Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 8475 CIVIL ENGINEERING PROFESSIONAL ON-CALLPAGE 1 OF 7 EXHIBIT "A" WORK ORDER FORM PURSUANT TO AGREEMENT No. 7575 (AGREEMENT) BETWEEN THE CITY OF FORT COLLINS AND CH2M HILL Engineers, Inc. Per RFP #7575 Consulting Engineering Services for WTF Design and Construction Services DATED: February 24, 2014 Work Order Number: SCP-WTFHSPS-080517 Purchase Order Number: _________________________________________________________ Project Title: WTF Replacement Projects – High Service Pump Station Electrical Commencement Date: August 21, 2017 Completion Date: May 1, 2018 Maximum Fee: (time and reimbursable direct costs): $ 43,364 refer to Exhibit C – Compensation Project Description: Professional Engineering Services for WTF Replacement Project – High Service Pump Station Electrical (BU 5026310066.521130.6) Scope of Services: Refer to Exhibit B – Scope of Services Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of Exhibits B and C are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional: CH2M HILL Engineers, Inc. By: ___________________________________ Date: _________________________________ City of Fort Collins: Submitted By: ___________________________ Special Projects Manager Date: ___________________________ Reviewed by: ___________________________ Water Production Manager Date: ___________________________ Approved by: ___________________________ Chief Engineer Date: ___________________________ Approved by: ___________________________ WR&T Manager Date: ___________________________ Approved by: ___________________________ Purchasing Director Date: ___________________________ DocuSign Envelope ID: 41256B38-01F4-47E8-883F-AAD4C5B2D6B0       PAGE 2 OF 7 Exhibit B - Scope of Services Exhibit B to the AGREEMENT between the City of Fort Collins, Colorado, a Municipal Corporation, hereinafter referred to as the City, and CH2M HILL Engineers, Inc., hereinafter referred to as the Professional, for a project generally described as: Professional Engineering Services for WTF Capital Projects –High Service Pump Station Electrical Replacement Project The Professional’s services for the project are detailed hereinafter. Project Objective: To provide support to the City for various electrical capital improvements Projects for the High Service Pump Station at the Water Treatment Facility (WTF). It is understood the City will designate Ms. Sue Paquette as the City Project Manager (PM) and primary point of contact with respect to the work performed under this AGREEMENT, with authority to transmit instructions, receive information, and interpret and define City policies and decisions relative to elements pertinent to the work covered by this AGREEMENT. The Professional’s Electrical, Instrumentation and Control’s Consultant Carollo Engineers (Consultant) will perform the following scope of work. Professional will manage the Consultant during the project execution. Professional’s Project Manager (PM) shall prepare, implement, monitor, and update the project execution plan throughout the project. Professional’s PM will prepare and submit to the City’s PM, on a monthly basis, a brief cost and schedule status report. The report will include a narrative description of progress to-date, actual costs for each Task, estimates of percent complete, and potential cost variances. The Professional’s management, deliverable review, and coordination efforts are included in each of the tasks. TASK 1 – REPLACING EXISTING HIGH SERVICE PUMP STATION MOTOR CONTROL CENTER (MCC191) AND ADDING AN AUTOMATIC TRANSFER SWITCH The Consultant will provide Electrical, Instrumentation and Control’s (EI&C) engineering services during design and construction for the replacement of MCC191. The project will include: • Replacing existing MCC line-up. Starters will be replaced in kind with RVSS type starters per the City direction. • Installing automatic transfer switch with existing generator. • Assist Owner with automatic and manual load shed requirements for finished water pump starting to handle added voltage drop of building loads. The Consultant will provide the Alternate Product Delivery System Contractor (Contractor) with design drawings and specifications. The Consultant will provide two deliverables including: • Review Submittal for City and Contractor review. • Final Submittal incorporating the review comments from the Review Submittal. o Deliverables: § Review Submittal - Electronic PDF containing specifications § Final Submittal Electronic PDF containing specifications DocuSign Envelope ID: 41256B38-01F4-47E8-883F-AAD4C5B2D6B0 PAGE 3 OF 7 The Consultant will provide engineering services during construction including: • Responses to Contractor Requests for Information (RFI) during construction: o The Consultant will respond to Contractor’s Request for Information (RFI) on the Contract Documents. § Deliverables: Written responses to submitted RFIs. § Assumptions: The budget is based on an estimated six (6) RFIs at an average of two hours each. • Shop drawing submittal review: The Consultant shall receive, log, review, comment on, and return shop drawings, submittals, and samples provided by the Contractor. The purpose of reviewing submittals by the Consultant is to determine if the equipment and materials proposed by the Contractor will meet the design intent of the Project and the requirements stipulated in the Contract documents. o Deliverables: Written responses to Contractor submittals. o Assumptions: It is estimated that approximately ten (10) submittals and equipment operations and maintenance manuals will be submitted by the Contractor. It is estimated that approximately 50% of the submittals will require re-submittal. The scope and budget assumes four (4) hours review time for ten (10) submittals and one hour review time for five (5) re-submittals. • Assistance with issuing Work Change Directives (WCD) and review of Contractor Change Order Requests: o The Consultant will assist with Work Change Directives (WCD) for which a change order is not issued. WCD shall be checked for general compliance with the intent of the design. o In the event changes to the Contract Documents are required, the Consultant will assist in the review of Change Order Requests (COR) and preparation of Change Order (CO). Consultant, at the request of the City, will either review the COR prepared by the City, or when COR requires redesign, prepare detailed CO specifications, drawings, and/or sketches. § Deliverables: • Written responses to Contractor Change Order Requests • Written review of City Work Change Directives • Written review of City Change Orders o Assumptions: The budget is based on an estimated three (3) COR/WCD/CO at an average of four (4) hours each. • Attendance at Meetings and Site Inspections: o The Consultant will participate in certain project meetings as required in order to keep abreast of construction activities and be involved in questions which may arise concerning construction progress. During construction site visits, the Consultant will walk the job site with the City and Contractor to observe construction progress and discuss relevant construction issues. DocuSign Envelope ID: 41256B38-01F4-47E8-883F-AAD4C5B2D6B0 PAGE 4 OF 7 o The Consultant will conduct site inspections throughout the project to review the construction progress, assess general conformance with the Contract Documents, and discuss relevant construction issues. Dedicated inspections will be conducted as stated in the assumptions. § Deliverables: • Site inspection summary memorandums • Final Punch List o Assumptions: § The budget is based on physical attendance at four (4) construction progress meetings at approximately four (4) hours each. § Consultant will visit the site for benchmark site inspections, punch listing, and startup services as required. The budget is based on the following site inspections at approximately four (4) hours per visit, including summary memorandum to document the site inspection. • Electrical, Instrumentation, and Control Inspection: Quantity Two (2) • Preliminary Punch List Inspection: Quantity One (1) • Final Punch List Inspection: Quantity One (1) • Record Documents and Project Closeout: o The Consultant will incorporate Contractor's field markups at the end of construction and translate into record drawings. o Deliverables: § The electronic files of construction record documents (AutoCAD and PDF format) o Assumptions: The Scope of Services and budget includes twelve (12) drawings that will need to be modified at one half hour of CADD time per drawing, and one hour of engineering time per drawing. ADDITIONAL ITEMS NOT INCLUDED The following items are not included in the Scope of Services § Printing or reproduction § Work effort for other items not specifically listed in this proposal Assumptions Used in Developing this Scope of Services The Professional’s estimate of engineering costs for the project is based on the elements included in task descriptions above, and the following assumptions: DocuSign Envelope ID: 41256B38-01F4-47E8-883F-AAD4C5B2D6B0 PAGE 5 OF 7 1. Scope of work is being performed entirely by Consultant and Professional assumes no responsibility or liability for the work performed. Professional is only administering compensation to Consultant for performance of the work under the on- call contract. 2. City will examine information submitted by Professional /Consultant and render in writing or otherwise provide decisions within two weeks. 3. City will give prompt notice to Professional whenever City observes or becomes aware of any development that affects the scope or timing of Professional’s services, or of any defect in the work of Professional. 4. Professional will provide the City with deliverables as defined respectively in this scope of work. 5. All deliverables will be distributed electronically via email (pdf format). 6. Meetings with the City will be held at the City’s service center office or water treatment facility. 7. Construction improvements will be performed the City’s Alternative Product Delivery Contractor (APDS Contractor). 8. APDS Contractor will provide conceptual construction cost estimates to assist with evaluations of alternatives when applicable. Final pricing construction work of will be performed by APDS Contractor with review from Independent Cost Estimator in accordance with established City APDS procedures. 9. In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the project, Professional has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by operating personnel or third parties; and other economic and operational factors that may materially affect the ultimate project cost or schedule. Therefore, Professional makes no warranty that City's actual project costs, financial aspects, economic feasibility, or schedules will not vary from Professional’s opinions, analyses, projections, or estimates. If City wishes greater assurance as to any element of project cost, feasibility, or schedule, City will employ an independent cost estimator, contractor, or other appropriate advisor. 10. City will verify that the required permits, bonds and insurance have been obtained and submitted by the General Contractors. 11. Professional is not responsible for health or safety precautions of construction workers. Professional is not responsible for the Contractor’s compliance with the health and safety requirements in the contract for construction, or with federal, state, and local occupational safety and health laws and regulations. 12. Record drawings will be prepared on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the Project was finally constructed. Professional is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. 13. Carollo’s fee schedule for their engineering support expenses below in Exhibit C, per the PSA for on call services effective February 26, 2017 to February 25, 2018, are as shown below. DocuSign Envelope ID: 41256B38-01F4-47E8-883F-AAD4C5B2D6B0 PAGE 6 OF 7 DocuSign Envelope ID: 41256B38-01F4-47E8-883F-AAD4C5B2D6B0 PAGE 7 OF 7 Exhibit C – Compensation Exhibit C Compensation Schedule Al Paquet, Principal Project manager Brad Schutt, Project Engineer Gretchen Sage, Contracts Administration/ Accounting Labor Hours Labor Expense Total Cost Per Diem Code/Classification 03 05 04 19 2017 Labor Rates $235 $185 $205 $90 Task Electrical Imrovement Projects 1.0 Replacing Existing high service Pump Station Motor Control Center (MCC 191) and adding an Automatic Transfer Switch 10 4 2 8 24 $4,220 $39,144 $43,364 Subtotal Task 1 10 4 2 8 24 $4,220 $39,144 $43,364 DocuSign Envelope ID: 41256B38-01F4-47E8-883F-AAD4C5B2D6B0