HomeMy WebLinkAboutWORK ORDER - BID - 7658 MISCELLANEOUS CONCRETE ANNUAL (11)Estimate
Date
6/1/2017
Estimate #
442
Name / Address
Robert Mosbey/City of Fort Collins
BANNER CONCRETE LLC
bannerconcrete@gmail.com
1313 Duff Drive Unit 3
Fort Collins, CO 80524
Project
Customer Signature
Total
Description Qty Cost Total
Garfield/Green Estimate
Remove concrete sidewalk per sq ft 2,156 3.66 7,890.96
Sawcut concrete/asphalt 0"<4" per lf 57.5 3.95 227.13
Remove concrete curb & gutter per lf 185.5 8.45 1,567.48
Excavation-General less than 50 cu yd 25.5 101.37 2,584.94
185.5Vertical curb & gutter-No sidewalk per lf 23.10 23.10
Flatwork--6" per sq ft 1,556 3.95 6,146.20
Pedestrian access ramp-Highback curb per sq ft 600 7.33 4,398.00
Truncated dome panel per sq ft 8 33.79 270.32
Barrier curb--6" x 18" per lf 112.5 25.91 2,914.88
Aggregate base course/Recycled base >5 tons 32.5 39.42 1,281.15
`100 Gallon water tank with pump, per day 6 128.38 770.28
Asphalt pavement preservation per lf 235 4.51 1,059.85
Stormwater protection-Rock filled wattle per lf 48 6.76 324.48
Traffic Control 1 2,151.23 2,151.23
_____________________________________
$31,610.00