Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7658 MISCELLANEOUS CONCRETE ANNUAL (11)Estimate Date 6/1/2017 Estimate # 442 Name / Address Robert Mosbey/City of Fort Collins BANNER CONCRETE LLC bannerconcrete@gmail.com 1313 Duff Drive Unit 3 Fort Collins, CO 80524 Project Customer Signature Total Description Qty Cost Total Garfield/Green Estimate Remove concrete sidewalk per sq ft 2,156 3.66 7,890.96 Sawcut concrete/asphalt 0"<4" per lf 57.5 3.95 227.13 Remove concrete curb & gutter per lf 185.5 8.45 1,567.48 Excavation-General less than 50 cu yd 25.5 101.37 2,584.94 185.5Vertical curb & gutter-No sidewalk per lf 23.10 23.10 Flatwork--6" per sq ft 1,556 3.95 6,146.20 Pedestrian access ramp-Highback curb per sq ft 600 7.33 4,398.00 Truncated dome panel per sq ft 8 33.79 270.32 Barrier curb--6" x 18" per lf 112.5 25.91 2,914.88 Aggregate base course/Recycled base >5 tons 32.5 39.42 1,281.15 `100 Gallon water tank with pump, per day 6 128.38 770.28 Asphalt pavement preservation per lf 235 4.51 1,059.85 Stormwater protection-Rock filled wattle per lf 48 6.76 324.48 Traffic Control 1 2,151.23 2,151.23 _____________________________________ $31,610.00