Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7575 CONSULTING ENGINEERING SERVICES FOR WATER TREATMENT FACILITY DESIGN & CONSTRUCTION SERVICES (10)PAGE 1 OF 6 EXHIBIT "A" WORK ORDER FORM PURSUANT TO AGREEMENT No. 7575 (AGREEMENT) BETWEEN THE CITY OF FORT COLLINS AND CH2M HILL Engineers, Inc. Per RFP #7575 Consulting Engineering Services for WTF Design and Construction Services DATED: February 24, 2014 Work Order Number: CH-2017-ASR Purchase Order Number: _________________________________________________________ Project Title: Aquifer Storage and Recovery (ASR) Assessment Report Review Commencement Date: June 5, 2017 Completion Date: August 1, 2017 Maximum Fee: (time and reimbursable direct costs): $ 15,670 refer to Exhibit C – Compensation Project Description: Professional Engineering Services for review of the ASR Assessment Report Scope of Services: Refer to Exhibit B – Scope of Services Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of Exhibits B and C are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional: CH2M HILL Engineers, Inc. By: ___________________________________ Date: _________________________________ City of Fort Collins: Submitted By: ___________________________ Project Manager Date: ___________________________ Reviewed by: ___________________________ Water Production Manager Date: ___________________________ Approved by: ___________________________ %X\HU Date: ___________________________ Approved by: ___________________________ WR&T Manager Date: ___________________________ Approved by: ___________________________ Director of Purchasing & Risk Management (if over $60,000.) Date: ___________________________ DocuSign Envelope ID: A226D87B-45D6-4A75-B9AC-B06431E979C8       PAGE 2 OF 6 Exhibit B - Scope of Services Exhibit B to the AGREEMENT between the City of Fort Collins, Colorado, a Municipal Corporation, hereinafter referred to as the City, and CH2M HILL Engineers, Inc., hereinafter referred to as the Professional, for a project generally described as: Professional Engineering Services for the Aquifer Storage and Recovery (ASR) Assessment Report Review. The Professional’s services for the project are detailed hereinafter. Project Objective: To provide independent review of the Assessment of Fort Collins Aquifer Storage and Recovery (ASR) Opportunities Report dated April 19, 2017, and advise the City on the feasibility of the project. The ASR project is proposed to provide additional water supply, increase drought resiliency, and provide emergency treated water storage. It is understood the City will designate Mr. Adam Jokerst and Mark Kempton as the City Project Managers (PMs) and primary points of contact with respect to the work performed under this AGREEMENT, with authority to transmit instructions, receive information, and interpret and define City policies and decisions relative to elements pertinent to the work covered by this AGREEMENT. Task 1.1 – Review Aquifer Storage and Recovery (ASR) Report Professional will review the Assessment of Fort Collins Aquifer Storage and Recovery Opportunities Report (ASR Report), Prepared by Courtney Hemenway P.E. / HGE, Tom Sale PhD P.G. / Colorado State University dated April 19, 2017. Professional’s Ground Water Engineer and Project Manager will review the report. The review will consider the groundwater geology, as well as the interface with the City’s water treatment and distribution systems, as presented in the ASR Report, and will focus on the adequacy of the analyses and reasonableness of the results and conclusions. The Professional will engage the support of Senior water resources and groundwater hydrogeologists familiar with ASR design and operation to assist the review team as necessary. Professional will leverage lessons learned from local and regional ASR projects. Deliverables: x Initial list of review comments and questions. A standard CH2M quality review form or equivalent will be used to document comments and questions. Task 1.2 Project Meeting Professional will meet with the City’s PMs and Staff to discuss the initial list of comments on the ASR Report and clarify questions resulting from the review. It is assumed that the meeting will be at the City’s Water Treatment Facility or Service Center. The Professionals Project Manager and Groundwater Engineer will attend. Professional’s Senior Technical Consultant will attend by phone conference. Deliverables: x x Meeting Meeting Agenda Summary DocuSign Envelope ID: A226D87B-45D6-4A75-B9AC-B06431E979C8 PAGE 3 OF 6 Task 1.3 Technical Memorandum Professional will prepare a brief technical memorandum (TM) to document the review findings and provide an opinion of the adequacy of the analyses and reasonableness of the results and conclusions. x x x x x x x x Hydrogeological Water Regulatory Pilot Data Cost Integration Recommended Specifically, opinion, Plan gaps quality approach, and framework, with compatibility, recommendations next the treatment considerations, TM steps will and comment distribution for further on: system, study, A draft TM will be issued for the City’s review. Professional will finalize the TM within one week after receipt of the City’s comments. If necessary, a phone conference call will be conducted to discuss the City’s comment prior to finalizing the TM. Deliverables: x x Draft Final TM TM – – ASR ASR Assessment Assessment Review Review Task 1.4 Project Management Professional’s Project Manager (PM) shall prepare, implement, monitor, and update the project execution plan throughout the project. Professional’s PM will prepare and submit to the City’s PM, on a monthly basis, a brief cost and schedule status report. The report will include a narrative description of progress to-date, actual costs for each Task, estimates of percent complete, and potential cost variances. Deliverables: x Monthly project cost and schedule status reports and Invoices. Schedule The professional will work expeditiously to support the City’s schedule. An anticipated schedule is shown below in Table 1. Table 1, Project Schedule Activity Anticipated Milestone Dates Notice To Proceed June 5, 2017 ASR Report Review June 5, 2017 through June 8 Project Meeting June 12, 2017 Issue Draft TM June 15 City Review June 19-22 Issue Final TM June 30, 2017 DocuSign Envelope ID: A226D87B-45D6-4A75-B9AC-B06431E979C8 PAGE 4 OF 6 Assumptions Used in Developing this Scope of Services This proposal is based on the following assumptions: 1. Professional’s review will be limited to the information presented in the ASR Report. No additional research or data collection will be performed. 2. Calculations and cost presented in ASR Report will be reviewed for reasonableness and will not generally be duplicated by the Professional. 3. City will examine information submitted by Professional and render in writing or otherwise decisions within one week. 4. City will give prompt notice to Professional whenever City observes or becomes aware of any development that affects the scope or timing of Professional’s services, or of any defect in the work of Professional. 5. Professional will provide the City with deliverables as defined respectively in this scope of work. 6. All deliverables will be distributed electronically via email (pdf format). 7. Meetings with the City will be held at the City’s service center office or water treatment facility. 8. In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the project, Professional has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by operating personnel or third parties; and other economic and operational factors that may materially affect the ultimate project cost or schedule. Therefore, Professional makes no warranty that City's actual project costs, financial aspects, economic feasibility, or schedules will not vary from Professional’s opinions, analyses, projections, or estimates. If City wishes greater assurance as to any element of project cost, feasibility, or schedule, City will employ an independent cost estimator, contractor, or other appropriate advisor. 9. All intellectual property contained in the elements used to construct the Professional’s Parametric Design and Cost Estimating System (CPES) models will remain property of Professional. No access to the structure and code behind these elements will be provided. DocuSign Envelope ID: A226D87B-45D6-4A75-B9AC-B06431E979C8 PAGE 5 OF 6 Exhibit C – Compensation DocuSign Envelope ID: A226D87B-45D6-4A75-B9AC-B06431E979C8 PAGE 6 OF 6 Compensation Schedule Lindsay Atkinson Groundwater Engineer Al Paquet Principal Project Manager Mark Lucas Water Resource Engineer James Dwyer Water Resource Eng. Gretchen Sage Contracts Administration/Accounting Labor Hours Labor Per Diem Code/Classification 05 03 04 03 05 19 2017 Labor Rates $185 $235 $205 $235 $185 $90 Task 1 Aquifer Storage and Recovery (ASR) Assistance 1.1 Review Aquifer Storage and Recovery (ASR) Report 8 5 4 8 0 0 25 $5,355 1.2 Meeting - Review Comments to Report 6 4 2 4 0 0 16 $3,400 1.3 Prepare Technical Memorandum 8 8 2 8 26 $5,650 1.4 Project Management 0 2 1 4 7 $1,015 Total 22 19 8 20 1 4 74 $15,420 DocuSign Envelope ID: A226D87B-45D6-4A75-B9AC-B06431E979C8 Requisition Form Today's Date: June 2, 2017 Requisition No.: Ship To: Date Entered: Vendor #: Date Approved: 537 Special Instructions: Date Denied: Description Unit Price Total Charge Number $15,670.00 $7,835.00 5020850302.521210.1 $15,670.00 $7,835.00 502.232201.529999 Authorized By: Jason Graham (for Carol Webb) pton Aquifer Stoarge and Recovery (ASR) Assessment Report Review Suite 314 Aquifer Stoarge and Recovery (ASR) Assessment Report Review erst 5-B9AC-B06431E979C8    102541 57352 8/7/17 mw