HomeMy WebLinkAboutBID - 8452 DOWNTOWN RESTROOMS - OAK STREET RESTROOM BUILDING (2)ADDENDUM NO. 2
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of BID 8452: Downtown Restrooms - Oak Street Restroom Building
OPENING DATE: 3:00 PM (Our Clock) February 1, 2017
To all prospective bidders under the specifications and contract documents described above,
the following changes/additions are hereby made and detailed in the following sections of this
addendum:
Exhibit 1 – Questions and Answers
Please contact Gerry Paul, Purchasing Director at (970) 221-6779 with any questions regarding
this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
Exhibit 1
Questions and Answers
1. What is the construction budget for this project?
The City’s construction budget for this project is $220,000 - $330,000.
2. The door and hardware specifications seem to be incomplete. The original
drawings showed stainless, however, the value engineering to hollow metal was a
significant savings. Please confirm the door specification.
The City recommends a heavy duty galvanized hollow metal door and frame that will
resist corrosion from salt during winter months.
2.4 EXTERIOR HOLLOW-METAL DOORS AND FRAMES
A. Construct exterior doors and frames to comply with the standards indicated for
materials, fabrication, hardware locations, hardware reinforcement, tolerances,
and clearances, and as specified.
B. Maximum-Duty Doors and Frames: SDI A250.8, Level 4. For all exterior
hollow metal doors and frames, unless indicated otherwise.
1. Physical Performance: Level A according to SDI A250.4.
2. Doors:
a. Type: As indicated in the Door and Frame Schedule.
b. Thickness: 1-3/4 inches (44.5 mm.)
c. Face: Metallic-coated steel sheet, minimum thickness of 0.067
inch (1.7 mm), with minimum A40 (ZF120) coating.
d. Edge Construction: Model 2, Seamless.
e. Co: Manufacturer's standard polystyrene or polyisocyanurate.
3. Frames:
a. Materials: Metallic-coated steel sheet, minimum thickness of
0.067 inch (1.7 mm), with minimum A40 (ZF120) coating.
b. Construction: Full profile welded.
4. Exposed Finish: Factory primed.
3. Does the City wish to reuse plumbing fixtures?
The City does not intend to reuse the existing fixtures and plans to use new fixtures.