Loading...
HomeMy WebLinkAbout109420 HYDRO CONSTRUCTION CO INC - CONTRACT - RFP - 8286 CONSTRUCTION CONTRACTOR FOR PROJECTS AT THE W (12)CONTRACT DOCUMENTS FOR WTF Replacement Project – High Priority Mezzanine Room Electrical The work is located at the City of Fort Collins Water Treatment Facility (WTF), Fort Collins, Colorado. The project involves design assistance and work with plant staff on investigative effort to determine final configuration of electrical equipment, lighting panels 157 LP33, associated with the replacement of the existing lighting panels. Once final design is reached procure long lead, critical path materials. Upon delivery, provide labor and miscellaneous electrical materials associated with the replacement of the existing lighting panel (including patch and repainting of areas) in Mezzanine Electrical Room. Work is estimated to begin September 2017. The substantial completion date of the project is May 1, 2018. August 2017 ch2m 200 East 7th Street, Suite 314, Loveland CO 80537 ch2m Fort Collins Utilities 700 Wood Street Fort Collins CO 80521 Hydro Construction Company, Inc. 301 East Lincoln Avenue Fort Collins CO 80524 DocuSign Envelope ID: AA1F9EDF-4222-4F91-9B58-4047960F1766 WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Hydro Construction Company, Inc. DATED: June 20, 2016 Work Order Number: SCP-WTF-Mezz-080517 Purchase Order Number: Project Title: WTF Replacement Project – High Priority Mezzanine Room Electrical Original Bid/RFP Number & Name: RFP # 8286, Construction Contractor for Projects at the Water & Wastewater Treatment Facilities (BU 5026310064.535010.6) Commencement Date: August 21, 2017 Completion Date: May 1, 2018 Maximum Fee: (time and reimbursable direct costs): $36,495 Project Description: Contractor to provide design, investigative, procurement, and installation services pertaining to lighting panels in the Mezzanine Room at the WTF Scope of Services: Services shall include design and construction of electrical materials and equipment associated with the lighting panels 157 LP33 in the Mezzanine Room at the WTF, as presented in the attached scope of work and cost estimate from Hydro. Contractor agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Construction Work Order Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Construction Work Order Agreement and this work order (including the attached forms) the Construction Work Order Agreement shall control. Notice to Proceed is hereby given upon receipt of a fully executed Work Order. CONTRACTOR By:_______________________________ Date:_____________________________ CITY OF FORT COLLINS Submitted By: _________________________ Special Projects Manager Date: _________________________ Reviewed by: _________________________ Chief Engineer Date: _________________________ Approved by: _________________________ Water Production Manager Date: ________________________ Approved by: _________________________ WR&T Manager Date: ________________________ Approved by: _________________________ Purchasing Director Date: ________________________ DocuSign Envelope ID: AA1F9EDF-4222-4F91-9B58-4047960F1766 8/8/2017 8/8/2017 8/8/2017 8/8/2017 8/8/2017 8/9/2017 DocuSign Envelope ID: AA1F9EDF-4222-4F91-9B58-4047960F1766 City of Fort Collins Water Treatment Plant – High Priority Equipment 7-21-17 Mezzanine Electrical Room Hydro Construction Company, Inc. - Scope of Services Provide design assistance and work with plant staff on investigative effort to determine final configuration of electrical equipment associated with the replacement of the existing lighting panels. Once final design is reached procure long lead, critical path materials. Upon delivery, provide labor and miscellaneous electrical materials associated with the replacement of the existing lighting panel (including patch and repainting of areas) in Mezzanine Electrical Room. More specifically; 157 LP33 a) Procure and install (1) 208/120V surface mounted panel with an external SPD to replace the existing lighting panel. b) Reconnect the existing power feeder into the new panel. We anticipate that the existing wire is long enough to re-use. c) Reconnect the branch wiring into the new panel. We anticipate that the existing wire is long enough to re-use. d) Temporary generator power will be provided to support any critical loads in this panel. e) The 480 volt panel will be de-energized for approximately 1 day. f) Will work with plant staff to confirm the information listed on the panel’s schedules and trace out circuits that are not identified. We can begin investigative work on this panel as soon as work order is issued with critical path submittals to follow. g) This gear will arrive approximately 10 weeks after submittals are approved Cost estimate as shown on the attached, $36,495. DocuSign Envelope ID: AA1F9EDF-4222-4F91-9B58-4047960F1766 Standard Estimate Report Page 1 FCWTF HP 157 LP33 Elec 7/21/2017 11:35 AM Project name FCWTF HP 157 LP33 Elec Labor rate table Labor - Bare Equipment rate table Equipment Report format Sorted by 'Structure/Group phase' 'Detail' summary Allocate addons DocuSign Envelope ID: AA1F9EDF-4222-4F91-9B58-4047960F1766 Standard Estimate Report Page 2 FCWTF HP 157 LP33 Elec 7/21/2017 11:35 AM Item Description Takeoff Qty Labor Amount Material Amount Subcontract Amount Name Equipment Amount Other Amount Total Amount * unassigned * 1000.000 GENERAL CONDITIONS 20 Bonds 1.00 ls - - - 567 567 14 Project Manager 2.00 wk 710 - - 200 - 910 14 Project Foreman 2.00 wk 568 - - 500 - 1,068 18 Telephone Charges 0.50 mo - - - 41 41 20 Temporary Toilets 0.50 mo - - - 41 41 14 Safety 1.00 ls 213 - - 75 109 397 16 Misc. Tools 1.00 ls - - - 150 - 150 GENERAL CONDITIONS 1,491 925 757 3,173 160.00 Labor hours 160.00 Equipment hours 9000.000 FINISHES 10 Drywall Repair 1.00 ea 284 27 - - 27 338 10 Anchor Removal and Floor Patch 1.00 ea 142 16 - - 158 FINISHES 426 43 27 497 16000.000 ELECTRICAL -sub Electrical Sub - LP33 1.00 ls - - 29,209 - - 29,209 ELECTRICAL 29,209 29,209 * unassigned * 1,917 43 29,209 925 784 32,879 160.00 Labor hours 160.00 Equipment hours Estimate Totals Description Amount Totals Hours Rate Cost Basis Cost per Unit Percent of Total Labor 1,917 160.000 hrs 5.25% Material 43 0.12% Subcontract 29,209 80.04% Equipment 925 160.000 hrs 2.53% Other 784 2.15% 32,878 32,878 90.09 90.09% Profit & Overhead 3,617 11.000 % T 9.91% 3,617 36,495 9.91 100% Total 36,495 DocuSign Envelope ID: AA1F9EDF-4222-4F91-9B58-4047960F1766