HomeMy WebLinkAbout109420 HYDRO CONSTRUCTION CO INC - CONTRACT - RFP - 8286 CONSTRUCTION CONTRACTOR FOR PROJECTS AT THE W (13)CONTRACT DOCUMENTS FOR WTF Replacement Project – High Priority WTF Room 203 Electrical The work is located at the City of Fort Collins Water Treatment Facility (WTF), Fort Collins, Colorado. The project involves design assistance and work with plant staff with investigative effort to determine final configuration of electrical equipment associated with the replacement of the existing lighting panels, other power panels and transformers. Once final design is reached procure long lead, critical path materials. Upon delivery, provide labor and miscellaneous electrical materials associated with the replacement of the existing lighting panels, and transformers (including patch and repainting of areas) in Room 203. Work is estimated to begin September 2017. The substantial completion date of the project is May 1, 2018. August 2017 ch2m 200 East 7th Street, Suite 314, Loveland CO 80537 ch2m Fort Collins Utilities 700 Wood Street Fort Collins CO 80521 Hydro Construction Company, Inc. 301 East Lincoln Avenue Fort Collins CO 80524 DocuSign Envelope ID: 3DC0C4EE-1B63-45A5-BD01-6934A29F0244 WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Hydro Construction Company, Inc. DATED: June 20, 2016 Work Order Number: SCP-WTFRm203-080517 Purchase Order Number: Project Title: WTF Replacement Project – High Priority Room 203 Electrical Original Bid/RFP Number & Name: RFP # 8286, Construction Contractor for Projects at the Water & Wastewater Treatment Facilities (BU 5026310064.535010.6) Commencement Date: August 21, 2017 Completion Date: May 1, 2018 Maximum Fee: (time and reimbursable direct costs): $57,137 Project Description: Contractor to provide design, investigative, procurement, and installation services pertaining to electrical equipment in Room 203 at the WTF Scope of Services: Services shall include design and construction of electrical materials and equipment associated with the lighting panels 153 LP30, 153 LP 32, 153 LVT1, and 153 PP4 in Room 203 at the WTF, as presented in the attached scope of work and cost estimate from Hydro. Contractor agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Construction Work Order Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Construction Work Order Agreement and this work order (including the attached forms) the Construction Work Order Agreement shall control. Notice to Proceed is hereby given upon receipt of a fully executed Work Order. CONTRACTOR By:_______________________________ Date:_____________________________ CITY OF FORT COLLINS Submitted By: _________________________ Special Projects Manager Date: _________________________ Reviewed by: _________________________ Chief Engineer Date: _________________________ Approved by: _________________________ Water Production Manager Date: ________________________ Approved by: _________________________ WR&T Manager Date: ________________________ Reviewed by: _________________________ Purchasing Director Date: ________________________ DocuSign Envelope ID: 3DC0C4EE-1B63-45A5-BD01-6934A29F0244 8/8/2017 8/8/2017 8/8/2017 8/8/2017 8/8/2017 8/9/2017 City of Fort Collins Water Treatment Plant – High Priority Room 203 Electrical 7-21-17 Room 203 Hydro Construction Company, Inc. - Scope of Services Provide design assistance and work with plant staff on investigative effort to determine final configuration of electrical equipment associated with the replacement of the existing lighting panels, other power panels and transformers. Once final design is reached procure long lead, critical path materials. Upon delivery, provide labor and miscellaneous electrical materials associated with the replacement of the existing lighting panels, and transformers (including patch and repainting of areas) in Room 203. More specifically; 153 LP 30 a) Procure and install (1) 208/120V, 100A, 10KASC panel with an external SPD to replace the existing lighting panel. b) Reconnect the existing power feeder into the new panel. We anticipate that the existing wire is long enough to re-use. c) Reconnect the branch wiring into the new panel. We anticipate that the existing wire is long enough to re-use. d) Temporary generator power will be provided to support any critical loads in this panel. e) The 480 volt panel will be de-energized for approximately 1 day f) Will work with plant staff to confirm the information listed on the panel’s schedules and trace out circuits that are not identified. We can begin investigative work on this panel as soon as soon as work order is issued with critical path submittals to follow. g) This gear will arrive 10 weeks after submittals are approved. 153 LP 32 a) Procure and install (1) 208/120V, 100A, 10KASC panel with an external SPD to replace the existing lighting panel. b) Reconnect the existing power feeder into the new panel. We anticipate that the existing wire is long enough to re-use. c) Reconnect the branch wiring into the new panel. We anticipate that the existing wire is long enough to re-use. d) Temporary generator power will be provided to support any critical loads in this panel. e) The 480 volt panel will be de-energized for approximately 1 day. f) Will work with plant staff to confirm the information listed on the panel’s schedules and trace out circuits that are not identified. We can begin investigative work on this panel as soon as soon as work order is issued with critical path submittals to follow. g) This gear will arrive 10 weeks after submittals are approved. 153 LVT 1 a) Procure and install (1) 15KVA, 3Ph 480 208/120v dry-type transformer. b) Reconnect the existing power feeder into the new transformer from MCC153. We anticipate that the existing wire is long enough to re-use. DocuSign Envelope ID: 3DC0C4EE-1B63-45A5-BD01-6934A29F0244 c) Reconnect the feeds to panels 153LP30 and 153LP32. We anticipate that the existing wire is long enough to re-use. d) Will work with the plant staff to confirm the information listed on the panel’s schedules and trace out circuits that are not identified. We can begin investigative work on this panel as soon as work order is issued with critical path submittals to follow. e) This gear will arrive 10 weeks after submittals are approved. 153 PP4 a) Due to the breakers not always turning off, suggests replacing the existing 480-volt power panel with a new panel with an external SPD. b) Reconnect the existing 480 volt power feeder into the new panel. We anticipate that the existing wire is long enough to re-use. c) Reconnect the branch wiring into the new panel. We anticipate that the existing wire is long enough to re-use. d) Temporary generator power will be provided to support any critical loads in this panel. e) The 480 volt panel will be de-energized for approximately 1 day. f) Will work with plant staff to confirm the information listed on the panel’s schedules and trace out circuits that are not identified. We can begin investigative work on this panel as soon as soon as work order is issued with critical path submittals to follow. g) This gear will arrive approximately 12 weeks after submittals are approved. Cost estimate as shown on the attached, $57,137. DocuSign Envelope ID: 3DC0C4EE-1B63-45A5-BD01-6934A29F0244 Standard Estimate Report Page 1 FCWTF HP RM 203 Elec 7/21/2017 11:47 AM Project name FCWTF HP RM 203 Elec Labor rate table Labor - Bare Equipment rate table Equipment Report format Sorted by 'Structure/Group phase' 'Detail' summary Allocate addons DocuSign Envelope ID: 3DC0C4EE-1B63-45A5-BD01-6934A29F0244 Standard Estimate Report Page 2 FCWTF HP RM 203 Elec 7/21/2017 11:47 AM Item Description Takeoff Qty Labor Amount Material Amount Subcontract Amount Name Equipment Amount Other Amount Total Amount * unassigned * 1000.000 GENERAL CONDITIONS 20 Bonds 1.00 ls - - - 887 887 14 Project Manager 4.00 wk 1,420 - - 400 - 1,820 14 Project Foreman 4.00 wk 1,136 - - 1,000 - 2,136 18 Telephone Charges 1.00 mo - - - 82 82 20 Temporary Toilets 1.00 mo - - - 82 82 14 Safety 1.00 ls 213 - - 75 109 397 16 Misc. Tools 1.00 ls - - - 150 - 150 GENERAL CONDITIONS 2,769 1,625 1,158 5,552 320.00 Labor hours 320.00 Equipment hours 9000.000 FINISHES 10 Drywall Repair 4.00 ea 2,130 109 - - 109 2,347 10 Anchor Removal and Floor Patch 4.00 ea 1,420 65 - - 1,485 FINISHES 3,550 174 109 3,833 16000.000 ELECTRICAL -sub Electrical Sub - 153 LP 30 1.00 ls - - 14,850 - - 14,850 -sub Electrical Sub - 153 LP 32 1.00 ls - - 10,850 - - 10,850 -sub Electrical Sub - 153 LVT 1 1.00 ls - - 5,311 - - 5,311 -sub Electrical Sub - 153 PP4 1.00 ls - - 11,080 - - 11,080 ELECTRICAL 42,090 42,090 * unassigned * 6,319 174 42,090 1,625 1,267 51,475 320.00 Labor hours 320.00 Equipment hours Estimate Totals Description Amount Totals Hours Rate Cost Basis Cost per Unit Percent of Total Labor 6,319 320.000 hrs 11.06% Material 174 0.30% Subcontract 42,090 73.67% Equipment 1,625 320.000 hrs 2.84% Other 1,267 2.22% 51,475 51,475 90.09 90.09% Profit & Overhead 5,662 11.000 % T 9.91% 5,662 57,137 9.91 100% Total 57,137 DocuSign Envelope ID: 3DC0C4EE-1B63-45A5-BD01-6934A29F0244