HomeMy WebLinkAboutPrebid - BID - 8469 CONCRETE MAINTENANCE PROJECT PHASE I2/15/2017 1 Streets Department Phase 1 Concrete February 15, 2017 Tom Knostman Pre-Bid Meeting • Street Maintenance Program (SMP) • Phase 1 Concrete Repair Contract #8469 • R4 Concrete (Remove, Replace, Repair, Restore) • Contract 1-year Contract with 4 Renewal Years • Engineers Estimate $2 million • 170 Working Days (March to December) • Liquidated Damages $1K per day • Milestones on 1/3 Dates (57 Working days) • Measured on dollar value completed, ¼, ½, Complete • Bids open March 1st 3:00 P.M. 2 2/15/2017 2 Remove and Replace Contract Example of typical work 3 • Notifications & Erosion Control • Traffic Control & Utility Locates • Demolition and Disposal of Waste • Subgrade Preparation • Form Placement and approval • Concrete Placement, Finishing, Cure Application • 48-hour 3000 PSI Concrete • Concrete Protection and Form Striping • Site Restoration and Temporary Asphalt • Site Clean Up and TC/Erosion Control Removal • Pay Application Preparation Projects Small, Medium and 4 Brown Farm area Cedar Village 1&2 areas 2/15/2017 3 Large Projects 5 Contract Issues typical work 6 • Full Time Project Inspection • Working Hours 7 a.m. to 6 p.m. • TCS Required on-site with approved TCP • TCP submitted to City Traffic 2 weeks ahead • SMP provides notices forms • Contractor distributes 5 working days ahead • Utility locates required before start • Segregate waste stream haul to Hoffman Mill • Crushed concrete base available Hoffman Mill $7.50/T • Work for home owners outside City Agreement; Permit • No work on weekends or City Holidays w/o approval 2/15/2017 4 Types of R4 Work Monolithic Residential 7 Driveover Curb, Gutter & 6” SW, And New ADA Drive Cut Types of R4 Work Monolithic Hollywood Curb, Gutter 8 2/15/2017 5 Types of R4 Work Vertical Curb and Flat work 9 Types of R4 Work ADA Attached Corner Rams and Drainage Pans 10 2/15/2017 6 Types of R4 Work ADA Detached Corner Rams 11 Milestone Requirements 12 CONTRACTUAL MILESTONES Milestone 1: Upon reaching one-third (1/3) of the contractual days allotted to complete the contracted work, one fourth (1/4) or twenty-five percent (25%) of the contracted value shall be exhausted. Milestone 2: Upon reaching two-thirds (2/3) of the contractual working days allotted to complete the contracted work, one half (1/2) or fifty percent (50%) of the contracted value shall be exhausted. Milestone 3 Upon working for the total amount of contractual working days, the Contractor must have reached substantial completion of the contracted project. 2/15/2017 7 Milestone Requirements 13 The Contract is for $1,000,000.00. The allotted working days are indicated to be 100. Milestone 1 $250,000 would need to be completed by the 33rd working day of the contract. Milestone 2 $500,000 would need to be completed by the 67th working day of the contract. Milestone 3 All projects identified in the contract documents under section 3500 would need to have reached substantial completion by the 100th working day of the contract. Important Projects Details Traffic Control Plans Worker PPE 14 2/15/2017 8 Important Contract Details • Traffic Control is a percent of cost of installations • Small Area Upcharge Items: For Small projects only • Weekly project meetings: Schedule • Environmental Management System Requirements • Dust Control • Erosion Control • Spill Containment • Equipment Idling Policy • Bonding & Insurance Requirements: Gerry Paul • Monthly Pay Apps: Generally paid in two weeks 15