contractor to provide design, investigative, procurement, and installation services pertaining to the motor control center in the Horsetooth Dissipator Building at the WTF Scope of Services: Services shall include design and construction of electrical materials and equipment associated with the MCC 154 in the Horsetooth Dissipator Building at the WTF, as presented in the attached scope of work and cost estimate from Hydro. Contractor agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Construction Work Order Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Construction Work Order Agreement and this work order (including the attached forms) the Construction Work Order Agreement shall control. Notice to Proceed is hereby given upon receipt of a fully executed Work Order. CONTRACTOR By:_______________________________ Date:_____________________________ CITY OF FORT COLLINS Submitted By: _________________________ Special Projects Manager Date: _________________________ Reviewed by: _________________________ Chief Engineer Date: _________________________ Approved by: _________________________ Water Production Manager Date: ________________________ Approved by: _________________________ WR&T Manager Date: ________________________ Reviewed by: _________________________ Purchasing Director Date: ________________________ DocuSign Envelope ID: 1802119D-615F-4E22-B875-0FFB3EC389BC       DocuSign Envelope ID: 1802119D-615F-4E22-B875-0FFB3EC389BC City of Fort Collins Water Treatment Plant – High Priority Equipment 7-21-17 Horsetooth Dissipator Buildinig Hydro Construction Company, Inc. - Scope of Services Provide design assistance and work with plant staff on investigative effort to determine final configuration of electrical equipment associated with the replacement of the existing MCC in the Horsetooth Dissipator Building. Based on final design, procure long lead, critical path materials. Once received, provide labor and miscellaneous electrical materials associated with the replacement of the existing MCC (including patch and repainting of areas) in the dissipater area. More specifically; MCC 154 a) Procure and install (1) three section, 600A, 480V, 3 wire, 42KASC MCC to replace the existing MCC. The new MCC will be mounted in the same location as the existing MCC. b) Match the existing panel and transformer, 154 LP14 and LVT 154 LP14, located in MCC 154. c) Reroute the existing power feeder into the new MCC. We anticipate that the existing wire is long enough to re-use. d) Reroute the branch motor wiring into the new MCC. We anticipate that the existing wire is long enough to re-use. e) A shutdown of the MCC will need to be coordinated with the City of Fort Collins in- order to swap the MCC’s. f) We have included 10 hours of startup assistance for the new MCC. g) Temporary generator power will be provided during the shutdown. h) We can begin investigative work on this panel as soon as work order is issued with critical path submittals to follow. i) This gear will arrive approximately 12 weeks after submittals are approved. Cost estimate as shown on the attached, $97,688. DocuSign Envelope ID: 1802119D-615F-4E22-B875-0FFB3EC389BC Standard Estimate Report FCWTF HP MCC 154 Elec Project name FCWTF HP MCC 154 Elec Labor rate table Labor - Bare Equipment rate table Equipment Report format Sorted by 'Structure/Group phase' 'Detail' summary Allocate addons DocuSign Envelope ID: 1802119D-615F-4E22-B875-0FFB3EC389BC Standard Estimate Report FCWTF HP MCC 154 Elec Item Description Takeoff Qty Labor Amount Material Amount Subcontract Amount Name Equ * unassigned * 1000.000 GENERAL CONDITIONS 20 Bonds 1.00 ls - - 14 Project Manager 6.00 wk 2,130 - - 14 Project Foreman 6.00 wk 1,704 - - 18 Telephone Charges 1.50 mo - - 20 Temporary Toilets 1.50 mo - - 14 Safety 1.00 ls 213 - - 16 Misc. Tools 1.00 ls - - - GENERAL CONDITIONS 4,047 480.00 Labor hours 480.00 Equipment hours 9000.000 FINISHES 10 Drywall Repair 1.00 ea 568 27 - 10 Anchor Removal and Floor Patch 1.00 ea 426 16 FINISHES 994 43 16000.000 ELECTRICAL -sub Electrical Sub - MCC 154 1.00 ls - - 78,702 ELECTRICAL 78,702 * unassigned * 5,041 43 78,702 480.00 Labor hours 480.00 Equipment hours Estimate Totals Description Amount Totals Hours Rate Cost Basis Cost per Unit Percen Labor 5,041 480.000 hrs Material 43 Subcontract 78,702 Equipment 2,325 480.000 hrs Other 1,896 88,007 88,007 Profit & Overhead 9,681 11.000 % T 9,681 97,688 Total 97,688 DocuSign Envelope ID: 1802119D-615F-4E22-B875-0FFB3EC389BC