Loading...
HomeMy WebLinkAboutBID - 8484 ASPHALT SUPPLYAddendum 1 - Page 1 of 3 ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 8484: Asphalt Supply OPENING DATE: 3:00 PM (Our Clock) March 17, 2017 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Revised Bid Schedule Exhibit 2 – Questions & Answers Please contact Elliot Dale, Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing EXHIBIT 1 – REVISED BID SCHEDULE Addendum 1 - Page 2 of 3 BID SCHEDULE 8484 ASPHALT SUPPLY Hot Mix Asphalt Pricing (FOB Plant) ITEM ITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITY PRICE 403.10 HMA GR SX (PG 58-28) 20% RAP 2,000 tons $______________ /ton 403.15 HMA GR SX (PG 64-22) 20% RAP 2,000 tons $______________ /ton 403.20 HMA GR SX (PG 64-28) 20% RAP 2,000 tons $______________ /ton 403.25 HMA GR S (PG 58-28) 20% RAP 2,000 tons $______________ /ton 403.30 HMA GR S (PG 64-22) 20% RAP 30,000 tons $______________ /ton 403.35 HMA GR S (PG 64-28) 20% RAP 2,000 tons $______________ /ton 403.40 HMA GR SG (PG 64-22) 20% RAP 1,000 tons $______________ /ton Note: The quantities listed above are estimates only. The City of Fort Collins reserves the right to modify the quantities for any or all items listed. IN ADDITION TO THE BID SCHEDULE PRICES FOR EACH MIX DESIGN LISTED ABOVE, VENDORS MUST SUBMIT THE FOLLING LIQUID ASPHALT COSTS FOR THE 2017 SEASON. THESE COSTS ARE NOT TO BE ADJUSTED FOR THE ENTIRETY OF THE 2017 SUPPLY CONTRACT. THESE COSTS ARE INTENDED TO BE LOCKED IN FOR THE LENGTH OF THE CONTRACT FROM DATE SIGNED TO THE SAME DATE IN THE FOLLOWING YEAR. Asphalt Cement (PG 58-28) $________________ /ton Asphalt Cement (PG 64-22) $________________ /ton Asphalt Cement (PG 64-28) $________________ /ton NIGHT OR WEEKEND UP-CHARGE (OPTIONAL) $________________ /ton FIRM NAME Are you a Corporation, Partnership, DBA, LLC, or PC SIGNATURE PRINT NAME ADDRESS PHONE CELL PHONE EMAIL EXHIBIT 2 – QUESTIONS & ANSWERS Addendum 1 - Page 3 of 3 1. How will the COFC determine which plant they select to purchase from for each project they do? For example will the total delivered price to the project be used or will the asphalt price alone govern the selection? The City of Fort Collins will select which plant to use based on vicinity to the scheduled project, the quality of mix, etc.; however the price of the mix shall be the main driver of the selection. The City utilizes internal and external forces and trucks for their jobs, so calculating the delivered price is not an accurate representation of our needs. 2. Is there a list of streets available? This supply will be utilized by all of the Streets crews. The mix will be used with misc. patching efforts as well as full repaving of roadways and unexpected circumstances that may arise. The scheduled streets for repaving can be provided as it is currently scheduled after bid opening, but they are subject to change. 3. Will the COFC accept a qualification for night and weekend purchases? See attached Revised Bid Schedule, which includes pricing for optional night and weekend up-charge.