HomeMy WebLinkAbout109420 HYDRO CONSTRUCTION CO INC - CONTRACT - RFP - 8286 CONSTRUCTION CONTRACTOR FOR PROJECTS AT THE W (15)CONTRACT DOCUMENTS FOR WTF Replacement Project – High Priority WTF Room 210 Electrical The work is located at the City of Fort Collins Water Treatment Facility (WTF), Fort Collins, Colorado. The project design assistance and work with plant staff on investigative effort to determine final configuration of electrical equipment associated with the replacement of the existing lighting panels and transformers. Once final design is reached procure long lead, critical path materials. Upon delivery, provide labor and miscellaneous electrical materials associated with the replacement of the existing lighting panels and transformers (including patch and repainting of areas) in Room 210. Work is estimated to begin September 2017. The substantial completion date of the project is May 1, 2018. August 2017 ch2m 200 East 7th Street, Suite 314, Loveland CO 80537 ch2m Fort Collins Utilities 700 Wood Street Fort Collins CO 80521 Hydro Construction Company, Inc. 301 East Lincoln Avenue Fort Collins CO 80524 DocuSign Envelope ID: F7806519-8AE9-4325-8E15-015E85B2B831 WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Hydro Construction Company, Inc. DATED: June 20, 2016 Work Order Number: SCP-WTFRm210-080517 Purchase Order Number: Project Title: WTF Replacement Project – High Priority Room 210 Electrical Original Bid/RFP Number & Name: RFP # 8286, Construction Contractor for Projects at the Water & Wastewater Treatment Facilities (BU 5026310064.535010.6) Commencement Date: August 21, 2017 Completion Date: May 1, 2018 Maximum Fee: (time and reimbursable direct costs): $73,970 Project Description: Contractor to provide design, investigative, procurement, and installation services pertaining to electrical equipment in Room 210 at the WTF Scope of Services: Services shall include design and construction of electrical materials and equipment associated with 157 LP 9, 157 LP 11, LVT 157 LP 9, and LVT 157 LP 11 in Room 210 at the WTF, as presented in the attached scope of work and cost estimate from Hydro. Contractor agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Construction Work Order Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Construction Work Order Agreement and this work order (including the attached forms) the Construction Work Order Agreement shall control. Notice to Proceed is hereby given upon receipt of a fully executed Work Order. CONTRACTOR By:_______________________________ Date:_____________________________ CITY OF FORT COLLINS Submitted By: _________________________ Special Projects Manager Date: _________________________ Reviewed by: _________________________ Chief Engineer Date: _________________________ Approved by: _________________________ Water Production Manager Date: ________________________ Approved by: _________________________ WR&T Manager Date: ________________________ Approved by: _________________________ Purchasing Director Date: ________________________ DocuSign Envelope ID: F7806519-8AE9-4325-8E15-015E85B2B831 8/7/2017 8/8/2017 8/8/2017 8/8/2017 8/8/2017 8/9/2017 DocuSign Envelope ID: F7806519-8AE9-4325-8E15-015E85B2B831 City of Fort Collins Water Treatment Plant – High Priority Equipment 7-21-17 Room 210 Hydro Construction Company, Inc. - Scope of Services Provide design assistance and work with plant staff on investigative effort to determine final configuration of electrical equipment associated with the replacement of the existing lighting panels and transformers. Once final design is reached procure long lead, critical path materials. Upon delivery, provide labor and miscellaneous electrical materials associated with the replacement of the existing lighting panels and transformers (including patch and repainting of areas) in Room 210. More specifically; 157 LP 9 a) Procure and install (1) 240/120V, 50A, 10 KASC panel with an internal SPD to replace the existing lighting panel. b) Reconnect the existing power feeder from 157 LP11 into the new panel. We anticipate that the existing wire is long enough to re-use. c) Reconnect the branch wiring into the new panel. We anticipate that the existing wire is long enough to re-use. d) Temporary generator power will be provided to support any critical loads in this panel. e) The 480 volt panel will be de-energized for approximately 1 day. f) Construction of divider wall as outlined on 7/17/17. g) Will work with plant staff to confirm the information listed on the panel’s schedules and trace out circuits that are not identified. We can begin investigative work on this panel as as soon as work order is issued with critical path submittals to follow. h) This gear will arrive approximately 10 weeks after submittals are approved. 157 LP 11 a) Procure and install (1) 208/120V, 150A, 10 KASC panel with an internal SPD to replace the existing lighting panel. b) Reconnect the existing power feeder into the new panel. We anticipate that the existing wire is long enough to re-use. c) Reconnect the branch wiring into the new panel. We anticipate that the existing wire is long enough to re-use. d) Temporary power is not assumed for any of the circuits in this panel. e) The 480 volt panel will be de-energized for approximately 1 day. f) Will work with plant staff to confirm the information listed on the panel’s schedules and trace out circuits that are not identified. We can begin investigative work on this panel as soon as soon as work order is issued with critical path submittals to follow. g) This gear will arrive approximately 10 weeks after submittals are approved. LVT 157 LP9 a) Procure and install (1) 45KVA, 3 Phase dry-type transformer. DocuSign Envelope ID: F7806519-8AE9-4325-8E15-015E85B2B831 b) Reconnect the existing power feeder into the new transformer from DDP157. We anticipate that the existing wire is long enough to re-use. c) Reconnect the feeds to panels 157LP11. We anticipate that the existing wire is long enough to re-use. d) In the initial investigation, Interstates was unable to locate LVT 157 LP11. We assume it is located in the ceiling near the panels. e) The 480 dry-type transformer will be de-energized for approximately 1 day. f) Will work with plant staff to confirm the information listed on the panel’s schedules and trace out circuits that are not identified. We can begin investigative work on this panel as soon as work order is issued with critical path submittals to follow. g) This gear will arrive approximately 10 weeks after submittals are approved. LVT 157 LP11 a) Procure and install (1) 45KVA, 3 Phase dry-type transformer. b) Reconnect the existing power feeder into the new transformer from DDP157. We anticipate that the existing wire is long enough to re-use. c) Reconnect the feeds to panels 157LP11. We anticipate that the existing wire is long enough to re-use. d) In the initial investigation, Interstates was unable to locate LVT 157 LP11. We assume it is located in the ceiling near the panels. e) The 480 dry-type transformer will be de-energized for approximately 1 day. f) Will work with plant staff to confirm the information listed on the panel’s schedules and trace out circuits that are not identified. We can begin investigative work on this panel as soon as work order is issued with critical path submittals to follow. g) This gear will arrive approximately 10 weeks after submittals are approved. Cost estimate as shown on the attached, $73,970. DocuSign Envelope ID: F7806519-8AE9-4325-8E15-015E85B2B831 Standard Estimate Report Page 1 FCWTF HP RM 210 Elec 7/21/2017 11:59 AM Project name FCWTF HP RM 210 Elec Labor rate table Labor - Bare Equipment rate table Equipment Report format Sorted by 'Structure/Group phase' 'Detail' summary Allocate addons DocuSign Envelope ID: F7806519-8AE9-4325-8E15-015E85B2B831 Standard Estimate Report Page 2 FCWTF HP RM 210 Elec 7/21/2017 11:59 AM Item Description Takeoff Qty Labor Amount Material Amount Subcontract Amount Name Equipment Amount Other Amount Total Amount * unassigned * 1000.000 GENERAL CONDITIONS 20 Bonds 1.00 ls - - - 1,148 1,148 14 Project Manager 4.00 wk 1,420 - - 400 - 1,820 14 Project Foreman 2.00 wk 568 - - 500 - 1,068 18 Telephone Charges 1.00 mo - - - 82 82 20 Temporary Toilets 1.00 mo - - - 82 82 14 Safety 1.00 ls 213 - - 75 109 397 16 Misc. Tools 1.00 ls - - - 150 - 150 GENERAL CONDITIONS 2,201 1,125 1,419 4,745 240.00 Labor hours 240.00 Equipment hours 9000.000 FINISHES 10 Drywall Repair 4.00 ea 1,136 109 - - 109 1,353 10 Drywall Wall 1.00 ea 2,700 452 1,189 - 129 4,470 10 Anchor Removal and Floor Patch 4.00 ea 568 65 - - 633 FINISHES 4,404 626 1,189 238 6,457 16000.000 ELECTRICAL -sub Electrical Sub - 157 LP 9 1.00 ls - - 20,803 - - 20,803 -sub Electrical Sub - 157 LP 11 1.00 ls - - 20,364 - - 20,364 -sub Electrical Sub - LVT 157 LP 9 1.00 ls - - 7,136 - - 7,136 -sub Electrical Sub - LVT 157 LP11 1.00 ls - - 7,136 - - 7,136 ELECTRICAL 55,438 55,438 * unassigned * 6,605 626 56,627 1,125 1,657 66,640 240.00 Labor hours 240.00 Equipment hours Estimate Totals Description Amount Totals Hours Rate Cost Basis Cost per Unit Percent of Total Labor 6,605 240.000 hrs 8.93% Material 626 0.85% Subcontract 56,627 76.55% Equipment 1,125 240.000 hrs 1.52% Other 1,657 2.24% 66,640 66,640 90.09 90.09% Profit & Overhead 7,330 11.000 % T 9.91% 7,330 73,970 9.91 100% Total 73,970 DocuSign Envelope ID: F7806519-8AE9-4325-8E15-015E85B2B831