HomeMy WebLinkAbout109420 HYDRO CONSTRUCTION CO INC - CONTRACT - RFP - 8286 CONSTRUCTION CONTRACTOR FOR PROJECTS AT THE W (14)CONTRACT DOCUMENTS FOR WTF Replacement Project – High Priority CO2 Area Electrical The work is located at the City of Fort Collins Water Treatment Facility (WTF), Fort Collins, Colorado. The project involves design assistance and work with plant staff on investigation to determine final configuration of electrical equipment associated with the replacement of the existing panels in the CO2 area, particularly DDP 113, distribution panels. Based on final design procure identified materials and equipment, including long lead, critical path materials. Once materials and equipment are received, provide labor and miscellaneous electrical materials associated with the replacement of the existing panels (including patch and repainting of areas) in the CO2 area. Work is estimated to begin September 2017. The substantial completion date of the project is May 1, 2018. August 2017 ch2m 200 East 7th Street, Suite 314, Loveland CO 80537 ch2m Fort Collins Utilities 700 Wood Street Fort Collins CO 80521 Hydro Construction Company, Inc. 301 East Lincoln Avenue Fort Collins CO 80524 DocuSign Envelope ID: 9E6886E4-C64D-4A70-A1CD-70D586DFACFE WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Hydro Construction Company, Inc. DATED: June 20, 2016 Work Order Number: SCP-WTF-CO2-080517 Purchase Order Number: Project Title: WTF Replacement Project – High Priority CO2 Area Electrical Original Bid/RFP Number & Name: RFP # 8286, Construction Contractor for Projects at the Water & Wastewater Treatment Facilities (BU 5026310064.535010.6) Commencement Date: August 21, 2017 Completion Date: May 1, 2018 Maximum Fee: (time and reimbursable direct costs): $31,824 Project Description: Contractor to provide design, investigative, procurement, and installation services pertaining to the distribution panel, DDP 113, in the CO2 area of the WTF Scope of Services: Services shall include design and construction of electrical materials and equipment for the DDP 113 in the CO2 area at the WTF, as presented in the attached scope of work and cost estimate from Hydro. Contractor agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Construction Work Order Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Construction Work Order Agreement and this work order (including the attached forms) the Construction Work Order Agreement shall control. Notice to Proceed is hereby given upon receipt of a fully executed Work Order. CONTRACTOR By:_______________________________ Date:_____________________________ CITY OF FORT COLLINS Submitted By: _________________________ Special Projects Manager Date: _________________________ Reviewed by: _________________________ Chief Engineer Date: _________________________ Approved by: _________________________ Water Production Manager Date: ________________________ Approved by: _________________________ WR&T Manager Date: ________________________ Approved by: _________________________ Purchasing Director Date: ________________________ DocuSign Envelope ID: 9E6886E4-C64D-4A70-A1CD-70D586DFACFE 8/7/2017 8/8/2017 8/8/2017 8/8/2017 8/8/2017 8/9/2017 DocuSign Envelope ID: 9E6886E4-C64D-4A70-A1CD-70D586DFACFE City of Fort Collins Water Treatment Plant 7-21-17 CO2 Area Hydro Construction Company, Inc. - Scope of Services Provide design assistance and work with plant staff on investigative effort to determine final configuration of electrical equipment associated with the replacement of the existing panels for the CO2 area. Based on final design procure identified materials and equipment, including long lead, critical path materials. Once materials and equipment are received, provide labor and miscellaneous electrical materials associated with the replacement of the existing panels (including patch and repainting of areas) in the CO2 area. More specifically; DDP 113 a) Procure and install (1) 600A 480V, 3 wire, 65KASC NEMA 3R distribution panel with an internal SPD to replace the existing panel. i) We are investigating NEMA 4 and 4X options. b) Reconnect the existing power feeder into the new panel. We anticipate that the existing wire is long enough to re-use. c) Reconnect the branch wiring into the new panel. We anticipate that the existing wire is long enough to re-use. d) Temporary generator power will be provided to support any critical loads in this panel. e) The 480 volt panel will be de-energized for approximately 1 day f) Will work with plant staff to confirm the information listed on the panel’s schedules and trace out circuits that are not identified. We can begin investigative work on this panel as soon as work order is issued with critical path submittals to follow. g) This gear will arrive 12 weeks after submittals are approved. Cost estimate as shown on the attached, $31,824. DocuSign Envelope ID: 9E6886E4-C64D-4A70-A1CD-70D586DFACFE Standard Estimate Report Page 1 FCWTF HP CO2 Electrical 7/21/2017 11:23 AM Project name FCWTF HP CO2 Electrical Labor rate table Labor - Bare Equipment rate table Equipment Report format Sorted by 'Structure/Group phase' 'Detail' summary Allocate addons DocuSign Envelope ID: 9E6886E4-C64D-4A70-A1CD-70D586DFACFE Standard Estimate Report Page 2 FCWTF HP CO2 Electrical 7/21/2017 11:23 AM Item Description Takeoff Qty Labor Amount Material Amount Subcontract Amount Name Equipment Amount Other Amount Total Amount * unassigned * 1000.000 GENERAL CONDITIONS 20 Bonds 1.00 ls - - - 494 494 14 Project Manager 2.00 wk 710 - - 200 - 910 14 Project Foreman 2.00 wk 568 - - 500 - 1,068 18 Telephone Charges 0.50 mo - - - 41 41 20 Temporary Toilets 0.50 mo - - - 41 41 14 Safety 1.00 ls 213 - - 75 109 397 16 Misc. Tools 1.00 ls - - - 150 - 150 GENERAL CONDITIONS 1,491 925 685 3,101 160.00 Labor hours 160.00 Equipment hours 9000.000 FINISHES 10 Drywall Repair 1.00 ea 284 27 - - 27 338 10 Anchor Removal and Floor Patch 1.00 ea 142 16 - - 158 FINISHES 426 43 27 497 16000.000 ELECTRICAL -sub Electrical Sub - DDP 113 1.00 ls - - 25,073 - - 25,073 ELECTRICAL 25,073 25,073 * unassigned * 1,917 43 25,073 925 712 28,670 160.00 Labor hours 160.00 Equipment hours Estimate Totals Description Amount Totals Hours Rate Cost Basis Cost per Unit Percent of Total Labor 1,917 160.000 hrs 6.02% Material 43 0.14% Subcontract 25,073 78.79% Equipment 925 160.000 hrs 2.91% Other 712 2.24% 28,670 28,670 90.09 90.09% Profit & Overhead 3,154 11.000 % T 9.91% 3,154 31,824 9.91 100% Total 31,824 DocuSign Envelope ID: 9E6886E4-C64D-4A70-A1CD-70D586DFACFE